2023 Supreme(Online)(NGT) 219
Item No. 2 Court No. 1 BEFORE THE NATIONAL GREEN TRIBUNAL PRINCIPAL BENCH, NEW DELHI Original Application No. 536/2023 (I.A. No. 685/2023 & I.A. No. 686/2023)
Deepesh Jalal Applicant Versus Ministry of Environment, Forest & Climate Change & Ors. Respondent(s)
Date of hearing: 31.08.2023 CORAM: HON(cid:146)BLE MR. JUSTICE PRAKASH SHRIVASTAVA, CHAIRPERSON HON(cid:146)BLE MR. JUSTICE SUDHIR AGARWAL, JUDICIAL MEMBER HON(cid:146)BLE DR. A. SENTHIL VEL, EXPERT MEMBER Applicant: Mr. V.K. Shukla & Mr. Sugam Mishra, Advocates
For the Petitioner: VINOD KUMAR SHUKLA
For the Respondent:
ORDER
Per Justice Sudhir Agarwal, Judicial Member
1. This Original Application (hereinafter referred to as (cid:145)OA(cid:146)) under Section 14 of National Green Tribunal Act, 2010 (hereinafter referred to as (cid:145)NGT Act, 2010(cid:146)) has been filed by three applicants - Deepesh Jalal S/o Shri Jeewan Singh resident of Village Devipura, Tehsil Kaladungi, Dist Nainital; Anil Kumar Walia S/o Surinder Kumar Walia resident of Haripur, Tehsil Kaladungi, District Nainital and Mahindra Singh Bisht S/o Lal Singh Bisht resident of Ratanpur West, Tehsil Haldwani District, Nainital with the prayer that official respondents be directed not to allow establishment and operation of new distillery plant of 60 KLD to produce Ethanol (Power alcohol)/ RS, from damaged grain and coarse grain along with Co-generation power plant of 2 MW by M/s Maa Sheetla Venture Limited, Respondent No. 5 (hereinafter referred to as (cid:145)Project Proponent(cid:146) or (cid:145)PP(cid:146)) on the proposed site i.e. Khasra No. 26 Ka, 27 Ka, Village Surpur, Tehsil Kaladungi, District Nainital, Uttarakhand.
2. It is said that the site where Project Proponent intends to establish this plant comes in the category of semi-critical zone with respect to ground water and huge requirement of 1117 KLD ground water everyday by the said plant will create an scarcity of water for drinking and agriculture purposes in the area concerned. It is also said that Environmental Clearance (hereinafter referred to as (cid:145)EC(cid:146)) has been granted vide letter dated 18.01.2022 issued by Ministry of Environment, Forest and Climate Change (hereinafter referred to as (cid:145)MoEF&CC(cid:146)) which has been obtained by PP furnishing wrong information/ concealment and/or withholding of relevant information and therefore PP cannot be allowed to execute project on the basis of such illegally obtained EC. Giving details of wrong information/ concealment and/or withholding of relevant information in Form I and Environment Management Plan (hereinafter referred to as (cid:145)EMP(cid:146)) submitted by PP for grant of EC, applicants have said as under:
a. In EMP, PP has said that there is no wildlife corridor in 10 kms of the proposed site, while just at a distance of 1.7 km, there is wildlife corridor namely Fatehpur Gadgadia;
b. PP has drilled water recharge bores without permission of government bodies for putting waste water into the ground. If project is allowed to be executed and operated, it is likely to contaminate ground water in the entire area;
c. Nearest village disclosed in EMP is Surpur which is about 0.84 kms from the site of proposed plant, though, actually the nearest village is Devipura which is at a distance of 30 feet from the site, as there is only a road separating the site and Village Devipura;
d. It is wrongly mentioned in the EC that there is a water body/river named as Gularghati flowing at a distance of 1.3 km in east though no such water body exists in the entire District Nainital. In fact, there are only two water bodies/rivers in the area Bhaur and Bakra. River Bakra is perineal and entire water is used for irrigation in the area of Chakalwa, while river Bhaur is non-perineal seasonal river flows only in monsoon;
e. Requirement of fresh water mentioned in EC is beyond the quantity of fresh water permitted i.e., 4 KL for production of 1 KL ethanol and since the plant capacity is 60 KL ethanol, the total requirement of groundwater should not exceed 240 KLD;
f. PP has installed 3 borewells for fetching 370 KLD ground water without disclosing to the authorities in EMP that in the area of 1.9 km aerial radius from proposed site, there are 10 government tubewells for irrigation out of which 1 has dried away but 9 tubewells are functional causing depletion of ground water regularly and this fact has not been disclosed by PP to the authorities concerned;
g. PP has been permitted to generate noise upto 75 dbA in day time and 70 dbA at night, which is permitted only in