IAs Nos. 1868, 2091, 2225-27, 2380, 2568, 2937 with IAs Nos. 1991 of 2007, 3117, 3458-60, 3641, 3676, 3678, 3621, 2695 of 2009, IAs Nos. 3622-23, 3679, 3682 in IA Nos. 3622-23, 3679, 3682 in IAs Nos. 3622-23, IAs Nos. 2874, 2822-25, 2828, 2785 of 2010. 2939-40 of 2010 in 2782, 3023-3024 of 2011 with 2469, 3030 of 2011 and 3032 of 2011 in IAs Nos. 2939-40, IAs Nos. 3683-84, 2746-48 of 2009 in WPs (c) Nos. 202 of 1995, 2862 of 2010. 2894-95 of 2010, 2941 of 2010 in 2746-48 of 2009, 2629 of 2013 in 2746-48 in WP (C) No. 202 of 1995 with WP (C) No. 130 of 2011.
Decided On : 09-09-2013
Environment (Protection) Act, 1986 - Section 3(3) - Forest (Conservation) Act, 1980 - Wildlife(Protection) Act - Strengthening and repair of existing Dam - Project cost - Compensatory Afforestation Fund - Central Empowered Committee has been received and Para 7 of this Report is extracted - After considering that work relating to strengthening and repair of existing Dam is in public interest, that early repair of Dam is essential that there is no diversion of any sanctuary land and that Standing Committee of National Bord of wildlife has recommended the proposal - It is recommended that this Honble court may consider permitting strengthening and repair of the existing Dam situated at boundary of Forest Block - Therefore dispose of this application permitting applicant to strengthen and repair the existing dam situated at boundary of forest block Sadri of Kumbhalgarh wildlife Sanctuary, District subject to conditions (I) to (iv) mentioned in para 7 of Report of Central Empowered Committee extracted - Held, adverse impact of the project on the Wildlife Sanctuary is minimum and that the project has been cleared by Standing Committee of National Board for Wildlife it is recommended that this Honble Court may consider permitting use of 63.2485 hectare of non-forest land falling in Great Indian Bustard Wildlife Sanctuary in District for laying 220 KV Lamboti (Solapur)-Tuljapur double circuit Transmission Line by State Electricity Transmission Co. Ltd. Subject - Maharashtra State Electricity Transmission Company, applicant herein is permitted to undertake laying of the transmission lines 220 KVDC Tuljapur-Solapur-Lamboti electricity transmission line passing through Great Indian Bustard Sanctuary, Maharashtra subject to conditions mentioned in paras 4 and 5 of the Report of Central Empowered Committee extracted – Order accordingly.
ORDER :
Item No. 301
IAs Nos. 1868, 2091, 2225-2227, 2380, 2568 and 2937 in WP(C) No. 202 of 1995 (Lafarge Matter) regarding implementation of the directions of the Hon'ble Court as contained in Para-II guidelines to be followed in future cases of judgment dated 6.7.2011. Lafarge Umiam Mining Private Limited v. Union of India, (2011) 7 SCC 338)
1. We have heard Mr. Harish N. Salve,the learned Amicus Curiae. He submitted that as per the directions of this Court in , the Regulator should have been put in place under Section 3(3) of the Environment (Protection) Act, 1986. Mr. Mohan Parasaran, the learned Solicitor General, prayed for four weeks time to obtain instructions and apprise this Court as to when the direction of this Court will be complied with.
2. List these applications on 21st October, 2013.
Item No. 303
IAs Nos. 1991 of 2007 and IA No. 3117 in IA No. 1991 in WP(C) No. 202 Of 1995 (for directions and setting aside the report dated 18.09.2008 of the Central Empowered Committee)10
3. List These Applications On 30th September, 2013. Counsel for the State of Himachal Pradesh will file an affidavit one week before 30th September, 2013.
Item No. 305
IAs Nos. 3458-3460 in WP(C) No. 202 of 1995 (For impleadment, directions and exemption from filing official translation)
4. We call for a report from the Central Empowered Committee as well as reply from the State of Uttar Pradesh within a period of four weeks. List thereafter.
Item No. 306
IA No. 3641 in WP(C) NO. 202 of 1995 (Report of Central Empowered Committee in Application No.1352)
5. List the application on 30th September, 2013.
Item No. 307
IA No. 3676 in WP(C) No. 202 of 1995 (Report of Central Empowered Committee in Application No.1366)
6. The Report of the Central Empowered Committee has been received and Para 7 of this Report is extracted hereinbelow:
(i) 5% o the estimated project cost will be deposited in the Compensatory Afforestation Fund for conservation and protection of the Kumbhalgarh Wildlife Sanctuary;
(ii) 10mfct water will be reserved as live storage for wildlife habitat;
(iii) other conditions on which the Standing Committee of the National Board of Wildlife has cleared the proposal will be strictly complied with; and
(iv) any other condition stipulated by the Chief Wildlife Warden, State of Rajasthan will be strictly complied with.
7. We, therefore, dispose of this application permitting the applicant to strengthen and repair the existing dam at Latada situated at the boundary of the forest block Sadri of Kumbhalgarh wildlife Sanctuary, District Pali, Rajasthan subject to the conditions (I) to (iv) mentioned in para 7 of the Report of the Central Empowered Committee extracted above.
8. Report is accepted and application stands disposed of.
Item No. 308
IA No. 3678 in WP(C) 202 of 1995 (Report of Central Empowered Committee in Application No. 1367)
9. Para 5 of the Report of the Central Empowered Committee is extracted herein below:-
Login now and unlock free premium legal research
Login to SupremeToday AI and access free legal analysis, AI highlights, and smart tools.
Login
now!
India’s Legal research and Law Firm App, Download now!
Copyright © 2023 Vikas Info Solution Pvt Ltd. All Rights Reserved.