Ministry : Ministry of Railways (North Western Railway)

Part II-Section 3-Sub-Section (ii)

Subject : Extra Ordinary

Analysis

Based on the title NEW DELHI, FRIDAY, MAY 8, 2026 / VAISAKHA 18, 1948 and the content, this is The Gazette of India – Extraordinary, Part II, Section 3(ii). It publishes notifications under the National Highways Authority of India Act, 1988, specifically a toll rate notification for the NE-7 (Bangalore–Chennai) Expressway project.

The document details: - Toll rates per kilometer for various vehicle categories on a 12-lane, greenfield expressway. - A 125% charge on the base rate for vehicles using the expressway. - 13 toll plazas between Hoskote (Karnataka) and Sriperumbudur (Tamil Nadu). - Distance matrix showing rates between consecutive plazas for different vehicle types. - Additional fees for structures longer than 60 meters (e.g., bridges, flyovers). - Vehicle classification and corresponding base rates (from ₹0.65 for light vehicles to ₹4.20 for oversized vehicles). - Effective date: May 8, 2026.


Overview

This gazette notifies the revised toll rates for the NE-7 Bangalore–Chennai Expressway, a major greenfield project under the National Highways Authority of India. The notification, issued under Section 7 of the NHI Act and Rule 3 of the National Highways Fee Rules, introduces a 125% fee on base rates across 13 plazas spanning Karnataka, Andhra Pradesh, and Tamil Nadu. The rates apply to vehicles from Km 0+700 to Km 262.794, covering Phase-I, II, and III of the expressway.


Key Points

  • Toll Structure:
  • 13 toll plazas with rates calculated per kilometer based on vehicle type.
  • Base rates range from ₹0.65 (cars) to ₹4.20 (oversized vehicles with 7+ axles).
  • 125% multiplier applied to all base rates (G.S.R. 107(E) dated 04.02.2026).
  • Vehicle Categories:
  • Cars, Jeeps, Vans (₹0.65/km)
  • Light Commercial Vehicles, Mini Buses (₹1.05/km)
  • Buses, Trucks (₹2.20/km)
  • Three-axle vehicles (₹2.40/km)
  • Heavy machinery and multi-axle vehicles (₹3.45–₹4.20/km)
  • Additional Toll for Structures >60m:
  • Calculated by converting structure length into equivalent road length (×10) and applying base rates.
  • Operational Details:
  • Toll collection via Closed User Fee Collection System.
  • Entry-exit basis: Charges based on actual distance traveled between plazas.
  • Effective from May 8, 2026.

Summary

The gazette formalizes the toll framework for the NE-7 Bangalore–Chennai Expressway, a critical infrastructure project enhancing connectivity across three states. It establishes transparent, distance-based tolling for diverse vehicle categories, integrates additional fees for long structures, and ensures systematic revenue collection through automated systems. This notification is vital for policy analysts, transport planners, and financial stakeholders involved in India’s highway expansion and monetization initiatives.

20EBKNLGH

20EBKNLGH

whatsapp-icon Back to top