NATIONAL CONSUMER DISPUTES REDRESSAL COMMISSION, NEW DELHI
Anup K. Thakur, Presiding Member
M/s. Manglam Build-Developers Ltd.
and Ors. —Appellants
versus
Aviral Mathur and Anr. —Respondents
First Appeal No.993 of 2015
(Against the Order dated 06/11/2015 in Complaint No.28/2014 of the State Commission Rajasthan)
Decided on 12.1.2021
Counsel for the Parties:
For the Appellants:Mr. Sukumar Pattjoshi, Sr. Advocate with Mr. Sunil Mund, Advocate
For the Respondents:Mr. Debesh Panda, Advocate with Mr. Naman Maheshwari, Advocate
IMPORTANT POINT
Compensation for defects and deficiencies in housing project allowed.
Headnote:
Consumer Protection Act, 1986—Sections 19 and 2(1)(g) : [Consumer Protection Act, 2019—Sections 41 and 2(11)]—Housing—Defective constriction—Compensation—Allegedly instead of marble flooring, vitrified tiles have been provided no kitchen garden provided, sewage treatment plan not provided, floating terrace not provided, club house facility not functioning etc.—Impugned order of State Commission to pay a consolidated amount of Rs. 2 lakh as compensation for the defects and deficiencies in the construction found evidence baud, therefore upheld—However, direction from restraining the extension of club facilities to other, direction for construction of 6’ feet high boundary wall, constructions of CC road at entrance, etc., found not justified—Therefore, payment of consolidate Rs. 2 lakh for defects and deficiencies in construction with interest @ 6% p.a., upheld—Rest of the order of State Commission for common facilities and costs set aside. (Paras 22 to 28)
Result: Appeal allowed partly.
ORDER
Anup K. Thakur, Presiding Member.—This First Appeal No.993 of 2015 has been filed challenging the order dated 06.11.2015 of the Rajasthan State Consumer Disputes Redressal Commission, Jaipur (for short, ‘State Commission’) in C.C. No.28 of 2014. The impugned order, for ease of reference, is reproduced below:
“19. The present complaint of complainants is allowed jointly and severally against the opposite parties as follows:
(a) The Opposite Parties shall pay to the complainants consolidated amount of Rs.2 Lacs (Rupees Two Lacs Only) as compensation for the defects and deficiencies in the construction.”
(b) We restrain the opposite parties from extending the Club House facilities created for the residents of Manglam Arpan, the Villas to any of it’s projects viz. Manglam Arpan Residency, the Premium Residential Apartments.
(c) We further direct the Opposite parties to:-
(i) to construct 6’ feet high boundary wall on the fourth remaining side of the campus.
(ii) to construct the 30’ feet and 40’ feet wide CC road at the entrance and in the entire campus.
(iii) to provide/fix glasses in the MS railing in the stairs.
(iv) The opposite parties shall also pay to the complainants Rs.11,000/- (Rupees Eleven Thousand Only) as cost of proceedings.
The compliance of the order shall be made within one month.”
2. C.C. No.28 of 2014 had been filed, as noted in the impugned order, alleging the following deficiency and defects in the villa:
“a) Vitrified tiles have been provided in Drawing and Dining Room and Kitchen instead of Marble flooring;
b) Interlocking pavers not provided;
c) Kitchen Garden not provided;
d) MS Railing with glass not provided;
e) Electrical circuits not provided at suitable places;
f) Provision for AC not kept in the room;
g) Internet connection was not provided;
h) DTH installation was not provided;
i) Power backup was not provided as promised;
j) Bitumen entrance road provided in place of cc road;
k) Security arrangements not inadequate;
l) Surrounding Wall around campus was not constructed;
m) Sewage Treatment Plan was not provided;
n) Floating Terrace not provided;
o) Club House not functioning;
p) Landscape Garden was not provided;
2. Besides these defects the complainants alleged that the opposite party has developed another project-Manglam Arpan Residents-Premium Residential Apartments. The complainant alleged that Club House facility provided for the Manglam Arpan Villa is being shared with the residents of the apartments, while both these projects are different and also no common entrance for these projects is permissible”.
And making the following prayer for reliefs:
“a) Pass an order directing the Respondents not to allow anybody else to enter the club house of Manglam Arpan, the Villas except the residents and their guests.
b) Pass an order directing the Respondents to rectify and provide all the services/facilities as promised specifically in the Brochure within a maximum time period of three months.
bb) In the alternative, if the Respondents fail to provide such services/facilities, direct the Respondents to pay a compensation of Rs.20,66,000 (Twenty lacs sixty-six thousand) towards the loss of the value and utility in the said property.
c) Pass an order directing the Respondents to reimburse Rs.1,27,000/- (One lac twenty seven thousand) for out of pocket expenses incurred by the Complainants.
d) Pass an order directing the Respondents to pay damages to the tune of Rs.12,00,000/- (twelve lacs) for the mental harassment and suffering caused to the Complainants.
e) Pass an order directing the Respondents to reimburse the costs of the proceedings to the Complainants.
f) Pass any other order it deems fit in the interest of justice, equity and good conscience.”
3. A brief look at the facts reveals that the respondents/complainants (complainants hereinafter) had, on 16.1.2013, booked villa no. 17 in Manglam Arpan on a plot measuring 165 sq. ya