1
Item No. 2
Court No. 1
BEFORE THE NATIONAL GREEN TRIBUNAL
PRINCIPAL BENCH, NEW DELHI
Original Application No. 536/2023
(I.A. No. 685/2023 & I.A. No. 686/2023)
Deepesh Jalal
Applicant
Versus
Ministry of Environment, Forest
& Climate Change & Ors.
Respondent(s)
Date of hearing:
31.08.2023
CORAM:
HONBLE MR. JUSTICE PRAKASH SHRIVASTAVA, CHAIRPERSON
HONBLE MR. JUSTICE SUDHIR AGARWAL, JUDICIAL MEMBER
HONBLE DR. A. SENTHIL VEL, EXPERT MEMBER
Applicant:
Mr. V.K. Shukla & Mr. Sugam Mishra, Advocates
ORDER
Per Justice
Sudhir Agarwal
, Judicial Member
1.
This Original Application (hereinafter referred to as
OA) under
Section 14 of National Green Tribunal Act, 2010 (hereinafter referred to as
NGT Act, 2010
) has been filed by three applicants - Deepesh Jalal S/o
Shri Jeewan Singh resident of Village Devipura, Tehsil Kaladungi, Dist
Nainital; Anil Kumar Walia S/o Surinder Kumar Walia resident of Haripur,
Tehsil Kaladungi, District Nainital and Mahindra Singh Bisht S/o Lal
Singh Bisht resident of Ratanpur West, Tehsil Haldwani District, Nainital
with the prayer that official respondents be directed not to allow
establishment and operation of new distillery plant of 60 KLD to produce
Ethanol (Power alcohol)/ RS, from damaged grain and coarse grain along
with Co-generation power plant of 2 MW by M/s Maa Sheetla Venture
Limited, Respondent No. 5 (hereinafter referred to as
Project Proponent
or PP ) on the proposed site i.e. Khasra No. 26 Ka, 27 Ka, Village Surpur,
Tehsil Kaladungi, District Nainital, Uttarakhand.
2
2.
It is said that the site where Project Proponent intends to establish
this plant comes in the category of semi-critical zone with respect to ground
water and huge requirement of 1117 KLD ground water everyday by the
said plant will create an scarcity of water for drinking and agriculture
purposes in the area concerned. It is also said that Environmental
Clearance (hereinafter referred to as EC) has been granted vide letter
dated 18.01.2022 issued by Ministry of Environment, Forest and Climate
Change (hereinafter referred to as MoEF&CC) which has been obtained by
PP furnishing wrong information/ concealment and/or withholding of
relevant information and therefore PP cannot be allowed to execute project
on the basis of such illegally obtained EC. Giving details of wrong
information/ concealment and/or withholding of relevant information in
Form I and Environment Management Plan (hereinafter referred to as
EMP) submitted by PP for grant of EC, applicants have said as under:
a.
In EMP, PP has said that there is no wildlife corridor in 10 kms
of the proposed site, while just at a distance of 1.7 km, there is
wildlife corridor namely Fatehpur Gadgadia;
b.
PP has drilled water recharge bores without permission of
government bodies for putting waste water into the ground. If
project is allowed to be executed and operated, it is likely to
contaminate ground water in the entire area;
c.
Nearest village disclosed in EMP is Surpur which is about 0.84
kms from the site of proposed plant, though, actually the
nearest village is Devipura which is at a distance of 30 feet from
the site, as there is only a road separating the site and Village
Devipura;
d.
It is wrongly mentioned in the EC that there is a water
body/river named as Gularghati flowing at a distance of 1.3 km
3
in east though no such water body exists in the entire District
Nainital. In fact, there are only two water bodies/rivers in the
area Bhaur and Bakra. River Bakra is perineal and entire water
is used for irrigation in the area of Chakalwa, while river Bhaur
is non-perineal seasonal river flows only in monsoon;
e.
Requirement of fresh water mentioned in EC is beyond the
quantity of fresh water permitted i.e., 4 KL for production of 1
KL ethanol and since the plant capacity is 60 KL ethanol, the
total requirement of groundwater should not exceed 240 KLD;
f