Page 1 of 43
APPELLATE TRIBUNAL FOR ELECTRICITY AT NEW DELHI
(APPELLATE JURISDICTION)
APPEAL NO. 292 OF 2022 &
IA NO. 1010 OF 2022
Dated: 24th February, 2023
Present:
Hon’ble Mr. Justice Ramesh Ranganathan, Chairperson
Hon’ble Mr. Sandesh Kumar Sharma, Technical Member
In the matter of:
1.
Inox Green Energy Services Ltd.
Inox Towers, Plot No. 17
Sector-16 A, Film City
Noida – 201301.
2.
Haroda Wind Energy Pvt. Ltd.,
301, ABS Tower
Old Padra Road
Vadodara,
Gujarat – 390007.
3.
Khatiyu Wind Energy Pvt. Ltd.,
301, ABS Tower
Old Padra Road
Vadodara,
Gujarat – 390007.
4.
Ravapar Wind Energy Pvt. Ltd.,
301, ABS Tower
Old Padra Road
Vadodara,
Gujarat – 390007.
5.
Vigodi Wind Energy Pvt. Ltd.,
301, ABS Tower
Page 2 of 43
Old Padra Road
Vadodara,
Gujarat – 390007
.…
Appellant(s)
Versus
1.
Central Electricity Regulatory Commission
3rd & 4th Floor, Chanderlok Building,
36, Janpath,
New Delhi – 110001
2.
Solar Energy Corporation of India Limited
6th Floor, Plate – B, NBCC Office Block,
Tower – 2, East Kidwai Nagar,
New Delhi – 110023
3.
Haryana Power Purchase Centre
Shakti Bhawan, Sector – 6,
Panchkula, Haryana – 134 109
4.
Uttar Pradesh Power Corporation Limited
Shakti Bhawan, 14 Ashok Marg,
Lucknow, Uttar Pradesh – 226001
...
Respondent(s)
Counsel for the Appellant(s)
:
Mr. Gopal Jain, Sr. Adv.
Mr. Naveen Chawla
Mr. Rishabh Kumar Thakur
Mr. Mayank Bughania
Counsel for the Respondent(s)
:
Mr. M. G. Ramachandran, Sr. Adv.
Ms. Anushree Bardhan
Ms. Srishti Khindaria
Mr. Aneesh Bajaj
Ms. Surbhi Kapoor
Ms. Tanya Sareen for R-2
Page 3 of 43
O R D E R
PER HON’BLE MR. JUSTICE RAMESH RANGANATHAN, CHAIRPERSON
1.
This Appeal is preferred against the Order passed by the Central
Electricity Regulatory Commission (for short “CERC”) in IA No. 23 of 2022 in
95/MP/2022 dated 29.06.2022. The Appellant herein filed an IA before the
CERC seeking interim directions restraining the Respondents from taking
coercive action against them. They filed IA No. 23 of 2022 thereafter to
restrain the Respondents from encashing the Bank Guarantee, furnished by
them, till final adjudication of the Petition by the CERC.
2.
The 2nd Respondent–Solar Energy Corporation of India Limited (for
short “SECI”) invited proposals on 31.05.2017 for setting up Grid connected
wind power projects, on “build own operate” basis, for an aggregate capacity
of 1000 MW. The Appellant was issued a letter of award for setting up a 250
MW wind power project on 03.11.2017. A Power Purchase Agreement (for
short “PPA”) was entered into on 21.07.2017, and the Haryana Electricity
Regulatory Commission (for short “Commission”) on 24.11.2017 adopted the
tariff while disposing of the earlier Petition. The 2nd Respondent entered into
a Power Sale Agreement (for short “PSA”) with the 3rd Respondent–Haryana
Power Purchase Centre (for short “HPPC”) and the 4th Respondent – Uttar
Pradesh Power Corporation Limited (for short “UPPCL”) in respect of the
power generated from this project. On 03.12.2019, the Commission adopted
the tariff qua the Appellant, while disposing of the Petition filed by the 2nd
Respondent. In the Petition presently pending before the CERC, the
Appellant herein had sought a declaration that execution of the project,
Page 4 of 43
awarded to them, had become commercially and physically impossible on
account of force majeure events, and should therefore be terminated.
3.
After noting the rival contentions, the CERC, in the Order under appeal,
held that, as per the PPA dated 27.12.2027, the SCOD of the project was
03.05.2019; on the Appellant’s request, the SCOD was extended by SECI on
two occasions, the first up to 28.01.2021 and thereafter up to 28.06.2021; the
total extension of time granted for SCOD was 787 days; and SECI had
informed the Appellant on 13.08.2021 that, since the projec
Login now and unlock free premium legal research
Login to SupremeToday AI and access free legal analysis, AI highlights, and smart tools.
Login
now!
India’s Legal research and Law Firm App, Download now!
Copyright © 2023 Vikas Info Solution Pvt Ltd. All Rights Reserved.