DELHI STATE CONSUMER DISPUTES
REDRESSAL COMMISSION, NEW DELHI
Hon’ble Mr. Justice J.D. Kapoor, President;
Mr. Mahesh Chandra & Ms. Rumnita Mittal, Members
GIAN SINGH—Appellant
versus
DELHI VIDYUT BOARD—Respondent
Appeal No. A-1646 of 2001—Decided on 31.5.2005

Advocates:
Counsel for the Parties :
For the Appellant :Mr. Asish Nischal, Advocate.
For the Respondent:Mr. Avinash Kumar, Advocate.

Headnote:(i)Consumer Protection Act, 1986 - Section 15 - Appeal against dismissal of complaint for deficiency in electricity service - Compensation for load shedding - Whether no compensation is payable ? (Yes, for uniform load shedding).(Para 7)

       (ii)Consumer Protection Act, 1986 - Section 15 - Appeal against dismissal of complaint for deficiency in Billing

       service - Provision for minimum payment - Complainant not consuming minimum units due to overloading by

       theft of electricity by the slum dwellers

       - Whether minimum payment provision can be applied when service is deficient ? (No) - Appeal partly allowed - Bills to be reduced as actual consumption even if below minimum payment provision.(Paras 8 & 9)

       Result : Appeal allowed in part.

       IMPORTANT POINT

       Although no compensation is payable by DVB for uniform load shedding but no provider of service can be allowed to charge for minimum payment when its service is deficient, as in this case of overloading by supply to slum dwellers who are doing large scale theft of electricity.

ORDER

Mr. Justice J.D. Kapoor, President—The complaint of the appellant seeking direction to the respondent who is a provider of electricity energy for not enforcing minimum payment rules because of the erratic electricity supply and also compensate the appellant for the loss of business suffered by him due to load shedding for 2 to 3 hours a day was dismissed vide impugned order dated 25.4.2001 passed by the District Forum. Feeling aggrieved, the appellant has preferred this appeal.

2. The appellant has an industrial shed allotted by DSIDC to the weaker sections of society at Khyala and is running a factory there. The respondent-DVB installed the electric meter for power connection and installed another meter for the use of light and charged rent and also enforced minimum payment rules. The allegations against the respondents are that it is having monopoly on the distribution of cheapest hydro-electric, thermal and nuclear power and gas based power. It sends bills after a gap of two months and also charges minimum charges in spite of the fact that supply has become totally erratic and is virtually in mess for the last 5-6 years as large scale theft of electricity is being indulged in by Jhuggi dwellers and big industrial units in collusion with the respondent. The appellant claimed that he never consumed electricity more than or equal to minimum slab imposed.

3. It is further alleged that there being rampant power cuts and sometimes no power supply for 12 hours at a stretch and on account of load shedding for 2 to 3 hours a day, has caused immense loss of his business and in the result, he could not pay the electricity bills which accumulated to the tune of Rs. 2,33,672.

4. The allegations of frequent breakdown and the load shedding though have been denied by the respondent yet the plea has been taken that these breakdowns are due to the attached accessories, damages for excess overloading than actual rating/capacity which are quite beyond the control of the respondent in transmission and distribution system. However, whenever there is failure in supply it is immediately attended to and restored.

5. The record produced by the respondent shows the details of power supply/load shedding/power failure/breakdown of 11 KV lines of Chand Nagar feeder w.e.f. 17.7.1999 to 30.8.1999 which is feeding the area of the appellants premises and support the claim of the appellant-complainant.

6. Consumers are concerned with the efficient service for which they pay consideration. Any fault, imperfection, shortcoming or inadequacy in the quality, nature and manner of performance which is required to be maintained by or under any law for the time being in force or has been undertaken to be performed by a person in pursuance of a contract or otherwise in relation to any service amounts to deficiency in service for which the service provider is liable to compensate the consumer as to the loss or injury suffered by him. At the same time, if a particular consumer is discriminated against, he is entitled for punitive damages.

7. In the instant case, there was load shedding for a particular duration, in order to maintain the supply and to avoid breakdown that may cause more loss or harm to the consumer, consumer cannot claim compensation as to the loss or injury suffered by him due to such uniformally applied load shedding. Load shedding, failure or breakdown are sometimes results of excessive loading than the actual rate or capacity.

8. This does not mean that provider of service can get away with deficiency in service, in the instant case, the appellant never consumed the electricity more than or equal to minimum slab in force. No provider of service which is deficient in service can be allowed to charge the consumer more than what he actually consumes merely because there is no provision for minimum payment. Such rules are applicable where there is no deficiency in service. On the one hand, the respondent has not denied that there are occasional failure or