2024 Supreme(Online)(DEL) 7641

* IN THE HIGH COURT OF DELHI AT NEW DELHI Date of decision: 14th AUGUST, 2024 IN THE MATTER OF:

+ W.P.(C) 15285/2023 & CM APPL. 61267/2023 IMC LIMITED ..... Petitioner Through: Mr. Ramji Srinivasan, Sr. Advocate with Mr. Saurav Agarwal, Mr. Trinath Tadakamalla, Ms. Utsha Dasgupta, Ms. Nisha Bhatia, Mr. Samyak Bilala, Mr. Anshuman Choudhary and Ms. Namrata, Advocates.

versus UNION OF INDIA AND ORS. ..... Respondents Through: Mr. Apoorv Kurup, CGSC with Mr.

Gurjas Singh Narula, Ms. Nidhi Mittal, Mr. Akhil Hasija, Ms. Aanchal and Ms. Gauri Goburdhan, Advocates and Mr. Rudra Paliwal, GP.

Ms. Madhavi Divan, Sr. Advocate with Mr. Rahul Sagar Sahay, Mr. Prince Singh, Ms. Sonali Malhotra, Ms. Sanskriti Bhardwaj, Ms. Harshita Tomar and Ms. Sakshi Singh, Advocates for R-2.

Mr. Abhinav Vasisht, Sr. Advocate with Mr. Prashant Bezboruah and Ms. Akshita Sachdeva Jaitly, Advocates for R-3.

+ W.P.(C) 2896/2024 & CM APPLs. 11960/2024, 11961/2024 INDIAN OIL CORPORATION LIMITED ..... Petitioner Through: Mr. Abhinav Vasisht, Sr. Advocate with Mr. Prashant Bezboruah and Ms.

Akshita Sachdeva Jaitly, Advocates.

versus PETROLEUM AND NATURAL GAS REGULATORY BOARD ..... Respondent Through: Ms. Madhavi Divan, Sr. Advocate with Mr. Rahul Sagar Sahay, Mr. Prince Singh, Ms. Sonali Malhotra, Ms. Sanskriti Bhardwaj, Ms. Harshita Tomar and Ms. Sakshi Singh, Advocates for R-1.

Mr. Ramji Srinivasan, Sr. Advocate with Mr. Saurav Agarwal, Mr. Trinath Tadakamalla, Ms. Utsha Dasgupta, Ms. Nisha Bhatia, Mr. Samyak Bilala, Mr. Anshuman Choudhary and Ms. Namrata, Advocates.

Mr. Apoorv Kurup, CGSC with Mr. Gurjas Singh Narula, Ms. Nidhi Mittal, Mr. Akhil Hasija, Ms. Aanchal and Ms. Gauri Goburdhan, Advocates and Mr. Rudra Paliwal, GP.

CORAM:

HON'BLE MR. JUSTICE SUBRAMONIUM PRASAD

JUDGMENT

1. The present writ petitions raise an important question of law of public importance as to whether after the enactment of the Petroleum and Natural Gas Regulatory Board Act, 2006 (hereinafter referred to as the 'PNGRB Act'), can entities lay a captive pipeline for transport of its petroleum and petroleum products without the authorization of the Petroleum and Natural Gas Regulatory Board (hereinafter referred to as the 'PNGRB').

2. This judgment disposes of two writ petitions, one filed by IMC Limited (hereinafter referred to as the 'Petitioner') and the other filed by Indian Oil Corporation Limited (hereinafter referred to as the 'IOCL').

3. Since the issues raised in both the writ petitions are common, with the consent of the parties, the writ petitions are being disposed of vide a common judgment.

4. The facts of the case as stated by the Petitioner in its writ petition, i.e., W.P.(C) 15285/2023, are that the PNGRB issued an application-cum-bid document for grant of authorization for laying, building, operating or expanding a pipeline 14 kms. from outside the boundary of Ennore Port to Manali Industrial Area. The bid document was amended and the length of the pipeline which was originally fixed at 14 kms. from outside the boundary of Ennore Port was extended to a point within the Ennore Port and was extended from 14kms. to 21 kms. The Petitioner submitted its Expression of Interest to the PNGRB.

5. Material on record indicates that both the Petitioner and the IOCL sought for authorization from the Board to lay down the said pipeline. The Petitioner was successful and was given the Letter of Authorization on

18.12.2015 to lay down the said pipeline.

6. It is the case of the Petitioner that in October, 2023, i.e., after about 8 years after the Letter of Authorization was given to the Petitioner, the IOCL started laying down two multi product petroleum and petroleum products pipelines of 30" diameters and 10.5 kms. length from KPL Jetty to Vellur Terminal which is operated by IOCL. The IOCL is also laying down three pipelines of 24" diameter and 9kms. length from Vellur Terminal to Manali Industrial Area. All the pipelines are being laid without getting any authorization from the PNGRB.

7. Material on record indicates that PNGRB vide a communication dated

13.12.2023 has directed the IOCL to stop laying these pipelines with immediate effect since the IOCL has not taken authorization from the PNGRB for laying down the said pipeline.

8. IMC Limited has approached this Court by filing W.P.(C)

15285/2023 with the following prayers:

“a) transfer to itself the Petition dated 07.11.2023 filed by the Petitioner under Section 24 and 25 of PNGRB Act, 2006 before the PNGRB Board/Respondent No. 2 and grant the following reliefs prayed therein:

(i) Direct IOCL to immediately stop the construction of the Unauthorized Pipelines in respect of transportation of petroleum and petroleum product for the route between Ennore Port and Manali Industrial Area, Tamil Nadu which was already covered by EPMPL authorized to the Petitioner by the Hon'ble Board.

(ii) Prohibit IOCL from undertaking construction of the Unauthorized Pipelines in respect of transportation of petroleum and petroleum product for the route between Ennore Port and Manali Industrial Area, Tamil Nadu which was already covered by EPMPL authorized to the Petitioner by the Hon'ble Board.

(iii) Impose a penalty and take any other action as the this Hon'ble Court deems fit against IOCL for violating Section 16 of the PNGRB Act, by constructing the pipeline without authorization of the PNGRB Board.

(iv) Direct IOCL to compensate the Petitioner under Section 21(3) of the PNGRB Act for damages caused to the Petitioner by continuous infringement of the Petitioner's rights by IOCL's construction of Unauthorized Pipelines leading to financial and business losses to the Petitioner.

OR, in the alternative b) grant the following protective reliefs to the Petitioner till the PNGRB is duly constituted by

1
2
3
4
5
6
7
8
9
10
11