2026 Supreme(Online)(Mad) 12125
IN THE HIGH COURT OF JUDICATURE AT MADRAS
HONOURABLE MR. JUSTICE R.VIJAYAKUMAR
K. Rajendhiran – Appellant
Versus
The Superintending Engineer – Respondent
##PAGE1##
WP(MD). No.1539 of 2025
BEFORE THE MADURAI BENCH OF MADRAS HIGH COURT
Dated : 04/02/2026
CORAM
THE HONOURABLE MR. JUSTICE R.VIJAYAKUMAR
WP(MD). No.1539 of 2025
K. Rajendhiran, ... Petitioner
Vs
1. The Superintending Engineer,
Tangedco, Ramanathapuram,
Ramanathapuram District..
2. The Executive Engineer,
Tangedco, Paramakudi,
Ramanathapuram District..
3. The Assistant Executive Engineer,
Tangedco, Parthibanoor,
Ramanathapuram District..
4. Samsudeen,
S/o.Daavidhu,
5. Mohammed Najim,
S/o.Daavidhu, ... Respondents
PRAYER :- Writ Petition filed under Article 226 of the Constitution of
India, praying this Court to issue a Writ of Mandamus to direct the
1/5
https://www.mhc.tn.gov.in/judis ( Uploaded on: 17/02/2026 04:21:31 pm )
##PAGE2##WP(MD). No.1539 of 2025
respondents 1 to 3 to shift the electricity poll and wire connection goes
through the petitioner's house site plot which provides connection to the
4th respondent property and relocate the same without any disturbance to
the petitioner's land lying in Survey No.251/43A2 and new Patta No.
9758, which is situated at Mela Parthibanoor, Parthibanoor Post,
Paramakudi Taluk, Ramanathapuram District within stipulated time fixed
by this Court.
For Petitioner : Mr.P. Ranjith Kumar
For R1 to R3 : Mr.S.Deena Dhayalan
Standing Counsel
For R4 : Mr.P.Venkatasubramanian
ORDER
The present writ petition has been filed seeking a Writ of
Mandamus directing the respondents 1 to 3 to shift the electricity pole
and wire connection goes through the petitioner's house site and relocate
the same without any disturbance to the petitioner's land in Survey No.
251/43A2 and new Patta No.9758, which is situated at Mela
Parthibanoor, Parthibanoor Post, Paramakudi Taluk, Ramanathapuram
District.
2/5
https://www.mhc.tn.gov.in/judis ( Uploaded on: 17/02/2026 04:21:31 pm )
##PAGE3##WP(MD). No.1539 of 2025
2. According to the learned counsel appearing for the writ
petitioner, even though the electricity poll is outside his property, the
electrical lines are running through his property, which are obstructing
construction activities. Since he wants to put up the construction on the
property, he made a representation to the respondents for relocating the
same. However, the said request has been rejected by the fourth
respondent on the ground that the electricity service connections are
being drawn only through the said pole.
3. The learned Standing Counsel appearing for the respondents 1
to 3 submitted that if the petitioner makes any fresh application under
DWC Scheme, depending upon feasibility, the relocation of the
electricity pole would be considered.
4. It is made clear that the service connection to the fourth
respondent's property should not be affected in any manner.
3/5
https://www.mhc.tn.gov.in/judis ( Uploaded on: 17/02/2026 04:21:31 pm )
##PAGE4##WP(MD). No.1539 of 2025
5. In view of the above, this writ petition stands disposed of with a
direction to the writ petitioner to file an appropriate application to the
respondents 1 to 3 under the DWC scheme. Based upon the application,
the respondent 1 to 3 are directed to proceed in accordance with law,
depending on the outcome of the feasibility report. The said exercise
shall be completed within a period of 12 weeks from the date of receipt
of a copy of this order. No Costs.
04.02.2026
TTA
TO
1. The Superintending Engineer,
Tangedco, Ramanathapuram,
Ramanathapuram District..
2. The Executive Engineer,
Tangedco, Paramakudi,
Ramanathapuram District..
3. The Assistant Executive Engineer,
Tangedco, Parthibanoor,
Ramanathapuram District..
4/5
https://www.mhc.tn.gov.in/judis ( Uploaded on: 17/02/2026 04:21:31 pm )
##PAGE5##WP(MD). No.1539 of 2025
R.VIJAYAKUMAR,J
TTA
ORDER
IN
WP(MD) No.1539 of 2025
Date : 04/02/2026
5/5
https://www.mhc.tn.gov.in/judis ( Uploaded on: 17/02/2026 04:21:31 pm )