Appointment to Higher Post on Compassionate Grounds Not a Matter of Right: J&K&L High Court
07 Mar 2026
Nearly Decade-Long Delay in Patnitop Illegal Construction PIL Appalls J&K&L High Court; Directs PDA CEO to Join Proceedings
07 Mar 2026
Punjab & Haryana HC Denies Anticipatory Bail in Murder via Humiliation Case: Sections 103(1) & 3(5) BNS
07 Mar 2026
Employees Under CCS Pension Rules Excluded from PG Act Section 2(e) Gratuity: Delhi HC Upholds Forfeiture on Resignation
07 Mar 2026
Security Deposit Forfeiture Without Show-Cause Notice Violates Natural Justice: Himachal Pradesh High Court
07 Mar 2026
S.202 CrPC Inquiry Not Mandatory for Public Servant Complaints If Accused Outside Jurisdiction: Supreme Court
09 Mar 2026
Professor MP Singh: Shaper of Constitutional Discourse
09 Mar 2026
Supreme Court Orders No-Fault Vaccine Compensation Policy
11 Mar 2026
Maintenance to Wife Should Not Encourage Idleness or Be Excessive: Gujarat HC Reduces Family Court Enhancement under CrPC Ss.125,127
11 Mar 2026
CENTRAL ELECTRICITY REGULATORY COMMISSION
Petition under Sections 79(1)(c) and (f) of the Electricity Act 2003 read with Regulation 42 of the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations 2022 seeking directions to Central Transmission Utility of India Limited to forthwith process the application made by the Petitioners for installation of additional generation capacity and Energy Storage System under Regulation 5.2 of the GNA Regulations. 1. ACME Solar Holdings Limited 2. ACME Surya Power Private Limited
CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI Petition No. 89/MP/2026 Coram:
Shri Jishnu Barua, Chairperson Shri Ramesh Babu V., Member Shri Harish Dudani, Member Shri Ravinder Singh Dhillon, Member Date of Order: 2nd March, 2026 In the matter of Petition under Sections 79(1)(c) and (f) of the Electricity Act, 2003 read with Regulation 42 of the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022 seeking directions to Central Transmission Utility of India Limited to forthwith process the application made by the Petitioners for installation of additional generation capacity and Energy Storage System under Regulation 5.2 of the GNA Regulations.
And in the matter of
1. ACME Solar Holdings Limited, Plot No. 152, Sector 44, Gurgaon, Haryana – 122002
2. ACME Surya Power Private Limited,