Appeal No. 195 of 2022
Page 1 of 24
APPELLATE TRIBUNAL FOR ELECTRICITY AT NEW DELHI
(APPELLATE JURISDICTION)
Appeal No. 195 of 2022
Dated :
15.11.2022
Present: Hon’ble Mr. Justice R. K. Gauba, Officiating Chairperson
Hon’ble Mr. Sandesh Kumar Sharma, Technical Member
IN THE MATTER OF:
Jaiprakash Power Ventures Limited
Having its corporate office at:
JA House, 63 Basant Lok,
Vasant Vihar, New Delhi – 110057
…
Appellant
VERSUS
1.
Uttar Pradesh Power Corporation Limited
Shakti Bhawan, 14 Ashok Marg,
Lucknow – 226 001.
2.
Uttar
Pradesh
Electricity
Regulatory
Commission,
Through its Secretary,
Vidyut Niyamak Bhawan,
Vibhuti Khand, Gomti Nagar,
Lucknow –226010.
3.
Government of Uttar Pradesh
Through its Principal Secretary (Energy),
Bapu Bhawan, Lucknow – 226001.
4.
Government of Uttarakhand,
Through its Principal Secretary
(Irrigation and Power),
Dehradun, Uttarakhand.
….
Respondent(s)
Counsel for the Appellant(s)
:
Mr. Basava Prabhu Patil, Sr. Adv.
Mr. Ramanuj Kumar
Mr. Manpreet Lamba
Ms. Priyal Modi
Mr. Geet Ahuja
Appeal No. 195 of 2022
Page 2 of 24
Counsel for the Respondent(s)
:
Mr. Hemant Sahai
Mr. Nitish Gupta
Ms. Parichita Chowdhary
Mr. Allan Massey
Ms. Puja Priyadarshini
Mr. Shreshth Sharma
Mr. Nitish Gupta
Mr. Sagnik Maitra
Mr. Nipun Sharma
Mr. Nehul Sharma
Ms. Shefali
Mr. Saurobroto Dutta
Mr. Utkarsh Singh
Mr. Nishant Talwar
Mr. Avdesh Mandloi for R-1
J U D G M E N T
PER HON’BLE MR. SANDESH KUMAR SHARMA, TECHNICAL MEMBER
1. The present appeal has been filed by M/s Jaiprakash Power Ventures
Limited (hereinafter referred to as “the Appellant”) against the Order dated
22.02.2021(in short “the Impugned Order”) passed by the Uttar Pradesh
Electricity Regulatory Commission (in short “the State Commission”) in Petition
No. 1376 of 2018.
2. The Appellant is aggrieved by the decision of the State Commission for
not considering its prayer inter alia revision of Design Energy due to Change in
Law (in short “CIL”) event, occurred in the light of judgment passed by the
National Green Tribunal (in short “NGT”) and the Government of India (in short
“GOI”) notifications and also seeking direction for change in the computation of
saleable Design Energy under the provisions of the PPA.
Appeal No. 195 of 2022
Page 3 of 24
3. The Appellant is a generating company, a subsidiary company of
Jaiprakash Power Industries Limited (in short “JIL”) having been set up the
Vishnuprayag Hydro-electric Project (in short “VHEP”) with a capacity of 400
MW in the erstwhile State of Uttar Pradesh, now in the State of Uttarakhand
having signed PPA with Uttar Pradesh Power Corporation Limited (in short
“UPPCL”).
4. The UPPCL, the Respondent No. 1 is a Government company under the
control of the Government of Uttar Pradesh, responsible for planning and
managing the Transmission, Distribution and Supply of electricity.
5. The second Respondent, the State Commission has been established
under the Uttar Pradesh Electricity Regulatory Reforms Act, 1999 and has the
power to adjudicate the dispute in hand.
6. The third and fourth respondents are the Government of Uttar Pradesh
and Government of Uttarakhand.
7. On 14.10.1992, the parent company, JIL has signed an MoU with the
Government of Uttar Pradesh and subsequently with the erstwhile Uttar
Pradesh State Electricity Board (in short “UPSEB”) which was under the direct
control of the Government of Uttar Pradesh.
8. In pursuance to the MoU an agreement was signed on 20.09.1994 (in
short “Agreement”) with the UPSEB, giving permission to the Appellant to
establish, operate and maintain the said Vishnuprayag Hydro Electric Project
with the installed capacity of 400 MW. The initial period of the agreement has
been maintained as 30 years from the date of commissioning with the
Appeal No. 195 of 2022
Page 4 of 24
condition that it can be extended further for 20 years