2024 Supreme(Online)(NGT) 1046

Item No. 03 BEFORE THE NATIONAL GREEN TRIBUNAL CENTRAL ZONE BENCH, BHOPAL (Through Video Conferencing)

Original Application No. 52/2024(CZ)

(O.A. No. 16/2024 – PB)

Dr. Ramsharan Tondan Applicant(s)

Vs.

State of Chhattisgarh & Ors. Respondent(s)

Date of Hearing: 23.04.2024 CORAM : HON’BLE MR. JUSTICE SHEO KUMAR SINGH, JUDICIAL MEMBER HON’BLE DR. AFROZ AHMAD, EXPERT MEMBER For A pplica nt(s): No ne.

For Respondent(s) : Mr. Abhinay, Adv (with Ms. Kirti Vyas, Adv.)

ORDER

1. T he issues raised in this application is discharge of solid waste and untreated water into the water bodies in Village-Birkoni, Praswani Road, NEH-06, Tehsil and District-Mahasamund, Chhattisgarh.

2. The matter was taken up by this Tribunal and a committee/State Pollution Control Board was directed to submit the factual and action taken report. The members of the committee visited the site and submitted the report as follows :-

“The joint committee visited Birkoni area at Mahasamund on 14th March, 2024 to assess the factual status of allegation made in petition and present status of industrial activity if any. The joint committee comprised of the following officers:

a) Sh. Aashish Karma Dy. Collector, Mahasamund Chhattisgarh.

b) Dr. Anoop Chaturvedi, Scientist „B‟ , Regional Directorate, CPCB, Bhopal.

c) Sh. Prasanna Sonkar, Assistant Engineer Regional office, CECB, Raipur, Chhattisgarh To better coordination in the investigation, the committee informed to applicant well in advance regarding the proposed visit. The meeting was held at the office the M/s 9M India Pvt. Ltd. Mahasamund (further refered as Unit) on 14.03.2024. During meeting all committee members and Shri Ramsharan Tondan (applicant) along with his other colleagues were presented and discussed the issues mentioned in the petition. The unit representative Sh. Manish Agrawal is also present there and explained about technical operation of the unit and leagal aspects of the case. The relevant issue also discussed with Sh. Umesh Sahu SDM Mahasamund, Sh. Tamradhawaj Sarpanch Birkoni and other local residents during visit. The other officials present during the inspection are Shri. Rupender Kumar, Sci-B CPCB, Sh. Chandra Shekhar Mandai Tahsildar and Shri Sunil Kolhatkar Sr. lab assistant CPCB. The attendance list of officers and other stake holders present during inspection is enclosed. The main contentions of the petition are wastewater discharge by the Unit.

To find out facts as well as to know the extent of problem, the committee visited the plant premises and visited all Khasra numbers physically which are mentioned in petition and discussed the issue of discharged in their village area if any or any instances of this in the recent past. The major observation of physical survey has been recorded in the form of Panchnama, which is enclosed. After inspection of site committee members again interacted with the applicant, Sarpanch and other local residents to provide further opportunities for providing any other information related to the petition.

GPS location of the unit at Birkoni has been recorded using a mobile-based GPS application. The Google map of the site and photographs taken during the inspection are enclosed herewith.

The geographical coordinates of unit and its surrounding area is

21”10‟49.51”N,82”03‟13.68”E.

The main issues raised in the petition by the Applicant are as under : -

i. Community pond getting polluted due to discharge of waste water by the unit.

ii. Rules relaxation in industrial operation.

iii. The land allotted to industrial unit is belongs to cultivable land allotted to landless by the government.

The committee made the following observation during site visit on the above mentioned issues :-

Issue No. 01 – Community pond getting polluted due to discharge of wastewater by the unit.

i. The 9M India Limited (Further referred as Unit) was initiated its installation in Sept. 2022 after getting CTE from the CECB, the copy of the CTE is enclosed and still unit is under its commissioning stage and no commercial production started by the unit till the date of visit. The unit has not got the CTO from CECB and installed equipment‟s are being operated only for trail purpose. The written submission given by the unit regarding no commercial production started is enclosed. It was also observed that at the time of visit the unit was not in operation.

ii. As informed by the unit representative Sh. Manish Agrawal that the unit is only associated with pharmaceutica

1
2
3
4
5
6
7
8
9
10
11