2005 Supreme(Mad) 1650

High Court of Judicature at Madras
THE HONOURABLE CHIEF JUSTICE MR. MARKANDEY KATJU & THE HONOURABLE MR. JUSTICE A. KULASEKARAN
The Executive Engineer-IV & Another - Appellant
Versus
Varadha Steels & Others - Respondents
W.A. No.1694 & W.A.M.P. Nos.3274 & 3128 and W.P.No.27467 of 2005 & WPMP No.29901 and W.P. No.25568 & WPMP No.27991 of 2005
Decided On : 04 October 2005

Advocates Appeared: For the Appellants:T. Murugesan, Govt. Pleader, Pondicherry. For the Respondents:R. Thiagarajan, Senior Counsel for C.S. Krishnamoorthy, Advocate.

Writ petition against provisional assessment order can not be entertained.

Headnote:Electricity Act (IX of 1910) - Electricity Act (77 of 2003), Sec. 126 and Explanation (a) and Sec.185(2) (a) -Appointment of Assessing Officer-Assessing Officer appointed under old Act to be deemed appointed under New Act with authority and jurisdiction till appointment of another person-So far provisional assessment order is concerned, writ petition being premature can not be entertained.

Judgment :-

(Appeal under Cl.15 of the Letters Patent against the order dated 18.08.2005 made in W.P.M.P. No.27991 of 2005 in W.P. No.25568 of 2005.)

Markandey Katju, C.J.

W.P. No.27467 of 2005: -

This Writ Petition has been filed for the issuance of a writ of certiorari against the impugned order dated 17.8.2005 passed by the first respondent, the Superintending Engineer-III, Electricity Department, Pondicherry, under Section 126 (3) of the Electricity Act, 2003, by which the writ petitioner was provisionally assessed to pay electricity charges to the tune of Rs.2,65,37,000/- and was permitted to file objections against the same.

2. The aforesaid notice dated 17.08.2005 reads as follows:-

" No.6386/ED/SE-III/AE-Tech/F.39/HT-VAD

Steel/2005-2006

GOVERNMENT OF PONDICHERRY

ELECTRICITY DEPARTMENT

ASSESSMENT NOTICE FOR THEFT OF ENERGY

Pondicherry, the 17th August, 2005

To

M/s Vardha Steels

R.S.No.122/1 & 122/6,

Thuthipet, Villianur Commune,

Pondicherry 605 502.

Sub: Theft of electricity in the premises of M/s Varadha Steels, Sedarapet – Provisional Assessment notice for payment of Extra levy – Reg.

Ref:

(1) Show Cause Notice of this department No.2270/ED/EE-IV/JE/F.HT(M/s Varadha Steels)/05-06, dated 05/08/2005.

(2) Your Letter No.Nil, dated 06/08/2005 & 09/08/2005.

- ooo -

With reference to the above subject matter, theft of energy in the following mode has been reported in your industrial premises viz., M/s Varadha Steels, at R.S. No.122/1 & 122/6, Thuthipet, Villianur Commune, Pondicherry 605 502:-

(i) The position of the metering cubicle Air Break (sic) switch handle with base plate along with seal has been shifted by removal of bolt & nut.

(ii) The metering cubicle Air Break switch was in opened condition.

(iii) Fresh pipe wrench-grip markings were visible on the Air Break switch operating vertical pipe.

(iv) One screw-driver with green plastic handle and one Mild Steel (MS) pipe of about 1½' length were found lying on the nearby earth pit.

(v) The rear gate was found locked inside with departmental seal intact.

(vi) Departmental seals provided on the metering cubicle cover and metering box were intact.

In the presence of the Police Officials, the seals provided on the metering box were removed and the data stored in the memory of the static type (L&T make) Trivector Meter Serial No.04183200 were down loaded in the Common Meter Reading Instrument (CMRI) of the Ramanathapuram O & M by the High Tension Metering Wing. The data down loaded from the meter on 29/07/2005, has been analyzed and it is observed that there was no supply to the meter since 21/07/2005 at 03.17 Hrs. and hence there was also no recordings even though electricity supply was there and your factory had also availed power supply. Moreover you have not complained about non-availability of power supply prior to 29/07/2005. The non-recording of the meter reveals that you have indulged in theft of power and power supply to your industry has been availed by disrupting the supply to the metering circuit.

The meter was tested by the High Tension Metering wing on 03/08/2005 around 16.30 Hrs. in the presence of the officials from Revenue Department, Police Department, Electricity Department & representative of your company Thiru Jaffer Ali, Office Administrator and the recording performance of the meter was found to be normal. While testing the healthiness of the metering cubicle, it was found that the R-phase & B-phase fuses provided in the Low Tension terminal box of the metering cubicle were blown off which had resulted in non-availability of voltage, which ultimately affected the functioning of meter. On further check up of the wires that connect the secondary terminal of the metering cubicle and the meter terminals, pin-pierced impressions were noticed in the wires. The data down loaded from the above meter also indicates the message 'updating of the data stopped' since 21/07/2005 at 03.17 Hrs. After analyzing the consumption recorded in the meter at your industrial premises and the relevan
































Click Here to Read the rest of this document
1
2
3
4
5
6
7
8
9
10
11
SupremeToday Portrait Ad
supreme today icon
logo-black

An indispensable Tool for Legal Professionals, Endorsed by Various High Court and Judicial Officers

Please visit our Training & Support
Center or Contact Us for assistance

qr

Scan Me!

India’s Legal research and Law Firm App, Download now!

For Daily Legal Updates, Join us on :

whatsapp-icon Back to top