* IN THE HIGH COURT OF DELHI AT NEW DELHI Date of decision: 03rd JULY, 2023 IN THE MATTER OF:

+ W.P.(C) 3922/2023 & CM APPL. 15281/2023 SUNGRACE ENERGY SOLUTIONS PRIVATE LTD ..... Petitioner Through: Mr. Rohit Anil Rathi, Ms. Ranu Purohit, Ms. Aditi Dani, Advocates versus UNION OF INDIA & ANR ...... Respondents Through: Mr. Arnav Kumar, Mr. Gurdas Khurana, Advocates for UOI Mr. Bharat Sangal, Senior Advocate with Ms. Babita Kushwaha, Advocate for R-2 + W.P.(C) 3932/2023 & CM APPL. 15346/2023 GEIE SOLAR PRODUCTS INDIA PVT LTD ..... Petitioner Through: Mr. Rohit Anil Rathi, Ms. Ranu Purohit, Ms. Aditi Dani, Advocates versus UNION OF INDIA & ANR ...... Respondents Through: Mr. Subhash Tanwar, CGSC with Mr.Hardik Bedi, GP, Mr. Ashish Choudhary, Advocate for UOI Mr. Bharat Sangal, Senior Advocate with Ms. Babita Kushwaha, Advocate for R-2 + W.P.(C) 3936/2023 & CM APPL. 15350/2023 GRAND BUSINESS VENTURES (SUGUNA) ..... Petitioner Through: Mr. Rohit Anil Rathi, Ms. Ranu Purohit, Ms. Aditi Dani, Advocates versus UNION OF INDIA AND ANR ..... Respondents Through: Mr. Sandeep Kr. Mahapatra, CGSC with Ms. Deepa Malik, GP, Ms.Mrinmayee Sahu, Advocate for UOI Mr. Bharat Sangal, Senior Advocate with Ms. Babita Kushwaha, Advocate for R-2 + W.P.(C) 3937/2023 & CM APPL. 15351/2023 HIMALAYAN SOLAR PVT LTD ..... Petitioner Through: Mr. Rohit Anil Rathi, Ms. Ranu Purohit, Ms. Aditi Dani, Advocates versus UNION OF INDIA & ANR ...... Respondents Through: Mr. Arnav Kumar, Senior Panel Counsel with Mr. Bhaskar Pandey, GP, Mr. Rishesh Mani Tripathi, Advocate for UOI Mr. Bharat Sangal, Senior Advocate with Ms. Babita Kushwaha, Advocate for R-2 + W.P.(C) 3938/2023 & CM APPL. 15352/2023 AUSTRALIAN PREMIUM SOLAR ..... Petitioner Through: Mr. Rohit Anil Rathi, Ms. Ranu Purohit, Ms. Aditi Dani, Advocates versus UNION OF INDIA & ANR ...... Respondents Through: Mr. Vikram Jetly, CGSC with Ms.Shreya Jetly, Advocate for R-1 Mr. Bharat Sangal, Senior Advocate with Ms. Babita Kushwaha, Advocate for R-2 + W.P.(C) 3955/2023 & CM APPL. 15423/2023 ANJITA ENGINEERS .... Petitioner Through: Mr. Rohit Anil Rathi, Ms. Ranu Purohit, Ms. Aditi Dani, Advocates versus UNION OF INDIA ..... Respondent Through: Mr. Apoorv Kurup, CGSC with Mr.Ojaswa Pathak, Ms. Apoorva Jha, Ms.Swati Bhardwaj, Advocates for UOI Mr. Bharat Sangal, Senior Advocate with Ms. Babita Kushwaha, Advocate for R-2 CORAM:

HON'BLE THE CHIEF JUSTICE HON'BLE MR. JUSTICE SUBRAMONIUM PRASAD

JUDGMENT

1. The present Writ Petitions have been filed by the Petitioners, impugning various notifications in the nature of Office Memoranda, Corrigenda and Amendments (collectively, “impugned notifications”) that have been issued by Respondent No.1, the Union of India through the Ministry of New & Renewable Energy and Respondent No. 2, Solar Energy Corporation of India Limited (hereafter, “SECI”) from time to time, in respect of a tender dated 31.12.2022 floated inter alia for the purpose of Design, Manufacture, Supply, Transport, Installation, Testing and Commissioning of Off-Grid Solar Photovoltaic Water Pumping Systems (SPWPS) of 1-10 HP capacities (hereafter, “Tender dated 31.12.2022”).

2. The Petitioners herein are prospective bidders aggrieved by the impugned notifications. SECI is the designated nodal agency for floating and executing procurement contracts under the aegis and administrative control of Respondent No. 1, i.e., Union of India through the Ministry of New and Renewable Energy.

3. The thrust of the Petitioners‟ challenge before us is that by virtue of the Impugned Notifications dated 02.02.2023, 17.02.2023, 16.03.2023 and 21.03.2023, terms and conditions of the Tender dated 31.12.2022 stand modified in a manner so as to oust micro, small and medium enterprises (hereafter, “MSMEs”) from the bidding process without taking into account their representations and grievances, thereby rendering the impugned corrigenda liable to set aside as being arbitrary and coloured in malafide.

4. A brief description of the Tender dated 31.12.2022 and the impugned corrigenda issued thereafter, leading up the filing of the present petitions, is set out hereinbelow: -

a. On 31.12.2022, SECI issued a Request for Selection (RfS) for Vendors for Design, Manufacture, Supply, Transport, Installation, Testing and Commissioning of Off-Grid Solar Photovoltaic Water Pumping Systems (SPWPS) of 1-10 HP capacities in selected States on Pan India basis, including complete system warranty and its repair and maintenance for 5 years under component-B of PM-KUSUM Scheme of the MNRE, i.e., the Tender dated 31.12.2022.

b. On 02.02.2023, Respondent No. 1 issued an Office Memorandum (hereafter, “OM dated 02.02.2023”) inter alia issuing new Technical Specifications for Solar Photo Voltaic Array in respect of the Tender dated 31.12.2022, wherein clause

3.3.4 read as follows: -

“3.3.4 The minimum module efficiency should be minimum

19 percent and fill factor shall be more than 75 percent.”

c. On 17.02.2023, SECI issued an amendment to the Tender dated

31.12.2022 (hereafter, “Amendment dated 17.02.2023”), whereby it inter alia modified Clause 3.4 (Operation and Maintenance, Training, Awareness and Sensitization) under clause (c), to extend the period of blacklisting a vendor from 3 years to 5 years in the event the installed system is not as per the standards. It further amended clause (d) to state that if any selected vendor, after getting empanelled doesn‟t proceed with the installation of pumps, apart from encashment of EMD, the said vendor shall also be blacklisted for 5 years period from the date of issuance of such notice of blacklisting.

d. On 18.02.2023, representations were addressed to SECI wherein it was inter alia stated that that the increase in module efficiency from 16% to 19% and fill factor to 75% was without any prior intimation or consultation.

e. On 27.02.2023, SECI issued Corrigendum (hereafter, “Corrigendum dated 27.03.2023”), increasing the time for submission of bids in respect of the Tender dated 31.12.2022 to

10.03.2023.

f. On 09.03.2023, SECI issued another Corrigendum (hereafter, “Corrigendum dated 09.03.2023”) increasing the time for submission of bids to 23.03.2023.

g. On 16.03.2023, SECI issued another amendment (hereafter, “Amendment dated 16.03.2023”) inter alia deleting Clause No. 11 which exempted bidders who qualified as MSME from submission of Bid Processing Fee.

h. On 21.03.2023, SECI issued „Clarification-03‟ wherein Clause

18(xvi)

Click Here to Read the rest of this document
1
2
3
4
5
6
7
8
9
10
11
SupremeToday Portrait Ad
supreme today icon
logo-black

An indispensable Tool for Legal Professionals, Endorsed by Various High Court and Judicial Officers

Please visit our Training & Support
Center or Contact Us for assistance

qr

Scan Me!

India’s Legal research and Law Firm App, Download now!

For Daily Legal Updates, Join us on :

whatsapp-icon Back to top