2014 Supreme(Ker) 645
High Court of Kerala
A.V. RAMAKRISHNA PILLAI, J.
A.V. Antony
Versus
Corporation of Cochin, rep. by Secretary, Ernakulam & Others
WP (C) No. 27248 of 2012 (E)
Decided On : 08-12-2014
For the Petitioner:G. Gopakumar, (Aluva), Anupama Johny, Advocates.
For the Respondents:R1 & R2, Dileesh John, P.K. Soyuz, Senior Counsels, Cochin Corporation, R3, J. Prakash C. Vadakkan, SC, KCZMA, R4, Nalini Chidambaram, Sr. Advocate, M. Gopikrishnan Nambiar, P. Gopinath, P. Benny Thomas, K. John Mathai, Joson Manavalan, Saji Varghese Kakkattumattathil, Advocates.
Headnote:Constitution of India, 1950 Articles 21 and 226 Environment (Protection) Act, 1986 - It is violative under CRZ notification to construct the building above the tide line and it provides that it is also violative under article 21 of the constitution
1. The petitioner, who is residing on the western side of Chilavannur lake/kayal (backwaters), has come up with this writ petition alleging that the 4th respondent has constructed a multi storeyed building within a distance of 100 metres from the High Tide Line (HTL) of the said lake violating Coastal Regulation Zone Notification (CRZ Notification).
2. The petitioner alleges that as per CRZ Notifications, 1991 and 2011, construction is not permissible within the distance of 100 metres from the side of Chilavannur lake. The petitioner further alleges that he has submitted several complaints to respondents 1 to 3 alleging that the 4th respondent has constructed the building in violation of the CRZ Notification. However, they have not taken any steps to stop the alleged construction. It is the definite case of the petitioner that the 4th respondent has not produced 'No Objection Certificate' (NOC) from the Kerala Coastal Zone Management Authority (KCZMA) (3rd respondent) along with the application for permit.
3. It is further alleged that the committee constituted by the KCZMA has directed the Secretary of the Corporation of Cochin (1st respondent) through Ext.P6 to verify the on going constructions on either side of the backwaters and to issue stop memo to those who violate the provisions of CRZ Notification, 1991 with respect to their position/location. However, the 1st respondent has not taken any steps to implement the direction.
4. The 3rd respondent informed the petitioner as per Ext.P7 letter dated 22.02.2011 that the 3rd respondent had issued directions to the 1st respondent to stop the unauthorised construction violating the CRZ Notification. The petitioner further alleges that after receiving Ext.P7, though he submitted Exts.P10, P11 and P12 applications to the Secretary, Cochin Corporation, requesting to take steps to stop the construction of the buildings by the 4th respondent and to demolish the constructions which violated the CRZ norms, the 1st respondent has not taken any steps to dispose of the applications. It is with this background, the petitioner has come up before this Court.
5. The 1st respondent though entered appearance has not filed any counter affidavit.
6. The 3rd respondent filed counter affidavit stating as follows:
According to the 3rd respondent, the construction in the areas covered by CRZ Notification could be made only with the prior approval of the KCZMA/Ministry of Environment and Forest (MoEF), Government of India. According to them, the Chilavannur lake is connected to Vembanad backwaters through a network of canals. The water body has tidal influence from the sea. The banks of the backwater have Coastal Regulation Zone as per the Coastal Zone Management Plan of the State. The CRZ in the area is 100 metres from the HTL of the backwaters. The area where the construction was made has CRZ I and II as per the CRZ Notification.
It was further contended that the development site was part of low-lying areas such as filtration pond/paddy field, which were reclaimed before 2009. Reclamation of another small portion was also carried out after 2009 as per the report submitted by Centre for Earth Science Studies (CESS) in September, 2011. It was further contended that the reclamation is a prohibited activity as per CRZ Notifications 1991 and 2011 and amounts to violation of provisions of CRZ Notification, 1991. They would further contend that CRZ clearance for the project has not been issued till date and construction was started without CRZ clearance.
It was further contended that the construction is made after reclaiming the wetland-pokkali field which was classified as CRZ I (i) areas that are ecologically fragile. The total plinth area of construction was above 20000m2 and, therefore, it requires Environmental Impact Assessment (EIA) clearance. The 100 metres from HTL of backwater landward in the area on both sides are declared as Coastal Regulated Zone and constructions are regulated in t