ARUN MISHRA, AMITAVA ROY
CHHATTISGARH STATE INDUSTRIAL DEVELOPMENT CORPORATION LTD – Appellant
Versus
AMAR INFRASTRUCTURE LTD. – Respondent
ORDER :
1. Leave granted.
2. The appeals have been preferred by Chhattisgarh State Industrial Development Corporation Ltd. (in short, 'the CSIDC') and M/s. Raipur Construction Pvt. Ltd. being aggrieved by the judgment and order dated 14.02.2007 passed by the High Court of Chhattisgarh in Writ Petition (C) No.1053 of 2016 thereby allowing the same and quashing the contract given to M/s. Raipur Construction Pvt. Ltd. by the CSIDC with respect to the work of “upgradation of infrastructure i.e. roads, drainage system and water supply in Sirgitti under Modified Industrial Infrastructure Up-gradation Scheme (MIIUS) at Sirgitti, Bilaspur.”
3. Tender was floated by the CSIDC on 3.11.2015 for the aforesaid work within the stipulated time period of 18 months and tenders were invited online, to be submitted by 12.01.2016.
4. A writ petition bearing WP(C) No.227 of 2016, was filed challenging the notice inviting tenders issued by the CSIDC and the same was dismissed vide order dated 2.2.2016 by the High Court of Chhattisgarh, Bilaspur. The online bids were submitted. The CSIDC opened the ten
Login now and unlock free premium legal research
Login to SupremeToday AI and access free legal analysis, AI highlights, and smart tools.
Login
now!
India’s Legal research and Law Firm App, Download now!
Copyright © 2023 Vikas Info Solution Pvt Ltd. All Rights Reserved.