HIGH COURT OF JAMMU & KASHMIR AND LADAKH
HON'BLE THE CHIEF JUSTICE
CHIEF ENGINEER SYSTEM AND OPERATION WING JKPTCL JAMMU – Appellant
Versus
M/S KEC INTERNATIONAL LTD – Respondent
Arb P/6/2020
HIGH COURT OF JAMMU AND KASHMIR
AT JAMMU
CJ Court
Case: Arbitration Petition AA Nos. 4 - 9 of 2020
Chief Engineer System and Operation
Wing JKPTCL, Jammu.
…Petitioner(s)
Through: Sh. G. A. Lone, Advocate.
Sh. Amit Gupta, AAG
v/s
M/s KEC International Limited.
…. Respondent(s)
Through: Sh. Pranav Kohli, Sr. Advocate
with Sh. Rahul Sharma, Advocate.
CORAM: HON’BLE THE CHIEF JUSTICE
ORDER
01.
Heard Sh. G. A. Lone, and Sh. Amit Gupta, counsel for the
petitioners and Sh. Pranav Kohli, senior counsel assisted by Sh. Rahul Sharma,
counsel for the respondent.
02.
All the above petitions have been preferred by the Chief Engineer
System and Operation Wing Jammu and Kashmir Power Transmission
Corporation Limited (JKPTCL) Jammu allegedly under Section 14 of the
Arbitration and Conciliation Act 1996 read with Section 29 A (4) of the
Jammu and Kashmir Arbitration and Conciliation Act 2018 for holding that the
mandate of the three member arbitral tribunal be determined in conducting
arbitration cases Nos. 4-9 of 2020 all titled as ‘Chief Engineer System and
Operation Wing JKPTCL, Jammu versus. M/s KEC International Limited’ and
for setting aside the order of tribunal dated 29.10.2019 and 09.11.2019 by
Sr. No. 203 &204
2
Arbitration Petition AA Nos.4 - 9 of 2020
which it has ruled that its mandate do not stand determined as alleged by the
petitioner.
03.
The arbitral tribunal of three arbitrators was having six identical
arbitration cases being arbitration Nos. 1 to 6 titled as ‘KEC International
versus State and others’. The hearing of arbitration cases 1 and 2 is complete.
Arguments in arbitration case 4, 5, and 6 have also been heard; the tribunal is
hearing arbitration case No. 3. However, since the proceedings were
considerably delayed, the applications were moved by this petitioner stating
that the mandate of the arbitral tribunal stood determined by efflux of time as it
had failed to make the awards within the stipulated time. These applications
were rejected during the course of hearing on 29.10.2019 as recorded by the
arbitral tribunal and a reasoned order was subsequently pronounced on
09.11.2019.
04.
The references to the arbitral tribunal were made on 14.11.2013
and the arbitral tribunal entered into the arbitrations on 23.09.2014 where upon
first sitting took place in September itself. In the meantime, the Jammu and
Kashmir Arbitration Act 1996 was amended by Jammu and Kashmir
Arbitration and Conciliation(Amendment) Act 2018 and notified to be enforced
with effect from 1st October 2018.Itprovided for insertion of Section 29A to the
principle Act after originally existing Section 29 of the said Act. The relevant
part of the said newly inserted Section 29-A of the Act reads as under:
“29A Time limit for arbitral award ---(1) The
award shall be made within a period of twelve
months from the date the arbitral tribunal enters
upon the reference.
3
Arbitration Petition AA Nos.4 - 9 of 2020
Explanation :--
For the purpose of this sub-
section, an arbitral tribunal shall be deemed to have
entered upon the reference on the date on which the
arbitrator or all the arbitrators, as the case may be,
have
received
notice,
in
writing,
of
their
appointment.”
05.
The aforesaid newly inserted provision lays down the time period
for making the award and provides that the award shall be made within a
period of 12 months from the date arbitral tribunal enters upon the reference.
06.
It is in view of the aforesaid amended provision that the petitioner
submits that as no award has been made within 12 months of entering into the
arbitration or from the date of commencement of the aforesaid amendment Act,
the mandate of the arbitrators stands determined.
07.
Sh. Lone further submits that the arbitral tribunal manifestly erred
in law in rejectin