HIGH COURT OF DELHI
DELHI METRO RAIL CORPORATION LTD. – Appellant
Versus
DELHI AIRPORT METRO EXPRESS PRIVATE LIMITED – Respondent
FAO(OS) (COMM)-58/2018
FAO(OS)(COMM) No. 58/2018
Page 1 of 97
$~
*
IN THE HIGH COURT OF DELHI AT NEW DELHI
+
FAO(OS) (COMM) 58/2018 & CM Nos. 13434/2018, 17581/2018
& 31531/2018
Reserved on : 2nd November 2018
Date of decision: 15th January, 2019
DELHI METRO RAIL CORPORATION LTD.
..... Appellant
Through: Mr. P.S. Narasimha, ASG, Mr. Parag P.
Tripathi & Mr. Ajit Kumar Sinha, Sr. Advocates
with Mr. Tarun Johri, Mr. Ankit Saini, Mr.
Srinivasan Ramaswamy & Ms. Athira G. Nair,
Advocates.
versus
DELHI AIRPORT METRO EXPRESS PRIVATE LIMITED... Respondent
Through: Mr.P. Chidambaram, Sr. Advocate with
Mr.Rishi Agrawala, Ms. Megha Mehta Agrawal &
Mr. Nishant Rao, Advocates.
CORAM:
HON'BLE MR. JUSTICE SANJIV KHANNA
HON'BLE MR. JUSTICE CHANDER SHEKHAR
SANJIV KHANNA, J.:
Delhi Metro Rail Corporation Ltd. ('DMRC', for short) in this intra-
Court appeal under Section 37 of the Arbitration and Conciliation Act, 1996
(„A & C‟ Act, for short) read with Section 13 of the Commercial Courts,
Commercial Division and Commercial Appellate Division of the High
Courts Act, 2015 has impugned judgment and order dated 6th March, 2018,
whereby the learned single Judge has dismissed objections under Section 34
2019:DHC:280-DB
FAO(OS)(COMM) No. 58/2018
Page 2 of 97
of the A & C Act upholding the award dated 11th May, 2017 passed by the
Arbitral Tribunal.
2.
DMRC is a state-owned company with equal participation from the
Government of India and the Government of National Capital Territory of
Delhi.
3.
The respondent, Delhi Airport Metro Express Private Limited
('DAMEPL', for short), is a company incorporated as a special purpose
vehicle by the consortium of M/s Reliance Infrastructure Limited and M/s
Construcciones Y Auxiliar de Ferrocarriles SA, Spain („consortium‟, for
short).
4.
The consortium were successful bidders in the international
competitive bidding process for construction, operation and maintenance of
the Delhi Airport Metro Express Line („AMEL‟, for short) based on Public-
Private Partnership model for providing high speed metro connectivity with
maximum speed of 120 Kms per hour between New Delhi Railway Station
and Indira Gandhi International Airport, T-3 Terminal with further line till
Section-21 at Dwarka with underground section of 15.7 Kms and elevated
viaduct section of 7 Kms.
5.
On 25th August, 2008 Concessionaire Agreement ('CA', for short) was
signed and executed between DMRC and DAMEPL.
6.
DMRC had undertaken clearances and borne costs relating to
acquisition of land and in construction of all civil structures like tunnels,
viaducts, station buildings except depot buildings.
2019:DHC:280-DB
FAO(OS)(COMM) No. 58/2018
Page 3 of 97
7.
Design, supply, installation, testing and commissioning of various
railway systems like rolling stock, power supply, overhead equipment,
signaling, track systems, platform, screen doors, ventilation, architectural
finishing etc. were to be provided by DAMEPL, as a private partner in the
project.
8.
As per the CA, DAMEPL was allowed two years period for
completion of obligations and scope of work after they were granted access
to the civil segment by DMRC. DAMEPL was to operate and maintain
AMEL for next 28 years i.e. till August, 2038.
9.
The scheduled commissioning and operation date of AMEL as
stipulated in the CA was 31st July, 2010 which was extended from time to
time to 30th September, 2010. As per Article 16.5 of the CA, the
Commercial Operation Date („COD‟, for short) was to be within two
months from the date of scheduled project completion date, i.e., by 31st
November, 2010. On 11th January,2011 safety clearance/sanction for
operation of the line was granted by the Commissioner of Metro Road
Safety (CMRS) under the Delhi Metro Rail (Operation and Maintenance)
Act, 2002, which is now known as Metro