2026 Supreme(Online)(Mad) 15783
IN THE HIGH COURT OF JUDICATURE AT MADRAS
Honourable Ms. Justice P.T. ASHA
M/S.Bharathi Solar P Ltd – Appellant
Versus
TAMIL NADU POWER DISTRIBUTION CORPORATION LTD (TNP – Respondent
IN THE HIGH COURT OF JUDICATURE AT MADRAS DATED: 09-02-2026 CORAM THE HON'BLE MS. JUSTICE P.T. ASHA M/S.Bharathi Solar P Ltd, 119/50,New Avadi Road,Kilpauk,Chennai 600
010,Repd by its,Director IshwaryaShankaralingam ..Petitioner(s)
Vs
1. Tamil Nadu Power Distribution Corporation Ltd (tnpdcl), Rep.by its Chairman, 144,Anna salai,Chennai 600 002. 2. The Joint Managing Director, Tamil Nadu Green Energy Corporation Ltd(TNGECL),2nd Floor,144,Anna salai,Chennai 600 002.
3. The Chief Engineer / NCES, Tamil Nadu Green Energy Corporation Ltd (TNGECL),2nd Floor,144,Anna Salai,Chennai
600 002.
4. The Superintending Engineer/Solar, Tamil Nadu Green Energy Corporation Ltd, (TNGECL),2nd Floor,144,Anna Salai,Chennai
600 002.
..Respondent(s)
Prayer:- Writ petition filed under Article 226 of the Constitution of India praying for issuance of a writ of Mandamus, directing the 1st to 4th respondent to grant the necessary clearance for establishment of he Petitioners 50MW Solar Power Plant along with pooling sub-station for connectivity to th existing Asanur 110/33-11KV Substation as per the 4th Respondents Load Flow Study dated 30.11.2023 within a stipulated time.
For Petitioner(s): Mr.R.S. Pandiyaraj For Respondent(s): Mr.D.R.Arun Kumar, St.Counsel
ORDER
This Writ Petition has been filed for the following reliefs:-
“ directing the 1st to 4th respondent to grant the necessary clearance for establishment of he Petitioners 50MW Solar Power Plant along with pooling sub-station for connectivity to the existing Asanur 110/33-11KV Substation as per the 4th Respondents Load Flow Study dated 30.11.2023 within a stipulated time.”
2. It is submitted by the learned counsel for the respondents that the only reason the petitioner’s application was not processed was on the ground that the documents, as directed in the letter dated 20.05.2024, had been submitted after 60 days. However, a perusal of the record would clearly show that the said documents were submitted within a period of 59 days. Therefore, the only reason for not processing the petitioner’s application no longer exists.
3. In view of the above, the Writ Petition is disposed of with a direction to the respondents to process the petitioner’s application within a period of one week from the date of receipt of a copy of this order. No costs.
09-02-2026 Index: Yes/No Speaking/Non-speaking order Neutral Citation: Yes/No SHR To
1. Tamil Nadu Power Distribution Corporation Ltd (tnpdcl), Rep.by its Chairman, 144,Anna salai,Chennai 600 002. 2. The Joint Managing Director, Tamil Nadu Green Energy Corporation Ltd(TNGECL),2nd Floor,144,Anna salai,Chennai 600 002.
3. The Chief Engineer / NCES, Tamil Nadu Green Energy Corporation Ltd (TNGECL),2nd Floor,144,Anna Salai,Chennai
600 002.
4. The Superintending Engineer/Solar, Tamil Nadu Green Energy Corporation Ltd, (TNGECL),2nd Floor,144,Anna Salai,Chennai
600 002.
P.T.ASHA, J.
SHR
09-02-2026