1

Item No. 2

Court No. 1

BEFORE THE NATIONAL GREEN TRIBUNAL

PRINCIPAL BENCH, NEW DELHI

Original Application No. 536/2023

(I.A. No. 685/2023 & I.A. No. 686/2023)

Deepesh Jalal

Applicant

Versus

Ministry of Environment, Forest

& Climate Change & Ors.

Respondent(s)

Date of hearing:

31.08.2023

CORAM:

HONBLE MR. JUSTICE PRAKASH SHRIVASTAVA, CHAIRPERSON

HONBLE MR. JUSTICE SUDHIR AGARWAL, JUDICIAL MEMBER

HONBLE DR. A. SENTHIL VEL, EXPERT MEMBER

Applicant:

Mr. V.K. Shukla & Mr. Sugam Mishra, Advocates

ORDER

Per Justice

Sudhir Agarwal

, Judicial Member

1.

This Original Application (hereinafter referred to as

OA) under

Section 14 of National Green Tribunal Act, 2010 (hereinafter referred to as

NGT Act, 2010

) has been filed by three applicants - Deepesh Jalal S/o

Shri Jeewan Singh resident of Village Devipura, Tehsil Kaladungi, Dist

Nainital; Anil Kumar Walia S/o Surinder Kumar Walia resident of Haripur,

Tehsil Kaladungi, District Nainital and Mahindra Singh Bisht S/o Lal

Singh Bisht resident of Ratanpur West, Tehsil Haldwani District, Nainital

with the prayer that official respondents be directed not to allow

establishment and operation of new distillery plant of 60 KLD to produce

Ethanol (Power alcohol)/ RS, from damaged grain and coarse grain along

with Co-generation power plant of 2 MW by M/s Maa Sheetla Venture

Limited, Respondent No. 5 (hereinafter referred to as

Project Proponent

or PP ) on the proposed site i.e. Khasra No. 26 Ka, 27 Ka, Village Surpur,

Tehsil Kaladungi, District Nainital, Uttarakhand.

2

2.

It is said that the site where Project Proponent intends to establish

this plant comes in the category of semi-critical zone with respect to ground

water and huge requirement of 1117 KLD ground water everyday by the

said plant will create an scarcity of water for drinking and agriculture

purposes in the area concerned. It is also said that Environmental

Clearance (hereinafter referred to as EC) has been granted vide letter

dated 18.01.2022 issued by Ministry of Environment, Forest and Climate

Change (hereinafter referred to as MoEF&CC) which has been obtained by

PP furnishing wrong information/ concealment and/or withholding of

relevant information and therefore PP cannot be allowed to execute project

on the basis of such illegally obtained EC. Giving details of wrong

information/ concealment and/or withholding of relevant information in

Form I and Environment Management Plan (hereinafter referred to as

EMP) submitted by PP for grant of EC, applicants have said as under:

a.

In EMP, PP has said that there is no wildlife corridor in 10 kms

of the proposed site, while just at a distance of 1.7 km, there is

wildlife corridor namely Fatehpur Gadgadia;

b.

PP has drilled water recharge bores without permission of

government bodies for putting waste water into the ground. If

project is allowed to be executed and operated, it is likely to

contaminate ground water in the entire area;

c.

Nearest village disclosed in EMP is Surpur which is about 0.84

kms from the site of proposed plant, though, actually the

nearest village is Devipura which is at a distance of 30 feet from

the site, as there is only a road separating the site and Village

Devipura;

d.

It is wrongly mentioned in the EC that there is a water

body/river named as Gularghati flowing at a distance of 1.3 km

3

in east though no such water body exists in the entire District

Nainital. In fact, there are only two water bodies/rivers in the

area Bhaur and Bakra. River Bakra is perineal and entire water

is used for irrigation in the area of Chakalwa, while river Bhaur

is non-perineal seasonal river flows only in monsoon;

e.

Requirement of fresh water mentioned in EC is beyond the

quantity of fresh water permitted i.e., 4 KL for production of 1

KL ethanol and since the plant capacity is 60 KL ethanol, the

total requirement of groundwater should not exceed 240 KLD;