SupremeToday Landscape Ad
Back
Next
Judicial Analysis Court Copy Headnote Facts Arguments Court observation
Listen Audio Icon Pause Audio Icon
judgment-img

2025 Supreme(Online)(UK) 703043

HIGH COURT OF UTTARAKHAND
PRAKASH JOSHI – Appellant
Versus
UTTARAKHAND POWER CORPORATION LIMITED – Respondent
WPMS 2620 / 2025



Office Notes,

reports, orders

S N L o . .

Date

o o r r d p ir r e o c c t e io e n d s in a g n s d

COURT’S OR JUDGE’S ORDERS

Registrar’s order with Signatures

WPMS 2620/ 2025

Hon’ble Manoj Kumar Tiwari, J.

Mr. Ravi Bisht, Advocate, for the

petitioner.

Mr. Dharmendra Barthwal,

Advocate, for the respondents.

(2) Petitioner claims to be owner of a house situate in Rukutt Compound, Nainital, which was constructed in 2022. Petitioner wants electricity connection, however, his application for electricity connection is not being entertained. By means of this writ petition, petitioner has

sought the following relief:

“i. Issue a writ order or direction

in the nature of mandamus directing the respondent no. 2 to accept the Electricity form of the petitioner and to release a fresh Electricity connection in the name of the petitioner at the address on which connection is sought (i.e. Rukutt Compound, Mallital, Nainital) without any further delay, on such expenses or appropriate charges and fees as this

Hon’ble Court may deems fit.”

(3) Mr. Dharmendra Barthwal, on instructions, submits that since petitioner does not have valid title qua the land over which construction has been raised by him and there is a communication issued by Commissioner, Kumaon Division, in his capacity as Chairman, LDA, requesting the Uttarakhand Power Corporation Ltd. not to issue electricity connection to dissuade people from constructing house in that

area.

(4) Life without electricity cannot be

imagined and electricity has become a basic human right because of changing times. In such view of the matter, refusal on the part of UPCL to provide electricity connection to petitioner does not appear to be justified.

(5) Writ petition is, accordingly, disposed of with a direction to Executive Engineer, Electricity Distribution Division, Nainital to entertain petitioner’s application and provide electricity connection to him, as per law, within ten days from the date of receipt of such application. However, petitioner shall not claim any equity based on this order and if his possession is found to be unauthorised, then the competent authority shall be at liberty to take appropriate action against him.

(Manoj Kumar Tiwari, J.)

11.9.2025 Pr P K R U A M B A O R DH DC21s8Dte.OiN a 5=r gf0tiU3U:4ae5 tcRlT: a 22N =eTl D0I u0A yNO=Fbm R s, 631F 5 io b ga9. U= CK0e n 9 THHr8de =2 2 Id 54GA0a86 N b0R D y C62 CPK17: O9RH3F5UA,3 pEC BNf8oT 9 O9Ds 1+ D1t, 0 FH 5ClaC 7A K9 'oB T 6 U5d0 Me5E=3 A 17,2 R4c6B3 K n9aH =04fP8A 0R N E2A,F D 1BDc, O5o08 u60 = H6 H 2AK IfG UC6Me a1RA4 B56

Click Here to Read the rest of this document
1
2
3
4
5
6
7
8
9
10
11
SupremeToday Portrait Ad
supreme today icon
logo-black

An indispensable Tool for Legal Professionals, Endorsed by Various High Court and Judicial Officers

Please visit our Training & Support
Center or Contact Us for assistance

qr

Scan Me!

India’s Legal research and Law Firm App, Download now!

For Daily Legal Updates, Join us on :

whatsapp-icon Back to top