2024 Supreme(Online)(NGT) 3278

NATIONAL GREEN TRIBUNAL NEW DELHI (PRINCIPAL BENCH)
SUDHIR AGARWAL, Judicial Member, AFROZ AHMAD, Expert Member
RAGHUBIR SINGH GARIA – Appellant
Versus
STATE OF UTTARAKHAND – Respondent
ORIGINAL APPLICATION NO. 453/2023|I.A. No.225/2024



For the Appellants/Petitioners: None
For the Respondents:Mr. Deepak Bora and Mr. Sai Darshan Patra, Advocates for State of Uttarakhand, Mr. Mukesh Verma and Ms. Vatsala Tripathi, Advocates for UKPCB (through VC), Mr. Shashwat Panda, Advocate for respondent no. 5

Mining prohibited in geo-tectonic fragile zones without prior seismic study by experts confirming ecological viability; environmental compensation mandatory for violations; existing leases subject to review.

Headnote:(A) National Green Tribunal Act, 2010 - Sections 14 and 15 - Environment (Protection) Act, 1986 - Mining in geo-tectonic fragile zones - Suo-moto OA initiated on letter petition alleging illegal soapstone mining causing environmental damage, landslides, and river pollution - Mining lease extended with requisite clearances but violations found including mining beyond lease area, debris dumping near drain without retaining wall, and recurrent landslides - No environmental compensation imposed despite penalties for illegal mining - Held, mining must cease until expert seismic study confirms ecological viability; environmental compensation to be assessed and recovered; no mining permissible in delicate geo-tectonic areas without prior study by seismology experts. (Paras 24, 25, 26, 28)

(B) Sustainable Development - Precautionary Principle - In ecologically fragile lesser Himalayan zones with weak rock structures prone to landslides due to heavy rain and overburden saturation, mining activities impermissible without comprehensive geo-tectonic impact study; existing operations to be reviewed PAN India via expert committees including seismological specialists; mechanical approvals prohibited to avert serious ecological consequences. (Paras 26, 27)

Facts of the case:
Suo-moto proceedings on complaint of illegal mining in approved lease area turning fertile land barren, depleting resources, polluting river via debris, and triggering landslides endangering residences; joint inspection confirmed violations like excess mining, improper debris disposal risking drain contamination, damaged retaining walls, prior stoppage orders ignored with royalty penalties paid; lease holder claimed valid permissions, denied illegality, alleged complainant extortion; mining halted since March 2024.

Findings of Court:
Environmental compensation to be assessed/recovered for illegal mining; no further mining absent expert clearance on seismic/ecological feasibility; joint committee with specified experts to study site within three months; compliance report by specified date; general directions issued for geo-tectonic zone mining review PAN India.

Issues: Whether violations warrant compensation and mining halt; feasibility of mining in landslide-prone fragile geo-tectonic area; need for seismic studies prior to approvals in such zones.

Ratio Decidendi: In geo-tectonic sensitive fragile areas, mining prohibited without prior ecological sustainability study by seismology experts; authorities must not mechanically permit operations risking severe environmental harm; violations necessitate compensation and cessation pending viability clearance (Paras 25-30).

Result: OA disposed with directions; pending IA disposed.

Table of Content
1. suo-moto oa on illegal soapstone mining complaint. (Para 1 , 2)
2. joint committee finds lease violations, landslides, debris issues. (Para 3 , 4 , 5 , 6 , 7 , 8 , 9 , 10)
3. parties dispute mining legality, permissions, and compliance. (Para 11 , 12 , 13 , 14 , 17 , 18 , 19)
4. court notes violations, absent ec, ongoing landslides. (Para 20 , 21 , 22 , 23 , 24)
5. ban mining in fragile geo-tectonic zones sans seismic study. (Para 25 , 26 , 27 , 28 , 29)
6. direct ec assessment, expert study, compliance reporting. (Para 30 , 31 , 32 , 33 , 34 , 35)

JUDGMENT

BY HON’BLE MR. JUSTICE SUDHIR AGARWAL, JUDICIAL MEMBER

1. This Tribunal registered the present Original Application (hereinafter referred to as ‘OA’) under Sections 14 and 15 of National Green Tribunal Act, 2010 (hereinafter referred to as ‘NGT Act, 2010’) in exercise of suo-moto jurisdiction in view of law laid down by Supreme Court in Municipal Corporation of Greater Mumbai vs. Ankita Sinha, (2022) 13 SCC 401 on the basis of a letter petition dated 23.04.2023 sent by Raghubir Singh Garia, resident of village and post-Papon, District- Bageshwar, State of Uttarakhand.

2. Complainant has said that illegal mining of soap stone is going on in his village for several months causing damage to environment and leading to depletion of natural resources but no action has been taken by the concerned authorities. Once fertile land is turned into barren land, scarcity of water would become daily struggle for both humans and animals. Debris generated from mining is polluting nearby Punger river and harming aquatic life which has severe impact on eco-system and environmental balance. The main violator is named as Anand Singh Kalakoti, son of Diwan Singh Kalakoti, resident of village and post office- Dofar, District Bageshwar.

3. Tribunal’s Order dated 01.08.2023: Taking cognizance of the complaint on 01.08.2023, Tribunal found it appropriate to verify the facts and thus constituted a Joint Committee comprising Uttarakhand State Pollution Control Board (hereinafter referred to as ‘UKPCB’) and District Magistrate, Bageshwar. The Committee was required to submit its report within one month.

Joint Committee Report dated 01.11.2023:

4. Pursuant to order dated 01.08.2023, Joint Committee submitted report vide e-mail dated 01.11.2023 stating that mining lease for 20 years was sanctioned to Anand Singh Kalakoti vide Government order dated 08.02.2002 for carrying out mining in village Papon, Tehsil and District Bageshwar over an area of 2.81 acres i.e., 1.14 hectares for extraction of soap stone. The said lease expired on 21.02.2022, since, lease deed was registered on 22.02.2002. By a subsequent Government Order dated 03.01.2022, the mining lease has been extended by 30 years. State Level Environment Impact Assessment Authority, Uttarakhand (hereinafter referred to as ‘SEIAA Uttarakhand’) granted Environmental Clearance (hereinafter referred to as ‘EC’) dated 06.12.2019 to Anand Singh Kalakoti for extraction of mineral of the quantity of 5105 to 7184 tonnes per annum. Mining plan was approved by Director, Geology and Mining on 08.12.2022 and use of machines was permitted by Directorate Mining Safety, Ghaziabad vide letter dated 01.09.2011. Consent was issued by UKPCB on 22.05.2023 valid upto 31.03.2024. Joint Committee however found mining beyond the sanctioned lease area and other violations also. The observations and recommendations of Joint Committee are reproduced as under:

English Translation by Tribunal:

“The joint inspection report is as follows:-

01. Mining lease of mineral soapstone was granted for a period of 20 years in favour of Shri Anand Singh Kalakoti S/o Shri Diwan Singh Kalakoti, R/o village Dophad, District and Tehsil Bageshwar by Industrial Department Section-1, vide Government of Uttarakhand OM No. 2424/Au.Vi./74-B/2001, dated 08-02-2002 in a total area of 2.81 acres i.e. 1.14 hectares under the area of village Papon of district and tehsil Bageshwar. The registration of t

Click Here to Read the rest of this document
1
2
3
4
5
6
7
8
9
10
11
SupremeToday Portrait Ad
supreme today icon
logo-black

An indispensable Tool for Legal Professionals, Endorsed by Various High Court and Judicial Officers

Please visit our Training & Support
Center or Contact Us for assistance

qr

Scan Me!

India’s Legal research and Law Firm App, Download now!

For Daily Legal Updates, Join us on :

whatsapp-icon Back to top