2026 Supreme(Online)(Cal) 3439
CALCUTTA HIGH COURT
RAVINDRA KUMAR SINGH AND ORS – Appellant
Versus
THE KOLKATA MUNICIPAL MUNICIPAL CORPORATION AND ORS – Respondent
WPO 502 / 2024
##PAGE1##
OD-01
WPO/502/2024
IN THE HIGH COURT AT CALCUTTA
CONSTITUTIONAL WRIT JURISDICTION
ORIGINAL SIDE
Ravindra Kumar Singh & Ors.
Versus
The Kolkata Municipal Corporation & Ors.
Before:
The Hon’ble Justice RAJA BASU CHOWDHURY
Date: 14th May 2026
Appearance:
Mr. Deepan Kr. Sarkar, Advocate
Mr. Karanjeet Sharma, Advocate
Mr. Aditya Chakraborty, Advocate
Mr. Navneet Sewek, Advocates
Ms. Anshumala Bansal, Advocate
Mr. Shubhayan Chakraborty, Advocate
for the petitioner, Advocate
Mr. Srijan Nayak, Advocate
Ms. Sima Chakraborty, Advocate
for the KMC
Mr. Saptangsu Basu, Sr. Advocate
Mr. Syed Moyeenul. Arefin, Advocate
for the respondent no.5
Mr. Krishnaraj Thaker, Sr. Advocate
Mr. Soumyades Sinha, Advocate
Ms. Suranjana Chatterjee, Advocate
for the respondent no.6
1. The necessary authorisation issued by the respective parties that is
the petitioners and the respondent nos.5 and 6, to their learned
advocates as placed before this Court are taken on record.
2. Although the instant writ petition was filed, inter alia, praying for a
direction upon the respondent authorities to ensure that the
remedial measures are put in and/or implemented and to undo the
##PAGE2##2
damage caused to the building of the petitioners’ premises situated
at 47B, Bondel Road, Police Station- Karaya, Kolkata – 700 019,
however the parties are now agreeable to resolve the disputes
amongst themselves.
3. In order to record the oral settlement between the parties it is
necessary to note down certain facts.
(i) The respondent no.5 is the owner of the premises no.52D,
Bondel Road, Kolkata – 700 019 which is adjacent and
contiguous to premises no.47B, Bondel Road, Kolkata.
Certain development work was undertaken in the year 2023
by the respondent no.6 at the aforesaid adjoining premises at
52D, Bondel Road, Kolkata, which had resulted in certain
damage being caused to the existing building at premises
no.47B, Bondel Road, Kolkata.
(ii) When the matter was moved, by an order dated 24th May
2024 a coordinate Bench of this Court, noting the
submissions made by the learned senior counsel
representing the respondent nos.5 and 6 that they were
interested to accept the prayers made by the petitioners, had
directed the respondent no.5 and 6 to make necessary repair
work under the supervision of an empanelled Structural
Engineer to be engaged by the Executive Engineer, Borough –
VII under whose supervision the repairing work will be done.
Accordingly the parties were to approach the Executive
Engineer within a week, for appointment of a competent
##PAGE3##3
empanelled Structural Engineer for supervising the repair
work.
(iii) Pursuant to the above, a structural engineer was appointed
who had surveyed the premises. Though he had prepared a
report, such report was not filed before this Court, since the
parties were trying to amicably resolve the disputes and
differences amongst themselves as regards the modalities to
carry out repair work. The factum of the parties trying to
resolve the disputes would corroborate from the recordings
made in several orders passed from time to time.
(iv) Subsequently, on 17th March 2026 after series of attempts
made by the parties to enter into a settlement, the settlement
fizzled out, this Court had accordingly directed the
municipality to carry out an inspection of the property in
presence of the parties and to file a report. Pursuant to the
aforesaid, the municipal authority has filed a report duly
countersigned amongst others by the Executive Engineer
(C)/Building/Borough-VII dated 1st April 2026. Although the
above report was taken on record, as the report noted that
considering the gravity and merits of the situation, some
more time is required to complete the entire process, this
Court had accordingly granted time till 6th May 2026.
4. Today the municipality has filed a fresh report dated 6th May 2026.
The petitioners and the respondent nos. 5 and 6 have now come
forward and would submit that they are interested to have the
repair work done in terms of the report dated 6th May 2026 filed by
##PAGE4##4
the Executive E