2025 Supreme(Online)(HP) 3452
IN THE HIGH COURT OF HIMACHAL PRADESH, SHIMLA
Ajay Mohan Goel, J
Krishan Kumar – Appellant
Versus
State of Himachal Pradesh – Respondent
CWP No. 477 of 2025
For the Appellants/Petitioners: M/s R.L. Chaudhary and H.R. Sidhu
For the Respondents: Mr. Rahul Thakur, Mr. Sandeep Dutta, Mr. Suneet Goel, Mr. Sushmit Bhatt, Mr. Shriyek Sharda
Judicial oversight mandates state authorities to enforce environmental regulations in the context of public interest.
Headnote:The judgment examines the implementation of notifications dated 29.06.2021 and 18.08.2022 regarding pollution control measures applicable to stone crusher units in Himachal Pradesh, determining the responsibilities of state authorities to enforce these regulations per previous judicial directions. The court analyzed the failure to adhere to these notifications and the ramifications of such negligence on the environment. Issues include the viability of the writ petition in public interest, with the court permitting withdrawal for the petitioner to refile appropriately. The petition is allowed to be withdrawn.
| Table of Content |
|---|
| 1. court examines obligations for pollution control enforcement. (Para 1) |
| 2. maintains objection on writ petition's maintainability. (Para 2) |
| 3. petitioner allowed to withdraw with liberty to refile. (Para 3) |
Ajay Mohan Goel, Judge (Oral By way of this writ petition, the petitioner has, inter
alia, prayed for the following reliefs:-
“(i). That writ of mandamus may kindly be issued, directing the Respondent No. 1 to 9 & 15 to implement notification dated 29.06.2021 (Annexure P-3) and notification dated 18.08.2022 (Annexure P-4) and take action against Respondent No. 10 to 14 in terms of these notifications, which have been issued by the State Government as per the judgment and direction passed by this Hon'ble Court as well as by the Hon'ble National Green Tribunal, but there is a report dated 12.03.2024 (Annexure P-11), which discloses that due to shortage of staff, security and infrastructure in the Mining Department, these notifications have not been implemented till date.
(ii). That writ of mandamus may kindly be issued, directing the respondent authorities i.e. Respondent No. 1 to 9 & 15 to inspect the Crusher Units i.e. Respondent No. 10 to 14 qua the violation reported by the petitioner time and again as mentioned in the body of the Civil Writ Petition as well as to inspect how these Crusher Units have installed heavy machineries in their Crusher Units, which is beyond their permission and how instead of one Unit machinery, they have installed 8 to 10 heavy machineries in the name of one Crusher Unit and extracting a huge mined material beyond the permission granted by the respondent authorities.
(iii). That writ of mandamus may kindly be issued, directing the Respondent No. 1 to 9 & 15 to take every action against the Respondent No. 10 to 14 for enforcement of notification dated 29.06.2021 (Annexure P-3), in which, the criteria i.e. site suitability, norms, criteria, manner of Joint Inspection Committee for site appraisal, emission norms and pollution control measures and standard thereof, further advancement in pollution control devices for the proposed and existing units, parameters in the context of changing weather conditions in the face of Climate Change-Mitigation of impacts thereof, impact of Stone Crusher Units location on the hydrological, soil and water conservation, environment aspects such as air, water, flora and fauna, washing units-waste water treatment, procedure for establishment and operation to be followed by the State Board & Latest technologies advancement and availability of modern machinery and equipments for setting up of stone crusher units, have been prescribed and same has not been followed till date by the Respondent No. 10 to 14.
(iv). That writ of mandamus may kindly be issued, directing the Respondent No. 1 to 9 & 15 to get installed CCTV cameras in every Crusher Unit of Respondent No. 10 to 14 in order to monitor the violation of notification dated 29.06.2021 (Annexure P-3) and notification dated 18.08.2022 (Annexure P-4).
(v). That writ of mandamus may kindly be issued, directing the Respondent No. 1 to 9 & 15 to establish check-posts and measurement bridge regarding Crusher Units i.e. Respondent No. 10 to 14, so that the Crusher Units may not extract and 2025 supply mined minerals beyond the capacity qua which the permission has been granted by the Industries Department and similar check posts and measurement bridge may also be ordered to be established on the border of Punjab State, so that illegal mined material may not be transported from Himachal Pradesh to the State of Punjab, because the said illegal transportation causes loss of huge public exchequer to the State of Himachal Pradesh.
(vi). That writ of mandamus may kindly be issued, directing the respondent authorities to deploy appropriate staff, security and infrastructure in the Department of Pollution Control Board and in the Department of Indus