Injunction - Construction of Building - Code of Civil Procedure, 1908 (CPC) - Order XXXIX Rule 1 & 2, Section 151 - Sikkim Land Revenue Act - [CPC Order XXXIX Rule 1 & 2, Section 151, Sikkim Land Revenue Act]
Fact of the Case:
The Appellants sought to stop the Respondents from constructing a building on the suit premise, claiming irreparable loss if construction continued. The Respondents argued that the application was infructuous and the balance of convenience favored them.
Finding of the Court:
The Court found that construction had commenced during the appeal, changing the nature of the property. It noted the absence of urgency for construction and the potential for multiplicity of litigation. The Court held that the Respondents must be restrained from construction during the appeal.
Issues: Urgent construction during appeal, balance of convenience, irreparable loss, changing nature of property, multiplicity of litigation
Ratio Decidendi: Prima facie case, balance of convenience, irreparable injury, changing nature of property during appeal, absence of urgency for construction
Final Decision: The Court directed the Respondents to maintain status quo on the construction as on date and prohibited further construction during the appeal.
Advocate Appeared:
For the Appellants :Mr. B. Sharma, Senior Advocate with Mr. B.N Sharma, Advocate.
For the Respondent:Mr. S.S Hamal, Ms. Priyanka Chhetri and Ms. Sushma Lepcha, Mr. S.K Chettri, Asst. Govt. Advocate.
JUDGMENT :
This is an application under Order XXXIX Rule 1 & 2 read with Section 151 of Code of Civil Procedure, 1908 (CPC). The application has been preferred by the Appellants on 31.03.2018.
2. It is pleaded that the Appellants were informed that Respondent No.1, 2 and 3 are hurriedly constructing one permanent new building on the suit premise.
3. It is further pleaded that the Appellant No.1 without wasting time, went to the spot on 26.03.2018 and found that the Respondent No. 1, 2 and 3 were hurriedly constructing the building in the suit premise and found that RCC posts were also erected. Photographs taken have also been annexed to the said application as Annexure-P1 Colly.
4. The Appellants further pleads that they had requested the Respondents not to continue with the construction which was undertaken at a rapid pace. The Appellants submits that if the construction of the building is continued, the nature and character of the suit property would change completely, permanently and irrevocably and the Appellant would be highly prejudiced and would suffer irreparable loss.
5. The Respondent No.2 has filed a reply to the said application. It is submitted by the answering Respondent that the application is liable to be dismissed as it is filed on a wrong assumption of the Appellants that there is still a dispute with regard to the possession of the Respondent No.1, 2 and 3 for determination by the Hon’ble Court in the present Appeal. It is further submitted by the answering Respondents that the khas possession of the suit property is jointly with the Respondent Nos.1, 2 and 3 which was neither denied nor challenged by the Appellants in the present Appeal. The answering Respondent would further submit that the application has become infructuous for the fact that the Respondents have already now completed major portion of the construction of the building in question.
6. It is submitted that no prejudice or irreparable loss/ injury would be caused to the Appellants if the said application is rejected by this Court at this stage. In fact to the contrary, great prejudice and irreparable loss would occasion the Respondents if at this stage the said application is allowed in favour of the Appellants as it would not only result in loss and damage to the building materials like cement, sand etc purchased at heavy cost by the Respondent No.1 to 3 but also the men and machinery hired by Respondents for the aforesaid construction on payment would go idle.
7. The answering Respondent further submits that the said application is liable to be dismissed as the balance of convenience and inconvenience is not in favour of the Appellants but in favour of Respondent No.1, 2 and 3.
8. To substantiate the statements made by the answering Respondents that the construction has reached an advanced stage now, photographs have been shown to this Court today by the learned Counsel for the Respondents. The said photographs are kept on record and marked X1 to X8.
9. The Appellant herein who is the original Plaintiff in the Title Suit No.07/2014 filed by them has sought for the following reliefs:-
“(a) for a declaration that the lands covered by khasra Nos. 76, 77 and 78 measuring .2600 Hects., 1.3500 Hects and .1500 Hects. standing in the name of late Topching Bhutia @ Topchen Bhutia (Lama) are the ancestral property of the plaintiffs;
(b) for a declaration that defendant no.1 after her marriage with Shri Passang Sherpa is a Sherpa and she is not entitled to the property of late Topching Bhutia @ Topchen Bhutia (Lama);
(c) for a declaration a that the plaintiffs are entitled to right, title and interest in the property left by their grandfather late Topching Bhutia @ Topchen Bhutia;
(d) for a declaration that the order dated 30.05.2003 passed by the learned Sub-Divisional Magistrate, Namchi (defendant No.6) allowing mutation of plot No.76 under khatiyan No.21 from the name of late Topching Bhutia @ Topchen Bhutia (Lama) to the name of defendant No.1 is arbitrary, ill