HIGH COURT OF BOMBAY
SAHEB SINGH SHINGARA SINGH SANDHU – Appellant
Versus
MUNICIPAL CORPORATION OF GREATER MUMBAI AND ANOTHER – Respondent
AO 383/2021
Reserved Sr. No.13-AO-383-2021 aw IA-1383-2021.doc
Reserved-15.02.2022
IN THE HIGH COURT OF JUDICATURE AT BOMBAY
CIVIL APPELLATE JURISDICTION
Appeal from Order No. 383 / 2021
Alongwith
Interim Application No. 3183 / 2021
in
Appeal from Order No. 383 / 2021
Saheb Singh Shingara Singh Sandhu
Appellant
Versus
Municipal Corporation of Greater
Mumbai and another
Respondents
****
Mr. G.S. Godbole a/w Mr. Surya Das i/by R.R. Sharma, Advocate for the
Appellant/Applicant.
Mr. Dharmesh Vyas, Advocate for MCGM.
****
CORAM : SANDEEP K. SHINDE, J.
RESERVED ON : 15th FEBRUARY, 2022.
PRONOUNCED ON : 18th FEBRUARY, 2022.
P.C.
Heard. Mr. Godbole, learned Counsel for the Appellant and Mr.
Vyas, learned Counsel for the Corporation.
1.
This appeal under Order-43 Rule-1(r) read with Section 104 of the
Najeeb
1/10
Reserved Sr. No.13-AO-383-2021 aw IA-1383-2021.doc
Reserved-15.02.2022
Civil Procedure Code, challenges the order dated 18th March, 2021
passed in Notice of Motion No. 236/2021 in L.C. Suit No. 195/2021, by
which the learned Judge declined to stay the implementation and
execution of Show Cause Notice issued under Section 351 of the
Mumbai Municipal Corporation Act, 1888 ( MMC Act for short).
2.
Facts in brief are that the MCGM vide Notice dated 29th January,
2020 under Section 351 of the MMC Act, called upon the Appellant-
Plaintiff, to show cause within the stipulated period, as to why, the suit
building or construction, should not be removed or pull down. Suit
construction described in Notice reads as under;
“SCHEDULE : Unauthorised construction of G + 1
structure adm. 25 M x 29.6 M x 6.80 M with the help of
reinforced connect concrete Slab Roof and flooring
supported with B.M. Wall and Channel Section and on
open space and used as guest ( 43 Rooms and 1 Hall )
house, without permission from Competent Authority. ”
3.
Appellant replied the notice and principally relied on and placed
two documents among others, that is Repair Permission dated 27th
Najeeb
2/10
Reserved Sr. No.13-AO-383-2021 aw IA-1383-2021.doc
Reserved-15.02.2022
April, 1984 and City Survey Map for consideration of the Designated
Officer to show that the suit construction was existing prior to detum
line. Ignoring these two documents, Designated Officer by speaking
order dated 18th January, 2021, concluded that notice structure was
erected without permission and noticee could not produced any
document to show that he has applied for regularization, nor he could
established suit structure was erected before 1st April, 1962.
4.
Plaintiff, thus instituted the suit and lodged the legality of the
notice issued under Section 351 of the MMC Act and Speaking Order
dated 18th January, 2021 passed by the Designated Officer. Pending
suit, the learned Judge declined to stay the operation and execution
of the impugned notice and order. Thus, this appeal.
5.
Question falls for consideration is, whether Appellant-Plaintiff,
has prima-facie established that suit structure was erected prior to 1st
April, 1962 AND whether impugned order calls for interference?
Najeeb
3/10
Reserved Sr. No.13-AO-383-2021 aw IA-1383-2021.doc
Reserved-15.02.2022
6.
Mr. Godbole, learned Senior Counsel for the Appellant relied on
the following documents, obtained under Right to Information Act, to
contend that the suit structure standing on CTS No. 1500, new CTS No.
1483 C was in existence prior to 1st April, 1962.
[i]
First document is CTS plan issued by the City Survey Officer,
Mumbai-54;
[ii]
A letter dated 29th September, 1980 addressed to the Appellant
by the Office of Controller of Slum, Bombay, Old Custom House, Fort.
[iii]
Repair permission no. 70 dated 27th April, 1984 granted by the
Municipal Corporation of Greater Mumbai.
[iv]
Particulars relating to Tax Revision Assessment in respect of
suit construction, consisting of ground + one floor.
7.
It may be stated