NATIONAL GREEN TRIBUNAL NEW DELHI (PRINCIPAL BENCH)
Sudhir Agarwal, Judicial Member, Afroz Ahmad, Expert Member
Sandeep – Appellant
Versus
JR Group Power Automobile India Pvt. Ltd – Respondent
Original Application No.684/2023



Advocates:
For the Appellants/Petitioners: Applicant in person
For the Respondents: Ms. Priyanka Swami, Mr. Sanket Gupta, Mr. Anand Awasthi, Mr. Dhiranjan Ojha, Mr. Shlok Mittal, Ms. Shivani Pandey, Mr. Shivam Singh, Mr. Rahul Khurana, Mr. Srinivas Vishven

NGT mandates remediation opportunity before closure for environmental violations; post-compliance, imposes compensation for past pollution to fund restoration while disposing application.

Headnote:(A) National Green Tribunal Act, 2010 - Sections 14 and 15 - Air (Prevention and Control of Pollution) Act, 1981 - Sections 21, 22, 26, 31A - Water (Prevention and Control of Pollution) Act, 1974 - Sections 24, 33A, 43 - Environment (Protection) Act, 1986 - Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 - Plastic Waste Management Rules, 2016 - Complaint of air pollution from industrial operations causing health issues to residents - Joint Committee identified sources of volatile organic pollutants, unscientific storage of hazardous wastes, and obstruction by scrap - Ambient air monitoring showed exceedances of benzene, heavy metals within or near limits - Tribunal directed remedial measures including improved waste handling, stack height increase, additional nozzles - Post-compliance verification confirmed improvements with parameters now met - Environmental compensation for past violations directed. (Paras 1-16)

(B) Environmental Compliance - Principles of natural justice require opportunity to project proponent before closure - Remedial actions like hiring consultants, agreements for waste disposal, infrastructure upgrades, performance security deposit upheld - Ongoing monitoring and safety audits recommended - Compensation for past violations to fund remediation by Joint Committee. (Paras 8-11)

Facts of the case:
Suo-moto cognizance taken on complaint of air pollution from automobile manufacturing unit involving paint processes, hazardous waste mismanagement, and scrap storage causing health hazards. Joint Committee reports confirmed violations; remedial steps taken post-directions; latest monitoring showed compliance.

Findings of Court:
Industrial unit directed to complete environmental compensation process for past violations within two months; proceeds for remediation by Joint Committee of District Magistrate, State PCB, CPCB; application disposed of upon compliance.

Issues: Whether air emissions exceeded norms, hazardous waste managed properly, and appropriate remedies for violations including compensation and closure avoidance.

Ratio Decidendi: Tribunal balances enforcement with natural justice by granting remediation opportunity; post-verified compliance averts closure; past violations warrant compensation for environmental restoration.

Result: Original Application disposed of.

Table of Content
1. suo-moto cognizance of air pollution complaint. (Para 1 , 2)
2. identified sources of volatile pollutants and hazards. (Para 3 , 4)
3. initial violations confirmed; air quality exceeded limits. (Para 5 , 6 , 7)
4. opportunity granted for remedial measures before closure. (Para 8 , 9)
5. compliance steps implemented for waste and emissions. (Para 10 , 11)
6. current air quality compliant; past violations noted. (Para 12 , 13)
7. impose compensation for past violations; application disposed. (Para 14 , 15 , 16)

ORDER

1. This Original Application under Section 14 and 15 of National Green Tribunal Act, 2010 (hereinafter referred to as ‘NGT Act, 2010’) has been registered by exercising suo-moto jurisdiction taking cognizance of complaint made by the applicant in person that respondent 1, M/s J.R. Group Power Automobile is operating in Sector 7, HSIIDC, IMT, Bawal causing air pollution which is resulting in breathing problems and ailments to the residents of the locality.

2. Tribunal took cognizance of complaint on 08.11.2023 and order to verify facts by constituting a Joint Committee comprising \representatives of CPCB, State PCB and Deputy Commissioner, Rewari. The Committee was directed to visit the site, collect relevant information, look into the grievances of the applicant, associate the applicant and representative of project proponent, and submit the factual report.

3. Initially an interim report dated 13.02.2024 was filed by the Joint Committee observing that there are three potential sources responsible for volatile organic pollutants causing smell and breathing problems and the same are as under:

(i). Paint Shop Exhaust with water Droplets

(ii). Unscientific Storage of Paint Sludge, a hazardous waste, and

(iii). Effluent Treatment Plant Sludge, another hazardous waste.

4. Report further stated that plastic reject being reused in production of plastic automobile parts, lying outside the controlled area and open space resulting in blocking free and safe passage mandatorily required to be maintained by the proponent to avoid fire hazard. Committee also observed that Ambient Air Quality Monitoring for Benzene (Gaseous phase), Benzo-a-pyrene, Nickel (NI), Arsenic (Ar), Lead (Pb) be undertaken to establish that volatile emissions are released during the industrial operation along with heavy metal.

5. Respondent 1 filed reply dated 14.02.2024, denying all the allegations and stating that it is operating industrial unit strictly in accordance with rules and without flouting any environmental norms and laws. However, with regard to Ambient Air Quality, no test report was placed on record to show that no air pollution was being caused by it.

6. Respondent 3 later on submitted a detailed Action taken Report dated 03.04.2024 stated that monitoring of ambient air quality was carried out on 01.03.2024 and 05.03.2024 by a Laboratory recognized under Environment Protection Act, 1986 (hereinafter referred to as ‘EP Act, 1986’) and engaged by respondent 3- HSPCB. Monitoring was carried at three locations each inside (at point A, B and C) and outside (at point D, E and F) of premises of proponent. Analytical results of ambient air quality monitoring are given in the form of chart in para 2 (ii) and further observations are given in para 2 (iii) & (iv) which are reproduced as under:

“(ii). The analytical results of the ambient air quality monitoring are tabulated below:-

Location A ( Near Main Gate No.2 and paint booth exhaust)

Parameters UnitStanda rd LimitsResultsResults after applying Coefficient of Correction
Nickel (N)mg/m32015.4420.55
Arsenic ( As)mg/m3065.977.94
Benzo ( a) Pyrene (BaP)mg/m301BDL-
Lead ( Pb)mg/m31.00.390.51
Benzene as C6H6mg/m30505.907.85

Location B (Near Cooling Tower)

Parameters UnitStand ard LimitsResultsResults after applying Coefficient of Correction
Nickel (N)mg/m3207.259.64
Arsenic ( As)mg/m3065.617.46
Benzo ( a) Pyrene (BaP)mg/m301BDL-
Lead ( Pb)mg/m31.00.270.35
Benzene as C6H6mg/m3053.885.16

Location C (Near Scrap Yard A

Click Here to Read the rest of this document
1
2
3
4
5
6
7
8
9
10
11
SupremeToday Portrait Ad
supreme today icon
logo-black

An indispensable Tool for Legal Professionals, Endorsed by Various High Court and Judicial Officers

Please visit our Training & Support
Center or Contact Us for assistance

qr

Scan Me!

India’s Legal research and Law Firm App, Download now!

For Daily Legal Updates, Join us on :

whatsapp-icon Back to top