2014 Supreme(Online)(APTEL) 251

Appellate Tribunal for Electricity (Appellate Jurisdiction)

APPEAL NO.222 of 2012 th Dated: 06 Jan.2014 Present:

HON’BLE MR. JUSTICE M KARPAGA VINAYAGAM, CHAIRPERSON HON’BLE MR. NAYAN MANI BORAH, TECHNICAL MEMBER In the Matter of:

Reliance Industries Limited, th

4 Floor, Maker Chambers IV, Nariman Point, Mumbai-400 021 ..... Appellant Versus

1. Petroleum & Natural Gas Regulatory Board

1st Floor, World Trade Centre Babar Road, New Delhi-110 001

2. Gujarat State Petronet Limited (GSPL), rd

3 Floor, G S P C Bhavan, Behind Udyog Bhavan, Sector-11, Gandhi Nagar, Gujarat-382 011 ….. Respondent(s)

Counsel for the Appellant : Dr. Abhishek Manu Singhvi,Sr Adv Mr. Parag Tripathi, Sr Adv Mr. Rajat Nair Mr. K R Sasi Prabhu Mr. Amit Bhandari Mr. Gaurav Mitra Mr. Samreen Mr. Kunal Bahri Counsel for the Respondent(s): Mr. Rakesh Dewan Mr. Vipul Sharda Mr. Saurav Aggarwal for R-1 Mr. C S Vaidyanathan,Sr Adv Mr. Aspi Kapadia Mr. Piyush Joshi Ms. Sumiti Yadava Ms. Nimisha Singh Dutta for R-2

J U D G M E NT

PER HON’BLE MR. JUSTICE M. KARPAGA VINAYAGAM CHAIRPERSON

1. The Reliance Industries Limited (Reliance) is the Appellant herein. Petroleum & Natural Gas Regulatory Board st (Petroleum Board) is the 1 Respondent. M/s. Gujarat State nd Petronet Limited (Gujarat Petronet) is the 2 Respondent.

2. Aggrieved over the Impugned Order dated 11.9.2012 passed by the Petroleum Board (R-1) fixing the provisional Natural Gas Pipeline Tariff at the rate of Rs.23.99/MMBTU applying retrospectively from 20.11.2008, instead of from the date of authorisation i.e. 27.7.2012, the Appellant has filed this Appeal.

3. The short facts are as follows:

(a) Reliance, the Appellant, is carrying on the business of petroleum refining, petrochemical production and marketing of refinery products/petro chemicals.

(b) M/s. Gujarat State Petronet Limited (Gujarat Petronet, R-2) is carrying on the business of laying, building, operating and expanding natural gas pipelines for transportation of natural gas.

(c) In terms of the Petroleum and Natural Gas Regulatory Board Act, 2006 (Petroleum Board Act), the Petroleum Board (R-1) is entrusted with the responsibility of authorising entities to lay, build, operate or expand natural gas pipelines and regulating and fixing the transportation rates for common carrier or contract carrier pipelines.

(d) The Petroleum Board notified the Authorising Regulations, 2008 (Authorising entities to lay, build, operate or expand natural gas pipelines) on 6.5.2008.

(e) The Petroleum Board also notified the Tariff Regulations for determining the Tariff for Natural Gas pipelines on 20.11.2008.

(f) Under the provisions of the Tariff Regulations, the Petroleum Board (R-1) is required to determine the Natural Gas Pipeline’s tariff on a provisional basis first and subsequently to finalise the same considering the actual cost and data at the end of the Financial Year, on the basis of audited annual accounts. Thus as per Tariff Regulations, the overall Tariff fixation comprises of the following three steps:

i) Existing tariff charged by the entity on authorization by the Board becomes “on account”

ii) On determination of provisional tariff by the Board the entity will carry out adjustment with retrospective effect relating back to the date from which tariffs were charged “on account” basis. Stakeholders/customers are entitled to submit comments/objections to this provisional tariff.

iii) The final step provided in Schedule A: Regulation

9 is that after considering the response of stakeholders, the provisional tariff shall become final.

(g) The Gujarat Petronet (R-2) applied to the Petroleum Board (R-1) for authorisation on 6.12.2008 under the Authorising Regulations for grant of authorisation for laying, building, operating or expanding its Grid under the Regulation 18 of the Authorising Regulations, 2008.

(h) The Reliance, the Appellant in May, 2009 made an arrangement by entering into a Gas Transportation Agreement with Gujarat Petronet (R-2) for transportation of Gas from Bhadbut for the price of Rs.12.45/MMBTU and Hazira/Dahej for the price of Rs.21.63/MMBTU to the Appellant’s refinery in Jamnagar, Gujarat.

(i) The Petroleum Board (R-1) after considering the Application dated 6.12.2008, filed by the Gujarat Petronet (R-2) seeking for authorisation, granted the said authorisation to the Gujarat Petronet for its High Pressure Gujarat Gas Grid by the order dated

27.7.2012.

(j) As indicated above, under the above Regulations, the Petroleum Board (R-1) is required to determine the initial unit natural gas pipelines tariff on provisional basis first before authorising the tariff after considering the actual cost and data at the end of the Financial Year on the basis of audited accounts.

(k) Accordingly, the Petroleum Board (R-1) passed the impugned order dated 11.9.2012. In this order, the Petroleum Board decided that the provisional initial unit natural gas pipelines tariff on a levelised basis for the Gujarat Petroleum High Pressure Gas Grid networ