HIGH COURT OF JUDICATURE AT MADRAS
TMT N PAKKIAM @ ANNA PAKKIAM – Appellant
Versus
THE DIVISIONAL ENGINEER – Respondent
WRIT PETITION 8858/2014
IN THE HIGH COURT OF JUDICATURE AT MADRAS
CAV on 04.07.2014
DATED: 03/11 /2014
CORAM
THE HONOURABLE MR.JUSTICE C.S.KARNAN
W.P.No.8858 of 2014
N.Pakkiam @ Anna Pakkiam
...
Petitioner
Vs.
1.The Divisional Engineer, TNEB,
Tamil Nadu Electricity Board,
Anna Nagar, Chennai – 40.
2.The Assistant Engineer,O 7 M Padi,
Tamil Nadu Electricity Board,
230KVA, SS Complex,
CEDC/West Chennai – 50.
... Respondents
PRAYER: Writ Petition filed under Article 226 of the Constitution
of India to issue a writ of mandamus or any other appropriate
writ, or order or direction in the nature of Mandamus directing the
second respondent to provide Electricity Service Connection at
Survey No.1128/1, Plot No.21, No.202, M.T.H.
Road, Padi, Chennai- 50.
For Petitioner s
: Mr.N.Saravanan
For Respondents
: Mr.P.R.Dilip Kumar
E.B for R1 and R2
O R D E R
The short facts of the case are as follows:-
The Writ Petitioner submits that she is in the permanent
resident address of Korattur Village. The Revenue Authority
allotted Anubantham Patta infavour of her to an extent of 3 cents
of residing Plot in Survey No.1128/1(Natham Poramboke) in the same
village, allotment Patta dated 18.08.1996, when she obtained the
Patta from Tahsildar, Ambattur Municipallity. She has taken
https://hcservices.ecourts.gov.in/hcservices/
possession and build the Kuccha house and residing in the above
address till date without any hindrance. She is a widow, and she
has no other residing place to reside in except the above area
till date.
2. The petitioner additionally added that she is entitled to
a perinela supply of water and electric energy and hence she has
applied for new electricity connection before the second respondent
on 20.04.2014 and the second respondent received her application
and rejected the electricity application on the ground of invalid
reason, the denial attitude by the second respondent states in
reply letter that she does not have address proof and Tax receipt
is a baseless reason, against the natural justice and the second
respondent violated the Constitution of India because she is a
senior citizen of India, her son also did not take care of her
while being so the second respondent as Superior Officer did not
mind about her basic amenities.
3. When she applied with the electricity application before
the second respondent she had made a few clerical mistakes anyway
what are the procedure as followed by the electricity department,
she will follow and is ready to rectify any clerical mistake.
Unfortunately the second respondent rejected her application which
is unwarranted and again dispute arose in reply letter Column 2 to
3 and 5 to 7 it is not at all connected to her property in any way.
She is ready to follow the basic rules as provided by the
electricity board.
4. The second respondent has not yet provided basic
infrastructure to the poor people like her, and is now not
accepting her request for providing electricity connection and the
second respondent has given reply letter to her dated 05.05.2013
and informed her that the application for service connection would
be not be available for seven reasons.
5. The second respondent rejected her application on the
ground of seven grounds, she has not full filled it against the
electricity department because the first and fourth column. As in
the application states the above mistake is ready to be rectified
at any stage. But other five submissions stated by the second
respondent is unwarranted and against the justice and she is not
able to complete the other averments because it is contrary in her
dispute, it is crystal clear that she had obtained Patta from the
local authority and enjoying the possession without any dispute.
The second respondent is not prepared to hear the requests of her
and knowing fully well that the grandsons and granddaughters of the
p