2026 Supreme(Online)(MP) 115714

IN THE HIGH COURT OF MADHYA PRADESH AT INDORE
MUDRA STEEL INDUSTRIES PRIVATE LIMITED – Appellant
Versus
TATE OF MADHYA PRADESH AND OTHERS – Respondent
W.P. Nos.35908/2026 & 25194/2026



##PAGE1##

IN THE HIGH COURT OF MADHYA PRADESH AT INDORE BEFORE HON’BLE SHRI JUSTICE SUBODH ABHYANKAR AND HON’BLE SHRI JUSTICE JAI KUMAR PILLAI N th PASSED O 28 SEPTEMBER, 2026 N W.P. os.35908/2026 & 25194/2026 MUDRA STEEL INDUSTRIES PRIVATE LIMITED Versus STATE OF MADHYA PRADESH AND OTHERS Appearance:

Shri Amit Agrawal – Senior Advocate assisted by Shri Akhil Godha – Advocate for the petitioner.

Shri Pradyumna Kibe – Government Advocate for the respondent No.1/State.

Shri Aniket Naik – Advocate for the respondents No.2 and 3.

______________________________________________________

##PAGE2##

W.P. o.25194/2026 M/S PENSOL INDUSTRIES PRIVATE LIMITED WEVersus STATE OF MADHYA PRADESH AND OTHERS Appearance:

Shri Abhinav Dhanodkar – Advocate for the petitioner.

Shri Pradyumna Kibe – Government Advocate for the respondent Nos.1 and 5/State.

Shri Aniket Naik – Advocate for the respondents No.2, 3 and 4.

Shri Amit Agrawal – Senior Advocate assisted by Shri Akhil Godha – Advocate for the respondent No.6.

______________________________________________________

Per: Justice Jai Kumar Pillai :

O R D E R

1. Since the common question is involved in both the writ petitions, therefore, the same is being heard and decided together by this Order.

2. For the convenience the facts have been taken from W.P.

No.35908/2016.

##PAGE3##

3. The petitioner has approached this Court under Article 226 of the Constitution of India. The petitioner has challenged the closure directions dated 27.08.2026 issued by the respondent No.2, Madhya Pradesh Pollution Control Board. The closure order was issued under Section 31-A of the Air (Prevention and Control of Pollution) Act, 1981. By way of an amendment to the writ petition, the petitioner has also challenged two other orders passed by the Board. The first is the order dated 29.04.2026, which rejected the initial application for renewal of the Consent to Operate. The second is the order dated 11.09.2026, which rejected the fresh application for the Consent to Operate.

FACTS OF THE CASE

4. The petitioner is a Private Limited Company. It operates a factory to manufacture TMT steel bars at Pithampur in District Dhar. The manufacturing process involves melting scrap and sponge iron in an open induction furnace. The fumes from this furnace are passed through a bag filter house for air pollution control. After filtration, the air is released through a chimney into the atmosphere.

5. The respondent Board granted the Consent to Operate to the petitioner on 21.04.2025. This consent was valid up to 31.03.2026. A specific condition was mentioned in this consent order. Condition No.13 stated that the Industry must install a "Dog House Type" fumes extraction system on both induction furnaces within six months.

##PAGE4##

6. The petitioner applied for the renewal of the Consent to Operate on 28.03.2026, just before the previous consent was going to expire. The respondent authorities inspected the factory on 14.04.2026. After the inspection, the Board rejected the renewal application on 29.04.2026. The Board found multiple defects, including the failure to install the required fumes extraction system. 7. Following the rejection, the Board issued an order on 08.05.2026 under Section 31-A of the Air Act. By this order, the factory was directed to be closed and the electricity connection was disconnected. The petitioner then submitted a representation on 28.05.2026. The petitioner asked for 90 days to upgrade the fumes extraction system and submitted a bank guarantee of Rs.17,62,500/- 8. Based on this bank guarantee, the Board issued a conditional order on 16.06.2026. The earlier closure order was put on hold, and the petitioner was allowed to upgrade the extraction system till 31.07.2026. The petitioner claims that the upgradation work was completed within this time limit. The petitioner then filed a fresh application on 13.08.2026 for the Consent to Operate.

##PAGE5##

9. On 19.08.2026, an officer of the Board inspected the factory. The Officer noted