2026 Supreme(Online)(CIC) 9558
CENTRAL INFORMATION COMMISSION
Vinod Kumar Tiwari, Information Commissioner
R L Makhija – Appellant
Versus
PIO, Municipal Corporation of Delhi – Respondent
File No: CIC/MCDND/A/2024/132612
Important Points
Subject
Administrative Law - Right to Information
Act Referred
Headnote
For the Appellants/Petitioners: Present in person
For the Respondents: A K Mandal
| Table of Content |
|---|
| 1. procedural history of rti application, first appeal, and second appeal filing. (Para 1 , 2 , 3 , 4) |
| 2. parties' submissions regarding the partial receipt of information and assurance of further disclosure. (Para 5 , 6 , 7) |
| 3. direction to provide pending information free of cost based on respondent's assurance. (Para 8 , 9 , 10 , 11) |
INFORMATION COMMISSIONER : Vinod Kumar Tiwari
Relevant facts emerging from appeal:
RTI application filed on : 18.04.2024
PIO replied on : 06.05.2024
First appeal filed on : 04.06.2024
First Appellate Authority’s order : 16.07.2024
2nd Appeal/Complaint dated : 03.10.2024
Information sought:
1. The Appellant filed an RTI application dated 18.04.2024 (offline) seeking
the following information:
CIC/MCDND/A/2024/132612 Page 1 of 4
1 / 5
“Information required in respect of Shri PARDEEP KUMAR Junior
Engineer (C) Contract supervise / executed work details.
1. Please provide the details how many work executed / supervise by Shri
Pardeep Kumar Junior Engineer. (Period 01.04.2023 to till now.)
a) Copy of work order along with Schedule
b) Copy of Measurement Book
c) Map
d) Copy of justification
e) Copy of third party observation
f) If bill was passed please provide the copy of bill farm.
g) If bill was not passed final bill work order was issued 2018-19 to till
now
2. Please provide the details of non-executed the awarded work.
(01.04.2023 to till now)
3. Please mention in reply reference no. RLM / 2024-25 / 06 while replying
to this RTI.”
2. The CPIO furnished a reply to the Appellant on 06.05.2024 stating as
under:
“In this reference the application is required through this letter that the
requisite Information is not collectively available due to the desired
information is in voluminous nature. Hence the record can be inspected
on 20-05-2024, between 2-00. p.m to 3-00. p.m in the office of Executive
Engineer (M-IV) SNZ, Keshav Chowk, G.T. Road. Shahadra, Delhi 110053.
The photocopy of the same be taken @ 2/-per page after the payment
deposited with Municipal treasury.”
3. Being dissatisfied, the Appellant filed a First Appeal dated 04.06.2024.
The FAA did not pass any order.
4. Feeling aggrieved and dissatisfied, Appellant approached the
Commission with the instant Second Appeal.
Relevant Facts emerged during Hearing:
CIC/MCDND/A/2024/132612 Page 2 of 4
2 / 5
The following were present:-
Appellant: Present in person.
Respondent: Shri A K Mandal, APIO/Assistant Engineer appeared in person.
5. Proof of having served a copy of Second Appeal/Complaint on
Respondent while filing the same in CIC on 03.10.2024 is available on record.
6. The Appellant inter alia submitted that he has received the information
sought on point No. 1 of the RTI Application. However, on point No. 2, still
desired information was not provided by the Respondent Public Authority.
7. The Respondent while defending their case inter alia submitted that the
Appellant had inspected the records and after inspection, desired information
was provided upon receipt of Rs. 178/- from him. As regards, point No. 2 of the
RTI Application, the Respondent gave assurance to provide the information to
the Appellant.
Decision:
8. The Commission after adverting to the facts and circumstances of the
case, hearing both the parties and perusal of the records, notes that the
Respondent had initially offered inspection of the relevant records on account
of the voluminous nature of the information sought. During the hearing, the
Respondent submitted that the Appellant had availed inspection of the records
and, thereafter, copies of the desired documents pertaining to point No. 1 of
the RTI application were provided upon payment of the prescribed fee.
9. The Commission further notes the submission of the Appellant that
information sought at point No. 2 of the RTI application has not yet been
furnished. In this regard, the Respondent, during the hearing, assured the
Commission that the requisite information available on record concerning
point No. 2 would be provided to the Appellant.
10. In view of the above and taki