Page 1 of 12
IN THE APPELLATE TRIBUNAL FOR ELECTRICITY
(Appellate Jurisdiction)
APPEAL NO. 25 OF 2021
Dated:
25.11.2022
Present:
Hon’ble Mr. Justice R.K. Gauba, Officiating Chairperson
Hon’ble Mr. Sandesh Kumar Sharma, Technical Member
In the matter of:
MERINO INDUSTRIES LIMITED
(Formerly known as Merino Panel Products Ltd.)
44 KM Stone, Delhi-Rohtak Road, Village Rohad,
Bahadurgarh, Distt. Jhajjar, Haryana- 124501
… Appellant
VERSUS
1. HARYANA ELECTRICITY REGULATORY
COMMISSION,
Through its Secretary,
Bays 33-36, Sector 4, Panchkula – 134112
2. UTTAR HARYANA BIJLI VITRAN NIGAM
LIMITED,
Vidyut Sadan, Sector-6, Panchkula -134109
3. DAKSHIN HARYANA BIJLI VITRAN NIGAM
LIMITED,
Vidyut Sadan, Vidyut Nagar, Hisar – 125005
… Respondents
Counsel for the Appellant (s)
:
Ms. Swapna Seshadri
Mr. Amal Nair
Ms. Kritika Khanna
Counsel for the Respondent (s)
:
Mr. Sandeep Kumar Mahapatra
Mr. Osheer Verma for R-1
Mr. Samir Malik
Ms. Nikita Choukse for R-2 & R-3
Page 2 of 12
J U D G M E N T (Oral)
PER HON’BLE MR. SANDESH KUMAR SHARMA, TECHNICAL MEMBER
1. The present Appeal has been filed by the Appellant – Merino Panel
Products Limitedchallenging the order dated 01/06/2020 (“Impugned Order”)
passed by the Haryana Electricity Regulatory Commission (hereinafter referred
as the “State Commission”) in Case Nos. HERC/PRO-59 of 2019 and
HERC/PRO-60 of 2019, whereby the State Commission has approved the
Annual Revenue Requirements (“ARR”) of the distribution licensees in the
State of Haryana for FY 2020-21 and also determined the Retail Supply Tariff
payable by the consumers in the State, inter-alia determined the distribution
losses in the State, which are applicable on the open access consumers, such
as the Appellant herein.
Description of the parties:
2. The Appellant is a company incorporated under the provisions of the
Companies Act, 2013 and is engaged in the business of manufacturing of
versatile interior solutions, located in the licenced area of Respondent No. 2.
3. The Respondent No. 1, Haryana Electricity Regulatory Commission is the
State Electricity Regulatory Commission for the State of Haryana, exercising
powers and discharging functions under the provisions of the Electricity Act,
2003.
Page 3 of 12
4. The Respondent Nos. 2 and 3 are the distribution licensees, engaged in
the retail supply and distribution of electricity in their respective areas of licence
in the State of Haryana.
5. The Appellant submitted that this Tribunal has rendered various
judgments, consistently directing the State Commissions to determine the
voltage wise wheeling charges and the voltage wise distribution losses inter-
alia emphasizing that the cost of supply ought to be determined on voltage-
level basis, however, the State Commission through the Impugned Order has
applied the distribution losses by aggregating the HT and LT level losses even
after determining the distribution losses separately contrary to the orders of the
Hon’ble Tribunal and to its own earlier orders, wherein the distribution losses
were segregated to the objective of the Electricity Act.
6. Further added that while the losses were divided between HT and LT
levels in the previous tariff orders, the State Commission ought to have further
segregated them between the loss levels in a further scientific manner by
categorizing it between various voltage-levels, the State Commission has acted
in a regressive manner in pooling the voltage-level which were previously
segregated.
7. This Tribunal has consistently held that cost of supply must be computed
on a voltage-wise basis, in the recent judgment dated 18.08.2020 rendered in
Appeal No. 104 of 2020 titled M/s. Malana Power Company Limited v. Himachal
Pradesh State Electricity Board Limited has inter-alia, held as under:
Page 4 of 12
8. Further, in the judgment rendered on 18.02.2022 in Appeal No. 248 of
2018 (titled Director,