2019 Supreme(Online)(KER) 24771

IN THE HIGH COURT OF KERALA AT ERNAKULAM

3PRESENT

THE HONOURABLE MR. JUSTICE P.SOMARAJAN

MONDAY, THE 27TH DAY OF MAY 2019 / 6TH JYAISHTA, 1941

RSA.No. 563 of 2006

AGAINST THE JUDGMENT DATED 12-04-2006 IN AS 5/2003 OF SUB

COURT, HOSDRUG

AGAINST THE JUDGMENT DATED 20-12-2002 IN OS 678/1999 of

MUNSIFF COURT, HOSDRUG

DEFENDANT/APPELLANT/APPELLANT:

* K.M.VISHNU NAMBEESAN,

PRESIDENT, KALLAR SREE MAHAVISHNU KSHETRA, COMMITTEE,

R/AT KALLAR, PANATHADY VILLAGE, P.O. KALLAR, HOSDURG

TALUK, KASARAGOD DISTRICT.

THE KALLAR MAHAVISHNU KSHETRA COMMITTEE REPRESENTED

BY ITS PRESIDENT, VISHNU NAMBEESAN, PANATHADY

VILLAGE, P.O. KALLAR, HOSDURG TALUK, KASARGOD

DISTRICT

NAME AND ADDRESS OF THE APPELLANT IS CORRECTED AS

ABOVE AS PER ORDER DATED 27.05.2019 IN I.A. 1/2019

BY ADV. SRI.KODOTH SREEDHARAN

PLAINTIFF/RESPONDENT/RESPONDENT:

SULOCHANA, W/O.VEDSA VYASA BHAT,

R/AT AYAROT, KODOTH VILLAGE,, HOSDSURG TALUK,

KASARAGOD.

BY ADV. SRI.T.MADHU

THIS REGULAR SECOND APPEAL HAVING BEEN FINALLY HEARD ON

27.05.2019, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING:

RSA.No. 563 of 2006 2

Aggrieved by the decree and judgment of both

the trial court and the first appellate court, the

defeated defendant came up with this appeal.

2.

The suit is one for permanent prohibitory

injunction pertaining to B schedule way.

Subsequently the suit was amended by incorporating

the prayer for mandatory injunction directing the

defendant to remove the gate installed subsequent to

the institution of the suit at the entrance of the B

schedule way.

3.

The suit was contested by the defendant

stating that the plaintiff was permitted to go

through the defendant's property. It is admitted by

the defendant that there is a mud road which

according to the defendant will not reach up to the

property of plaintiff. The mud road was maintained

as means of access to the property lying on the

back of temple, belonged to the temple. From

RSA.No. 563 of 2006 3

there, there is only a pedestrian way leading to

the property and house of the plaintiff. Hence,

disputed the claim of plaintiff. It is also inter

alea contended that the claim by way of easement by

necessity and easement by prescription are mutually

destructive cannot be granted.

4.

The trial court and the first appellate

court up held the contention raised by the

plaintiff and decreed the suit rejecting the

contention raised by the defendant.

5.

The following substantial questions came up

for consideration:

(i) Whether the courts below justified in

holding that the plaintiff has perfected a

prescriptive right of easement over the plaint B

schedule road, when it is found to be not extent up

to the dominant heritage or any way leading to it ?

(ii)

Is not the right of the plaintiff as

admitted in the written statement only a license as

a grantee to use plaint B schedule road for

RSA.No. 563 of 2006 4

pedestrian access as provided in between the points

R and P of Exhibit C4 plan ?

6.

Regarding the claim of easement by

necessity and easement by prescription, it is

settled that both are mutually destructive as the

ingredient which constitute prescriptive right

would sprout from the user of a stretch of land for

the purpose of convenient user of the dominant

heritage and necessity would arise only on

severance of tenement in the absence of means of

access to the property. The plaintiff cannot raise

and advance easement by prescription and easement

by necessity at the very same time as the former

one stands on user of way as of right through the

servient tenement and the latter one, on absolute

necessity due to non existence of way.

7.

On coming into the merits and the question

raised, the commissioners, who visited the

property, the initial commissioner and the survey

commissioner had located the B schedule way in a

RSA.No. 563 of 2006 5

different location and with different alignment. As

per Ext.C2 rough sketch prepared by the initial

commissioner the B schedule way lying in 'L' shape

starting from western road, i.e Adakam Kallar Road

proceed towards east then takes a deviation towards

north and then ends in abruptly in the middle of

temple property, the property of the defendant. The

survey commissioner has also located the very same

way but in a different shape some what, in the

shape of 'S' starting from the very same road but

not from west but from south. The survey

commissioner has located the way with double doted

line only up to the temple property which ends

abruptly on the back side of the temple property.

It will not reach up to the property of plaintiff.

So the alignment of B schedule property and its

identity shown differently in Ext.C2 rough sketch

and C4 survey plan. Coming into the plaint schedule

description it is seemed to be so unfortunate that

the B schedule description is incorporated without

RSA.No. 563 of 2006 6

showing the starting point of the way, its

alignment and location, the portion in which it

passes throug