2007 Supreme(Mad) 3107
Before the Madurai Bench of Madras High Court
THE HONOURABLE MR. JUSTICE A.C. ARUMUGAPERUMAL ADITYAN
Melegaram Town Panchayat, rep. by its Administrative Officer, Tenkasi
Versus
Roman Catholic Mission Sarveswaran Tiruchabai, St. Michael Athiluthar Thiruchabai rep. by Rev. Father, Tenkasi
Second Appeal (MD) No. 691 of 2006
Decided On : 25-09-2007
Important Points
Subject
Property Law - Easements
Headnote
K. V. Subramanian, Senior Counsel for M. A. Abdul Wahab. T. S. R. Venkataramana, Advocate.
A.C. ARUMUGAPERUMAL ADITYAN, J.
The defendant in O.S.No. 181 of 2002 on the file of the Court of District Munsif, Tenkasi, who had lost his defence before the Courts below is the appellant herein.
2. The respondent/plaintiff Roman Catholic Mission Sarveswaran Church had filed the suit for declaration of the frontage for the plaintiff in respect of the plaint schedule No. 2 property from plaint schedule No. 1 and for permanent injunction restraining the defendant from in any manner obstructing the said frontage and also for mandatory injunction for the removal of the constructions by the defendant in plaint schedule item No. l property. The short facts of the plaint relevant for the purpose of this appeal are as follows:
The plaint schedule properties are situated on the Tenkasi-Kutralam Main Road. The plaintiff can have access only through plaint item No. 1 to item No. 2 property which is a vacant site and on the ground of easement of necessity also plaintiff requires the said access to item No. 2 through item No. 1 of the plaint schedule. The right of ingress and aggress to item No. 2 plaint schedule property in the plaint is only through plaint schedule item No. 1 property. Plaint item No. 2(1) was purchased by the plaintiff through a sale deed dated 22.9.2000 in the Revenue records item No. 2(2) was recorded as cemetery, item No. 2 (2) is being used by the plaintiff for the burial of the dead persons who belong to Christianity. The plaintiff is making all attempts to construct a prayer hall and a community hall in item No. 2(1) of the plaint schedule property. The first defendant is making attempts to construct a toilet in plaint schedule item No. 1 property on 3.7.2002. They have collected building materials like stones, sand in plaint item No. 1 on 4.7.2002 and they have also dug-up the foundation in the plaint schedule item No. 1. If the defendants are allowed to construct the toilet in the item No. 1 of the plaint schedule, then it will obstruct the right of ingress and egress of the plaintiff to reach the plaint schedule item No.2 property through plaint item No. 1. The construction of a toilet in plaint schedule item No. 1 will be a health hazard to public and it will also affect the sentiments of the minority Christians. Hence, the suit. The defendant in his written statement has contended that the plaint item No. 1 was not mentioned in the schedule to the plaint. In plaint schedule item No. 1 the defendant is constructing a toilet exclusively for the use of women folk in village natham S. No. 622, which has been classified as road poramboke, with the help of Tenkasi MLAs Rural development fund. The defendant had proposed to construct the toilet as per the resolution of the Melagaram Panchayat Union dated 7.5.2002. The said toilet is being constructed in the poramboke in S. No. 622. On both the sides of Tenkasi Main Road is the residential locality, women folk conducted themselves in a way to cause health hazard to the public. The environmental pollution had occurred due to the conduct of then. The public who are going for a morning walk at Melagaram village found it very difficult to walk along the said road. That is why the toilet has been constructed in the suit property. The contention of the plaintiff is that if the toilet is allowed to be constructed near the cemetery, it will cause health hazard, is not true and a bore-well two over head tanks have also been installed and constructed respectively near the toilet and for the motor pump sets electricity connection has also been obtained by the defendant. The defendant has also proposed to engage two environmental assistants to keep the toilet clean. There is an entrance to the burial ground with a width of 10 feet. The toilet was not constructed in a way to obstruct the passage to the burial ground. From the Tenkasi-Kutralam main road there is no hindrance to anyone who pass through the said gate to the graveyard, in Melagram Panchayat union there ar