NATIONAL GREEN TRIBUNAL NEW DELHI (PRINCIPAL BENCH)
Adarsh Kumar Goel, CJ, Sheo Kumar Singh, J, Nagin Nanda, EM
Vaishali Rana Chandra & Ors. – Appellant
Versus
Union of India & Ors. – Respondent
| Table of Content |
|---|
| 1. addressing flooding and groundwater issues. (Para 1) |
| 2. proposed measures for rainwater harvesting. (Para 2) |
| 3. importance of ecological restoration. (Para 3) |
| 4. a comprehensive environmental approach is documented. (Para 4 , 5) |
| 5. application is disposed of as no further orders are required. (Para 6) |
ORDER
1. The issue for consideration is the remedial action to control flooding and to increase rain water harvesting which measures are said to have been adversely affected on account of concretization of the Badshahpur drain at Gurgaon.
2. The matter was considered on 18.12.2019 in light of report of the State PCB dated 21.10.2019 to the effect that concretization leads to reduced ground water recharge and increased potential for flooding and thus even if concretization is to stay, these factors must be neutralised.
The Tribunal observed:
During the hearing, it is prayed that the concretization was done 5 years back. The fact remains that even if the concretization is not to be undone, the abatement measures need to be adopted to ensure that rain water harvesting and ground water recharge are not affected and flooding is avoided.
On these aspects, the State of Haryana needs
Login now and unlock free premium legal research
Login to SupremeToday AI and access free legal analysis, AI highlights, and smart tools.
Login
now!
India’s Legal research and Law Firm App, Download now!
Copyright © 2023 Vikas Info Solution Pvt Ltd. All Rights Reserved.