2025 Supreme(Online)(Mad) 77003
IN THE HIGH COURT OF JUDICATURE AT MADRAS
MANINDRA MOHAN SHRIVASTAVA, CJ, R.POORNIMA, J
S.Anbazhagan – Appellant
Versus
The Commissioner Tiruchirapalli City Municipal Corporation – Respondent
W.P.(MD) No.28694 of 2025 | W.M.P.(MD) No. 22300 of 2025
Important Points
Subject
Public Law - Administrative Law
Act Referred
Headnote
For the Appellants/Petitioners: Mr.P. Arun Jayatram
For the Respondents: ----
| Table of Content |
|---|
| 1. allegations of unauthorized construction harming public infrastructure. (Para 1) |
| 2. court orders inquiry into alleged construction violations. (Para 2) |
| 3. writ petition disposed of with no cost. (Para 3) |
O R D E R
[Order of the Court was made by The Hon'ble CHIEF JUSTICE]
The petitioner has made a representation dated 26.09.2025 to the official respondents alleging that by violating the building permission, while raising construction, the fourth respondent is damaging the cement road, the common lane and the drainage water pipe.
2. The allegation, if not already enquired, is required to be duly enquiried by the third respondent, by conducting a spot inspection/survey. If it is found that the alleged illegallity in construction by the fourth respondent is affecting the public pathway, road or public drainage system, appropriate action is required to be taken. The enquiry shall be concluded within a period of three months from the date of receipt of a copy of this order and after giving an opportunity of hearing to the fourth respondent.
3. Writ Petition is, accordingly, disposed of. There shall be no order as to costs. Consequently, connected interim applications are closed.