2025 Supreme(Online)(HP) 9652
IN THE HIGH COURT OF HIMACHAL PRADESH, SHIMLA
HON'BLE THE CHIEF JUSTICE GURMEET SINGH SANDHAWALIAHON'BLE MR. JUSTICE BIPIN CHANDER NEGI
ATUL SHARMA – Appellant
Versus
STATE OF HP AND OTHERS – Respondent
CWP/11002/2023
##PAGE1##
( 2025:HHC:46433 ).
IN THE HIGH COURT OF HIMACHAL PRADESH, SHIMLA
CWP No.11002 of 2023
Decided on: 29.12.2025
Atul Sharma ....Petitioner
Versus
State of Himachal Pradesh & Others ....Respondents
Coram
The Hon’ble Mr. Justice G.S. Sandhawalia, Chief Justice
The Hon’ble Mr. Justice Bipin C. Negi, Judge
Whether approved for reporting?
For the Petitioner : Mr. Sanjeev Bhushan, Senior
C Advocate with Mr. Sparsh
Bhushan, Advocate.
For the Respondents : Mr. Pranay Pratap Singh,
Additional Advocate General, for
respondents No.1 to 4-State.
: Mr. Dhiraj Thakur, Advocate, for
i respondent No.5.
: Mr. Umesh Kanwar and Ms. Isha
Thakur, Advocates, for
respondent No.6.
G.S. Sandhawalia, Chief Justice (Oral) .
Challenge in the present writ petition is sought for
quashing and setting aside the corrigendum dated 15.11.2023
(Annexure P-2), wherein the condition as such was fixed for the
::: Downloaded on - 04/01/2026 05:27:39 :::CIS
##PAGE2##2
Hot Mix Plant of the bidder to be at a distance of 30.00 km from
the work in place where the metlling of the road was to be done.
2. The tender in question was for the work
improvement/strengthening of Banethi Bagthan Rajgarh Chandol
road km 7/0 to 28/0 & 48/0 to 87/0 (SH:- Providing and laying
WBM-III, Bituminous Macadam, Bituminous concrete,
interlocking paver blocks, PCC V-shape drain, parapets, road
marking and road sign broards) under NABARD-XXVIII Scheme.
The tender had been awarded on 10.11.2023 and it was opened
on 23.11.2023.
3. Counsel for the petitioner has vehemently submitted
tha t the said condition was incorporated for favouring respondent
No.5 and respondent No.6 another bidder as such did not have
the requisite Hot Mix Palnt in existence on 18.11.2023 and
therefore with a view to give undue advantage to both the
respondents they were held to be qualified in the technical bid
and the rejection of the candidature of the petitioner had taken
place. Apparently, the petition had been filed by the petitioner on
29.12.2023 after the technical bid as such of the petitioner had
been duly considered and it had been found that he did not have
the qualifying criteria of Hot Mixing Plant within 30.00 km and
was not qualified.
::: Downloaded on - 04/01/2026 05:27:39 :::CIS
##PAGE3##3
4. It has now, in subsequent pleadings, come on record
that eventually the Award as such was given to respondent No.5
on 02.02.2024 and it is also stated that he has .completed the
Contract as such, which would be clear from the additional
affidavit now filed by the respondents No.1 to 4-State.
5. It is not disputed that respondent No.5 who had been
awarded the Contract as such had the necessary certificate
issued by the Assistrant Enginner, Rajgarh Sub-Division,
HPPWD, Rajgarh on 18.11.2023 (Annexure P-10), wherein it
has been mentioned that the Contractor had installed the Hot Mix
Plant on CNYK road at RD 40/200 at 29 km away from the
BB RC.
6. It is also pertinent to notice that as per the Invitation
for Bids (IFB) issued itself, as per Clause 14, the necessary
condition had already been incorporated. The same reads as
under:-
“14. Machinery/Plant and Lab Equipment Detail
proof ownership and Plant/machinery installed
within 30.00 km certificate signed and
issued/verified from the concerned Assistant
Engineer.”
7. It is thus apparent that the argument now raised that
it was for a tailor made as such by way of introduction by the
::: Downloaded on - 04/01/2026 05:27:39 :::CIS
##PAGE4##4
corrigendum, is without any basis. It is from day one as such that
the necessary requisite condition had been prescribed.
8. Counsel for respondents No.1 to 4-State has also
referred to the requirement of such a Plant within easy reach,
while referring to the communication dated 21.12.2023
(Annexure R-IV) that the work of metlling/tarring of the road of
bitumen material has to be carried through road and the road
was very narrow, too lonrg and as such to carry the bitumen to a
large distance and maintain to requisite temperature is very
d