HIGH COURT OF BOMBAY
DR. D.Y. CHANDRACHUD, J
Brihanmumbai Municipal Corporation thru' the General Manager, BEST Undertaking – Appellant
Versus
Yatish Sharma & Ors. – Respondent
WRIT PETITION NO.264 OF 2006
Important Points
Subject
Electricity Law - Billing Disputes
Act Referred
Headnote
(B) Regulations - The Maharashtra Electricity Regulatory Commission (Electricity Supply Code and Other Conditions of Supply) Regulations, 2005 - Regulation 15 sets billing intervals and guidelines for defective meters. (Paras 10, 12)
Facts of the case:
Petition involves consumers disputing a supplementary bill raised for electricity consumption during a period with insufficient meter readings due to meter failure.
Findings of Court:
The Undertaking shall issue a fresh supplementary bill, adjusting amounts based on regulatory guidelines for the period of defectiveness.
Issues: The key issue revolves around the definition of 'due amount' for electricity consumption and the timing of billing under the Electricity Act.
Ratio Decidendi: Court held that a sum becomes due only upon service of a bill, not merely by consumption of electricity, affirming the Ombudsman’s decision was in error.
Result: Petition allowed; Ombudsman’s order quashed and set aside.
For the Appellants/Petitioners: Mr. Harinder Toor, Mr. J.S. Saluja
For the Respondents: None
| Table of Content |
|---|
| 1. dispute over electricity billing due to meter failure. (Para 1 , 2 , 3 , 4 , 5) |
| 2. discussion on the legal interpretation of 'due' in billing. (Para 6 , 7) |
| 3. court's view on meter regulations and billing practices. (Para 8 , 9 , 10 , 11) |
| 4. court mandates adjustment in supplementary billing. (Para 12) |
| 5. final ruling allows the petition against the ombudsman's order. (Para 13) |
1. The First and the Second Respondents are owners of a factory in which ice cream is manufactured at 131 and 138, C.P. Tank Road, Mumbai 400 004. Initially the unit of the aforesaid consumers was supplied with electricity through two meters being meter Nos. L 770872 and E 992866. The applicable tariff under which the consumers were billed was the industrial GP-1 tariff. On 15th January, 2000 the consumers in the present case made an application for the installation of an electronic meter and for change of the tariff from GP-1 to GP-2 on the ground that the existing consumption which was more than 3000 units per month was likely to increase. On 19th January, 2000 the two existing conventional meters were replaced by an electronic meter bearing No. P 991370. The tariff was changed from GP-1 to GP-2. Between 19th January, 2000 and 27th May, 2000 the readings of the new electronic meter were not taken by the Petitioner or its concerned officials. The explanation of the Petitioner is that the Electronic Data Processing (EDP) Department keeps a record of meters in consumption and it is only after a new meter is recorded with the EDP Department that appropriate cards with new meter numbers are issued to the meter readers. This process takes a few months to be completed. Whatever be the explanation, the factual position is that no meter reading was taken between January and May 2000. On 27th May 2000 a site inspection was carried out at which it was revealed that the electronic meter was found to have stopped and there was no display thereon. The electronic meter was replaced on the same day by another electronic meter bearing No. F 980673. The consumers were informed prior to taking the said action. The replaced meter has thereafter functioned satisfactorily.
2. Between the months of January and May 2000, in the absence of a meter reading, the consumers were billed on an assumed basis. The billing was on the following basis.
| Month | Units Billed |
|---|---|
| January, 2000 | 325 |
| February, 2000 | 350 |
| March, 2000 | 330 |
| April, 2000 | 330 |
| May, 2000 | 330 |
3. The case of the Petitioner is that during the immediately preceding period of 341 days prior to the installation of an electronic meter on 19th January, 2000, the average monthly consumption recorded on the conventional meters was 1992 kwh units. Similarly, when a new electronic meter was installed on 27th May, 2000 (P 980673) in replacement of P 991370, the average monthly consumption during the period of 370 days subsequent to the installation of the meter worked out to 3621 kwh units.
4. A supplementary bill was raised by the Petitioner for the period from 19th January, 2000 to 27th May, 2000 on the basis of the average taken on 3621 kwh units per month. This average as noted above was the average monthly consumption recorded on the new meter, P 980673 between the period 27th May, 2000 and 1st June, 2001. By the supplementary bill a demand of Rs. 78,187.17 was raised on the consumers and debited to the account in the bill for the month of April, 2004.
5. The consumers in the present case approached the Consumer Grievance Reddressal Forum which has been constituted under the provisions of Section 42(5) of the Electricity Act, 2003 . The Forum passed an order (Exhibit A) directing the Petitioner to restrict the amendment of the bill to a period of three months based upon an average to be taken of the period prior to the disputed period. In holding so, the Forum relied upon a directive of the Maharashtra Regulatory Energy Commission dated 23rd February, 2005. The consumers thereupon moved the Third Respondent, who is the O