CENTRAL ELECTRICITY REGULATORY COMMISSION
Approval under Section 62 read with Section 79 (1) (d) of the Electricity Act 2003 and under Regulation 15 (1) (a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations 2023 read with the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2024 for truing up of the transmission tariff for the 2019-24 tariff period and the determination of transmission tariff for the 2024-29 tariff period for LILO of both the circuits of Mundra UMPP– Limbdi 400 kV D/C line (triple snowbird) at the Bachau Sub-station along with extension of 400 kV Bachau Sub-station under “Transmission System Strengthening associated with Mundra UMPP (Part-A)” in the Western Region. Power Grid Corporation of India Limited
929/TT/2025
Login now and unlock free premium legal research
Login to SupremeToday AI and access free legal analysis, AI highlights, and smart tools.
Login
now!
India’s Legal research and Law Firm App, Download now!
Copyright © 2023 Vikas Info Solution Pvt Ltd. All Rights Reserved.