CENTRAL ELECTRICITY REGULATORY COMMISSION
Petition under Section 79(1)(c) and (f) of the Electricity Act read with Regulation 41 and 42 of the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations 2022 seeking appropriate directions to CTUIL for allowing the conversion of the Connectivity granted under the Land-BG route to LOA/PPA route. 1. Ganeko One Energy Pvt. Ltd. 2. Ganeko Two Energy Pvt. Ltd.
CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI Petition No.728/MP/2025 along with IA 67/2025 and IA 133/2025 Coram:
Shri Ramesh Babu V., Member Shri Harish Dudani, Member Shri Ravinder Singh Dhillon, Member Date of Order: 04.05.2026 In the Matter Of:
Petition under Section 79(1)(c) and (f) of the Electricity Act read with Regulation 41 and 42 of the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022 seeking appropriate directions to CTUIL for allowing the conversion of the Connectivity granted under the Land-BG route to LOA/PPA route.
AND In the Matter Of:
1. Ganeko One Energy Pvt. Ltd. (Ganeko-1)
3rd Floor, Tower 10 B, DLF Cyber City, Gurugram, Haryana – 122002 …Petitioner No. 1
2. Ganeko Two Energy Pvt. Ltd. (Ganeko-2)
3rd Floor, Tower 10 B, DLF Cyber City, Gurugram, Haryana – 122002 …Petitioner No. 2 Versus
1. Central Transmission Utility of India Ltd. (CTUIL)
Floors No. 5th-10th IRCON International Tower, Tower 1, Plot No. 16, Institutional Area, Sector 32, Gurugram, Haryana 122003 …Respondent No. 1 2. SJVN Ltd. (SJVN)
6th Floor, Tower-1, NBCC Office Complex, East Kidwai Nagar, New Delhi – 1100
Login now and unlock free premium legal research
Login to SupremeToday AI and access free legal analysis, AI highlights, and smart tools.
Login
now!
India’s Legal research and Law Firm App, Download now!
Copyright © 2023 Vikas Info Solution Pvt Ltd. All Rights Reserved.