NATIONAL GREEN TRIBUNAL NEW DELHI (PRINCIPAL BENCH)
Prakash Shrivastava, Chairperson, A. Senthil Vel, Expert Member, Afroz Ahmad, Expert Member
NEWS ITEM PUBLISHED IN THE TRIBUNE DATED 16TH JANUARY 2023 TITLED JOSHIMATH DISASTER A WARNING FOR MUSSOORIE VS
Original Application No.51/2023



Advocates:
For the Respondents: Mr. Deepak Bora & Mr. Sai Darshan Patra, Advs. for the State of Uttarakhand with Dr. Parag Madhukar Dhakate, Member Secretary, UKPCB
Mr. Kaushal Gautam & Ms. Vanshik Singh, Advs. for UKPCB
Mr. Rahul Verma, AAG for the State of Uttarakhand
Mr. Mukesh Verma, Advocate for UKPCB

Unplanned constructions beyond carrying capacity in eco-sensitive Himalayan areas cause subsidence and landslides; NGT mandates expert studies, 19 time-bound remedial measures with monitoring to protect fragile ecosystems.

Headnote:(A) National Green Tribunal - Suo motu proceedings - Environmental protection in eco-sensitive Himalayan regions - Unplanned constructions beyond carrying capacity leading to land subsidence, landslides, and ecological damage - Imperative for holistic carrying capacity studies covering constructions, vehicular traffic, sanitation, soil stability, flora/fauna - Constitution of joint expert committee to suggest remedial measures including hydro-geology, geo-morphological studies - Direction for time-bound action plan identifying issues, remedial actions, accountable agencies, quarterly monitoring by Chief Secretary - 19 preventive/remedial measures mandated covering geological investigations per BIS codes, GIS-based decision support systems, building retrofitting, slope stabilization, drainage systems, phytoremediation, spring rejuvenation, sewerage/STPs, waste management, tourist registration, traffic control - Progress monitored with deficiencies noted earlier (e.g., STP capacity gaps, unsafe buildings status) leading to further affidavits - Liberty to take expert assistance. (Paras 1-18)

(B) Environmental Compliance - Fragile ecosystems - State obligation to ensure measures not disturb environment beyond carrying capacity - Action taken reports with timelines, budgets, responsible departments - Disposal with direction for full implementation of 19 action points and submission of six-monthly report to Registrar General. (Paras 11, 14-18)

Facts of the case:
Suo motu proceedings initiated on media report linking disaster-like conditions to unplanned constructions beyond carrying capacity in eco-sensitive hill town, warning of similar risks elsewhere; joint committee report assessed 19 measures; action taken reports filed showing progress, timelines, budgets across departments; earlier deficiencies in STP utilization, unsafe buildings, drainage addressed in subsequent affidavits.

Findings of Court:
Considerable progress made in all 19 action areas with time-bound plans, budgets, accountable agencies; State to implement fully based on scientific principles to protect fragile Himalayan environment.

Issues: Necessity of carrying capacity study and remedial measures to avert environmental disasters from unplanned development; monitoring compliance with committee recommendations; addressing deficiencies in prior reports.

Ratio Decidendi: In eco-sensitive zones, unplanned constructions beyond carrying capacity cause subsidence and landslides; mandatory expert studies, time-bound action plans with monitoring essential; States must implement preventive measures comprehensively to preserve ecological integrity.

Result: Matter disposed with directions for implementation of 19 action points and six-monthly action taken report.

Table of Content
1. unplanned construction exceeds carrying capacity, causing subsidence. (Para 1 , 2)
2. initiation of proceedings and initial inspections reported. (Para 3 , 4 , 5)
3. joint committee constituted for carrying capacity study. (Para 6 , 7 , 8 , 9 , 10)
4. action plan mandated for remedial measures implementation. (Para 11 , 12 , 13)
5. court identifies deficiencies in compliance reports. (Para 14)
6. directions issued for time-bound action plans. (Para 15 , 16)
7. proceedings disposed with ongoing monitoring required. (Para 17 , 18)

-ORDER

Per Dr. A. Senthil Vel, Expert Member

1. These Proceedings were initiated suo motu in view of the captioned media report in respect of the Joshimath disaster, which had led to the displacement of a number of inhabitants and damage to properties. There was reported sinking of the Earth’s surface due to the displacement of sub-surface material. This was on account of excessive unplanned constructions beyond the carrying capacity. This was also a warning for Mussoorie, where unplanned constructions have taken place and are still taking place. Its carrying capacity was studied by the Lal Bahadur Shastri National Academy of Administration (LBSNAA) in 2001, which suggested that no further constructions are viable.

2. On account of unplanned human settlements, natural ecology and recharge of aquifers are affected. Over concretization leads to landslides.

-

3. Advance notice was issued by the Registry of this Tribunal on 17.01.2023 to State PCB, Secretaries, Environment and Urban Development, Uttarakhand and District Magistrate, Dehradun.

4. In response, Mr. Rahul Verma, AAG for the State of Uttarakhand and Mr. Mukesh Verma, Advocate for UKPCB, have entered appearance alongwith Mr. K.K. Misra, ADM (Administration), Dehradun.

5. Shri Misra has submitted that an inspection was conducted on 12.01.2023 regarding seepage and land subsidence of the road adjacent to buildings at Landour Bazar, Mussoorie.

6. In the above background, the study of the carrying capacity of eco- sensitive areas in the Himalayan regions in a holistic manner appeared to be imperative for the protection of environment. Without undermining the need for study in all eco-sensitive areas as already directed, specific study for Mussoorie in the light of apprehensions expressed in the above media report was found necessary to be undertaken. Such a study was to cover the extent of construction that could be allowed and safeguards, measures to be taken for existing buildings and all other relevant and associated aspects, including vehicular traffic, sanitation management, maintaining ecological integrity in terms of soil stability and flora/fauna.

7. For this purpose, a nine-member joint Committee headed by the Chief Secretary, Uttarakhand and other members including Wadia Institute of Himalayan Geology Dehradun, Govind Ballabh Pant National Institute of Himalaya and Environment, National Institute of Hydrology (NIH), Roorkee, Prof. J.S Rawat, Kumaon University, Almora, Space Application Centre, Ahmadabad National Institute of Rock Mechanics, Bangalore, CPCB was constituted and ACS Environment, Uttarkhand was made nodal agency for coordination and compliance.

-

8. The Committee was directed to suggest remedial measures to prevent environmental damage in the light of carrying capacity, hydro- geology studies, geo-morphological studies and also covering other allied and incidental issues. The Committee was given liberty to take assistance from any other expert/institution.

9. In compliance thereof, the Uttarakhand Pollution Control Board with its report dated 24th July, 2023, has filed a status report of the carrying capacity of Mussoorie with preventive and remedial measures which are required to be taken by the authorities concerned.

10. The above measures have been suggested based on research studies of Himalayan districts of the North-Western provinces of India, a study on spring and springshed characterization in Mussoori, Garhwal and other

Click Here to Read the rest of this document
1
2
3
4
5
6
7
8
9
10
11
SupremeToday Portrait Ad
supreme today icon
logo-black

An indispensable Tool for Legal Professionals, Endorsed by Various High Court and Judicial Officers

Please visit our Training & Support