HIGH COURT OF KERALA
R. NARAYANA PISHARADI, J
SAVITHA DUTT – Appellant
Versus
STATE OF KERALA – Respondent
O R D E R
The orders passed by the Enquiry Commissioner and Special Judge, Kottayam in the applications for discharge filed by the accused in the case C.C.No.5/2014 are under challenge in these revision petitions filed under Section 397 read with 401 of the Code of Criminal Procedure, 1973 (for short 'the Code') and the Criminal Miscellaneous Case filed under Section 482 of the Code.
2. There are altogether eleven accused in the case.
Accused No.1 was the Executive Engineer, Public Works Department (PWD), Roads Division, Alappuzha during the period from 02.12.2002 to 31.05.2003. Accused No.2 was the contractor engaged by the PWD for conveyance of packed bitumen from the Kochin Refineries Limited (KRL). Accused No.3 was the Assistant Engineer of the PWD Section, Alappuzha during the period from November 1999 to October 2004. Accused No.4 was the Assistant Engineer of the PWD Section, Cherthala during the period from 03.06.2002 to 31.01.2005. Accused No.5 was the Executive Engineer, PWD Roads Division, Alappuzha during the period from 27.06.2003 to 31.08.2005. Accused No.6 was the authorised agent of Accused No.2. Accus
Login now and unlock free premium legal research
Login to SupremeToday AI and access free legal analysis, AI highlights, and smart tools.
Login
now!
India’s Legal research and Law Firm App, Download now!
Copyright © 2023 Vikas Info Solution Pvt Ltd. All Rights Reserved.