Page 1 of 33
APPELLATE TRIBUNAL FOR ELECTRICITY AT NEW DELHI
(APPELLATE JURISDICTION)
Appeal No. 20 of 2015
and
Appeal No. 21 of 2015
Dated : 26.05.2022
Present: Hon’ble Mr. Justice R. K. Gauba, Officiating Chairperson
Hon’ble Mr. Sandesh Kumar Sharma, Technical Member
IN THE MATTER OF:
West Bengal State Electricity
Transmission Company Limited
Vidyut Bhavan, Block DJ,
Sector – II, Bidhannagar,
Kolkata – 700091.
.… Appellant (s)
Versus
West Bengal Electricity Regulatory Commission
FD – 415 A, Poura Bhawan,
3rd Floor, Sector – III,
Bidhannagar,
Kolkata – 700106.
.… Respondent(s)
Counsel for the Appellant (s) :
Mr. M. G. Ramachandran, Sr. Adv.
Mr. Hemant Sahai
Mr. Anand K. Srivastava
Mr. Tushar Srivastava
Ms. Molshree Bhatnagar
Ms. Shefali Tripathi
Mr. Neelkandan Rahate
Mr. Ishan Mukherjee
Ms. Anushree Bardhan
Ms. Meghana Aggarwal
Mr. Shubham Arya
Ms. Shruti Dass
Ms. Poorva Saigal
Mr. Mazag Andrabi
Page 2 of 33
Mr. Abhishek Kumar
Mr. Sakya Singh Chaudhary
Mr. Avijeet Lala
Ms. Isha Shekhar
Counsel for the Respondent (s) : Mr. Pratik Dhar, Sr. Adv.
Mr. C. K. Rai
Mr. S. Vallinayagam
Mr. Sumit Panwar
Mr. Paramhans Sahani
Mr. Sachin Dubey
Mr. Mohit Rai
Mr. Umesh Prasad
Ms. Babita Sant for R-1
Page 3 of 33
J U D G M E N T
Per Hon’ble Mr. Sandesh Kumar Sharma, Technical Member
1. The two captioned appeals have been filed by the West Bengal
State Electricity Transmission Company Limited (in short “Appellant” or
“WBSETCL” or “transmission Licensee”) having grievances against the
Annual Performance Review (APR) orders passed by the West Bengal
Electricity Regulatory Commission (herein after “State Commission”, or
“WBERC”)
2. The Appeal No. 20 of 2015 has been filed by the Appellant assailing
the Order dated 10.06.2014 (“Impugned Order 1”) passed by the State
Commission in review petition no. APR (R)-1/12-13 against order dated
19.10.2012 in Case No. APR-26/11-12.
3. The Appellant, being aggrieved by the State Commission order
dated 09.09.2013 (“Impugned Order 2”) in petition no. APR-32/12-13 and
order dated 10.06.2014 (“Impugned Order 1”) in petition no. APR(R)-4/13-
14, filed the second captioned appeal being appeal no. 21 of 2015.
Parties in both the Appeals
4. The Appellant, West Bengal State Electricity Transmission Co. Ltd.,
was incorporated as a public limited company under the Companies Act 1956
on 16.02.2007 and vested with the function of the Transmission Load
Despatch in the State of West Bengal under the West Bengal Power Sector
Reforms Transfer Scheme, 2007 Formulated by the Government of West
Bengal under Section 131 of the Electricity Act, 2003 (hereinafter referred to
as “the Act”). WBSETCL was also designated as the State Transmission
Page 4 of 33
Utility in the state of West Bengal and is a deemed transmission licensee
under the second proviso of Section 14 of the Act.
5. The Respondent, West Bengal Electricity Regulatory Commission is a
statutory body set up under the provisions of the Electricity Regulatory
Commission Act, 1998 (14 of 1998), presently vested powers and functions
as defined under the Electricity Act, 2003.
6. The issues under challenge are common in the two captioned appeals
and are as follows:
A) Appeal no. 20 of 2015
(i)
Rate of interest on Working Capital and
(ii) Incentive
B) Appeal no. 21 of 2015
(i)
Interest on Normative Loan,
(ii) Interest on Normative Working Capital, and
(iii) Advance against Depreciation.
7. The Respondent Commission conceded to revisit the claims of the
Appellant under item no. (i) & (ii) of the Appeal no. 21 of 2015 as such only
issues pertaining to item no. (i) & (ii) in the first captioned appeal and item no.
(iii) of the second captioned appeal are under adjudication.
8. However, the Respondent Commission, in addition to above issues,
also challenged the captioned appeals on the grounds of maintainability. It
was s