PUBLIC WORKS DEPARTMENT – Respondent
ARBR 15/2018
['Savita Panjabi', '', 'MUKESH SHARMA', 'A G']
1
AFR
HIGH COURT OF CHHATTISGARH AT BILASPUR
ARBR No. 15 of 2018
Cube Engitech Consultant Pvt. Ltd. Through Its Director Amit Kr Sinha
Jeevan Lok Complex, Hinoo, Main Road, Ranchi, Jharkhand
---- Applicant
Versus
Public Works Department Through Its Engineer In Chief, Bridge Zone,
Sirpur Bhawan Campus, Raipur, Chhattisgarh
---- Respondents
For Applicant
:
Mr. Mukesh Sharma, Advocate
For Respondent
:
Mr. Jitendra Pali, Dy. Advocate General
Hon'ble Shri Justice P. Sam Koshy
Order on Board
13/08/2021
1.
Present is an application under Section 11(6) of the Arbitration and
Conciliation Act, 1996 (hereinafter referred as “the Act of 1996”) seeking
for appointment of an Arbitrator for redressal of the grievances between
applicant and respondent.
2.
The brief facts, relevant for disposal of the present application, are that
the applicant is a Company registered under the Companies Act, 1956
engaged in providing consultancy services inter alia in Traffic Survey,
Techno Economic Feasibility study, preparation of scheme, preparation of
general arrangement drawing for structure, utility identification, soil
investigation, all good for construction drawings, preparation of Bill of
Quantity (BOQ) and other related disciplines.
3.
The respondent State in the instant case had floated a NIT for
appointment of a Consultant for the purpose of providing Techno-
Economic Feasibility Study, Geometric Design, Structural Design, Issue
of Good for Construction Drawings Preparation. The applicant herein
2
having participated in the said tender proceeding was found to be the
most eligible and an agreement as such was entered into between
applicant and respondent.
4.
From bare perusal of the agreement and the nature of tender floated, it
would clearly reflect that the service which was provided to the applicant
was a consultancy service. The agreement entered into between the
parties, Clause-9 envisages settlement of disputes by resorting to
arbitration under the provisions of the Act of 1996 and procedures were
clearly laid down which were to be availed while and before, invoking the
arbitration clause.
5. The contention of applicant is that on account of certain dispute in respect
of non-releasing of the bills raised by applicant, they had approached the
respondent authorities for resolving the dispute by way of arbitration as
agreed upon between the parties by way of an agreement. It is
contended that the respondent authorities did not respond to the
representations and the reminders put forth by the applicant. This non-
response by the respondent led to the filing of the present application
under Section 11(6) of the Arbitration and Conciliation Act, 1996 for
appointment of an Arbitrator.
6. As regards entering into the contract between the parties, the agreement
between the parties and in the agreement there being an arbitration
clause are not in dispute. It is also not in dispute that the nature of work
assigned to the applicant by the respondent was exclusively that of
consultancy.
7. Learned Dy. Advocate General however referring to the reply and to the
stand taken by the respondent, submits that whatever work was assigned
to the applicant herein was in respect of construction of a pathway within
3
the city of Raipur. Therefore, the nature of contract entered into between
the parties is one which could fall within the ambit of “works-contract”
defined under Section 2 (1)(i) Chhattisgarh Madhyastatha Adhikaran
Adhiniyam, 1983 (hereinafter referred as “Adhiniyam, 1983”) and
therefore the present application under Section 11(6) of the Act of 1996
would not be maintainable and the recourse available to applicant herein
would be according to the provisions of Adhiniyam 1983, where the
matter has to be raised before the Tribunal established under the said Act
of 1983.
8. Learned Dy. Advocate General ref