IN THE HIGH COURT OF JUDICATURE AT MADRAS
Dated : 16.02.2021
Coram
THE HONOURABLE MR. JUSTICE M.SUNDAR
O.P.No.859 of 2016
Best Cast Constructions Pvt. Ltd.,
Rep. By Mr.N.Venugopal (President)
No.9, 6th Street
T.N.Nagar, Palanipet
Arakkonam – 631 002
Vellore District
Tamilnadu State
.. Petitioner
vs.
1. The Union of India
Represented by the General Manager
Southern Railway
Head Quarters Office
Park Town
Chennai – 600 003
2. The Chief Engineer
Construction
Southern Railway, Egmore, Chennai – 600 008
Now @ Ernakulam, GCDA Towers
Eastern Entry Tower
1st Floor, Karshaka Road
Ernakulam (South Railway Station)
Kochi – 682 016
Kerala State
3. The Deputy Chief Engineer
1/16
https://www.mhc.tn.gov.in/judis/
O.P.No.859 of 2016
Construction, Southern Railway
First Floor, Railway Station Building
Cannanore (Kannur) – 670 001
Kannur District, Kerala State
... Respondents
Petition filed under Section 34 of Arbitration and Conciliation Act,
1996 to set aside the original award of the Hon'ble Sole Arbitrator dated
05.03.2016 in the Arbitration Proceedings between the Petitioner and
Respondents 1 to 3 to the extent it disallowed the Claim of the Petitioner
and thus render justice.
For Petitioners
: Mr.K.Aparna Devi
For Respondents
: Mr.P.T.Ramkumar
Standing Counsel
for Southern Railways
ORDER
Captioned 'Original Petition' ('OP' for the sake of brevity) is an
application under Section 34 of 'The Arbitration and Conciliation Act,
1996 (Act No.26 of 1996)', which shall hereinafter be referred to as 'A
and C Act' for the sake of brevity, assailing an 'arbitral award dated
05.03.2016' (hereinafter 'impugned award' for the sake of brevity), made
by a Sole Arbitrator, who constituted the 'Arbitral Tribunal' ('AT' for the
sake of brevity) which made the impugned award.
2. The entire lis pertains to a contract awarded by Southern
Railway to 'Best Cast Constructions Pvt. Ltd.,' (hereinafter 'contractor'
2/16
https://www.mhc.tn.gov.in/judis/
O.P.No.859 of 2016
for the sake of convenience). Suffice to say that this contract was inter
alia for doubling of track between Shornur and Mangalore – Cannanore
– Mangalore Section : Construction of Major Bridges with Pile
foundation and Earthwork for approaches, 1) 14 spans of 12.19 M, PSC,
Girder opposite to existing Bridge No.1162 at km 804/8-13 and 2) 1 span
of 15.00M PSC Girder to existing Bridge No.11653 at km 804/17-805/1.
3. Southern Railway floated a tender on 15.07.1998, a formal
agreement was entered into on 28.06.1999 (this formal agreement shall
hereinafter be referred to as 'said contract' for convenience) and 24
months from the date of Letter of Acceptance (22.05.1999) is the time
fixed for completion of said work. In other words, work had to be
completed by 21.05.2001. This Court is informed that contractor had
done another work for Southern Railway, which was treated as a targeted
one, on completing the targeted work satisfactorily, said work was
awarded to contractor and this is the reason for the gap between the date
of acceptance of tender and the issue of Letter of Acceptance. However,
it is not necessary to dilate further on facts owing to the thoroughly
professional approach taken by the two learned counsel before me in the
light of the limited supervisory jurisdiction of a Section 34 Court.
3/16
https://www.mhc.tn.gov.in/judis/
O.P.No.859 of 2016
4. Ms.K.Aparna Devi, learned counsel for contractor (claimant
before AT and petitioner in captioned OP) and Mr.P.T.Ramkumar,
learned Standing Counsel for Southern Railway (Respondents before AT
and Respondents in captioned OP also) were before me. Respondents
before AT, who are also respondents in captioned OP, shall be referred
to as 'Southern Railway' for convenience.
5. Regarding lis between contractor and Southern Railway, suffice
to say