2026 Supreme(Online)(Del) 1449

IN THE HIGH COURT OF DELHI AT NEW DELHI
SWADESHI CIVIL INFRASTRUCTURE PVT LTD – Appellant
Versus
RITES LIMITED & ANR. – Respondent
ARB.P.-1301/2025



$~71 * IN THE HIGH COURT OF DELHI AT NEW DELHI Date of decision: 16.01.2026 + ARB.P. 1301/2025 SWADESHI CIVIL INFRASTRUCTURE PVT LTD .....Petitioner Through: Mr. Dinkar Singh and Mr Rohit Singh, Advocates.

versus RITES LIMITED & ANR. .....Respondents Through: Mr. G. S. Chaturvedi, Advocate for Respondent No-1.

CORAM:

HON'BLE MR. JUSTICE HARISH VAIDYANATHAN SHANKAR % JUDGEMENT (ORAL)

HARISH VAIDYANATHAN SHANKAR, J.

1. The present petition has been filed under Section 11(6) of the Arbitration and Conciliation Act, 1996, 1Act, for the appointment of an Arbitrator to adjudicate upon a commercial dispute between the parties.

2. Learned counsel appearing for the Petitioner contends that the Arbitration clause is set out at Clause 25 of the Agreement dated

22.08.2017, and which clause reads as under:

Signature Not Verified “CLAUSE 25 Settlement of Disputes & Arbitration Except where otherwise provided in the Contract all questions and disputes relating to the meaning of the specifications, design, drawings and instructions herein before mentioned and as to the quality of workmanship or materials used on the work or as to any other question, claim, right, matter or thing whatsoever in any way arising out of or relating to the Contract, designs, drawings, specifications, estimates, instructions, orders or these conditions or otherwise concerning the works or the execution or failure to execute the same whether arising during the progress of the work or after the cancellation, termination, completion or abandonment thereof shall be dealt with as mentioned hereinafter:

1) If the Contractor considers any work demanded of him to be outside the requirements of the Contract, or disputes any drawings, record or decision given in writing by the Engineer on any matter in connection with or arising out of the Contract or carrying out of the work, to be unacceptable, he shall promptly within 15 days request the Engineer-in-Charge in writing for written instruction or decision. Thereupon, the Engineer-in-Charge shall give his written instructions or decision within a period of one month from the receipt of the Contractor's letter.

If the Engineer-in-Charge fails to give his instructions or decision in writing within the aforesaid period or if the Contractor is dissatisfied with the instructions or decision of the Engineer-in- Charge, the Contractor may, within 15 days of the receipt of the Engineer-in-Charge decision, appeal to the Appellate Authority specified in Schedule 'F' who shall afford an opportunity to the Contractor to be heard, if the latter so desires, and to offer evidence in support of his appeal. The Appellate Authority shall give his decision within 30 days of receipt of Contractor's appeal. If the Contractor is dissatisfied with this decision, the Contractor shall within a period of 30 days from receipt of the decision, give notice to the Appointing Authority specified in Schedule 'F' for appointment of arbitratorfailing which the said decision shall be final binding and conclusive and not referable to adjudication by the arbitrator.

2) Except where the decision has become final, binding and conclusive in terms of Sub Para (1) above, disputes or difference shall be referred for adjudication through arbitration by a sole arbitrator appointed by the Appointing Authority. The selection of Arbitrator by the Appointing Authority will be governed by the fact whether the dispute is (i) between two Public Sector Enterprises or (ii) between a Public Sector Enterprise and a Government Department or (iii) Otherwise.

Signature Not Verified In case the dispute does not fall under item (i) or (ii) of this Para the Appointing Authority, shall appoint the sole Arbitrator. Within 30 days of receipt of notice from the Contractor to refer the dispute for Arbitration, the Appointing Authority stipulated in Schedule F shall send to the Contractor a list of three serving officers of RITES of appropriate status depending on the total value of claim, who have not be

Click Here to Read the rest of this document
1
2
3
4
5
6
7
8
9
10
11
SupremeToday Portrait Ad
supreme today icon
logo-black

An indispensable Tool for Legal Professionals, Endorsed by Various High Court and Judicial Officers

Please visit our Training & Support
Center or Contact Us for assistance

qr

Scan Me!

India’s Legal research and Law Firm App, Download now!

For Daily Legal Updates, Join us on :

whatsapp-icon Back to top