2016 Supreme(Bom) 1315

IN THE HIGH COURT OF JUDICATURE AT BOMBAY
SHALINI PHANSALKAR JOSHI, J.
Al-Falah Society - Appellants
Vs.
Municipal Corporation for Greater Mumbai - Respondent
APPEAL FROM ORDER NO.106 OF 2015 WITH CIVIL APPLICATION NO.137 OF 2015
Decided On : 04-10-2016

Advocates Appeared:
For the Applicant : Mr. Ashok Pandey.
For the Respondent:Mr. H.S. Deshpande, Senior Advocate a/w Mrs. Madhuri More.

Headnote:Mumbai Municipal Corporation Act, 1888 - Section 354-Civil Procedure Code, 1908, Order XXXIX, Rules 1 and 2-Grant of injunction.-Since suit building is beyond stage of repairs and need to be demolished for reconstruction hence trial Court rightly refused to grant injunction against corporation.

       It is clear that TAC has also considered the option, as given by the appellants, as to whether repairs can be carried out to the suit building without vacating it. However, on the basis of its own inspection and on the basis of report of the consultant and test reports categorically came to the conclusion that the suit building is beyond stage of repairs and need to be demolished for the purpose of reconstruction.

JUDGMENT :

1. This appeal takes an exception to the order dated 20th September, 2014, passed by City Civil Court, Mumbai, in Notice of Motion No.2333 of 2014 in L.C. Suit No.1759 of 2014. By the said order, Notice of Motion filed by appellants seeking relief of interim injunction restraining respondent Municipal Corporation from disturbing their possession, in the suit premises came to be dismissed.

2. As per case of appellants, they are in possession of various tenements in the building bearing C.T.S. No.44/46 situate at Ismail Curtey Road as tenants. Building is owned by the Municipal Corporation and it consists of ground plus three upper floors. It is their contention that their possession in the suit building is since prior to 1960 or thereabout. They are paying the rent regularly. The locality is such that it is conducive for their respective businesses and education of their children. In such situation on 28.5.2014, they received the notice issued by the Municipal Corporation, calling upon them to vacate the said building on the count that it has become dangerous and dilapidated and needs to be reconstructed. On receipt of this notice, appellants immediately replied the same. According to appellants, building is not at all in dangerous or dilapidated condition; it only requires some structural repairs which they are ready to carry out under the supervision of licenced Structural Engineer. They have informed accordingly to the Municipal Corporation vide letter dated 9.1.2014. However, Municipal Corporation is bent upon demolition of the building on the pretext of carrying out new construction thereon. It is urged that the respondents are also not providing any permanent accommodation to the appellants, but only temporary accommodation, that too, at Kurla or Paral, which is far away from the appellants' present place of residence. Hence according to appellants, the trial Court should not have refused to grant relief of ad-interim injunction, as claimed by the appellants, restraining Municipal Corporation from demolishing the suit building; especially when trial Court in its impugned order has observed that it is necessary to go into details of each and every fact, raised by both parties.

3. Per contra, learned counsel for respondent-Municipal Corporation has supported the impugned order of the trial Court, by pointing out that the Municipal Corporation has followed due procedure before passing the order requiring the suit structure to be demolished on the count that it has become dangerous and dilapidated. It is submitted that the structural audit of the suit structure was carried out and thereafter Technical Advisory Committee (for short “TAC”) has taken its own independent decision by following guidelines laid down by the Division Bench of this Court in Writ Petition No.1135 of 2014 vide order dated 24.6.2014. It is submitted that the Structural Consultant and TAC, which consists of the experts, had categorically recommended the demolition of the suit structure on the ground that it has become dilapidated and dangerous. It is submitted that, during the reconstruction of the said structure, temporary alternate accommodation will be provided to the appellants; therefore, they should not have any grievance.

4. In my considered opinion, though it is true that according to appellants as stated above the suit structure is not in such a dangerous and dilapidated condition making it necessary to demolish the same and requires only some repairs which they are ready to carry out, they had also made application for permission to that effect to the Municipal Corporation vide letter dated 9.1.2013. The structural audit conducted by the Municipal Corporation, through M/s. Joshi Consultants reveals that the suit structure needs to be reconstructed. The report of M/s. Joshi Consultants is produced on record at page No.162, which reveals that the Structural Engineer and Consultant have carried out detailed inspection of the suit building. Th