RSA.No. 563 of 2006
AGAINST THE JUDGMENT DATED 12-04-2006 IN AS 5/2003 OF SUB
COURT, HOSDRUG
AGAINST THE JUDGMENT DATED 20-12-2002 IN OS 678/1999 of
MUNSIFF COURT, HOSDRUG
DEFENDANT/APPELLANT/APPELLANT:
* K.M.VISHNU NAMBEESAN,
PRESIDENT, KALLAR SREE MAHAVISHNU KSHETRA, COMMITTEE,
R/AT KALLAR, PANATHADY VILLAGE, P.O. KALLAR, HOSDURG
TALUK, KASARAGOD DISTRICT.
THE KALLAR MAHAVISHNU KSHETRA COMMITTEE REPRESENTED
BY ITS PRESIDENT, VISHNU NAMBEESAN, PANATHADY
VILLAGE, P.O. KALLAR, HOSDURG TALUK, KASARGOD
DISTRICT
NAME AND ADDRESS OF THE APPELLANT IS CORRECTED AS
ABOVE AS PER ORDER DATED 27.05.2019 IN I.A. 1/2019
BY ADV. SRI.KODOTH SREEDHARAN
PLAINTIFF/RESPONDENT/RESPONDENT:
SULOCHANA, W/O.VEDSA VYASA BHAT,
R/AT AYAROT, KODOTH VILLAGE,, HOSDSURG TALUK,
KASARAGOD.
BY ADV. SRI.T.MADHU
THIS REGULAR SECOND APPEAL HAVING BEEN FINALLY HEARD ON
27.05.2019, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING:
RSA.No. 563 of 2006 2
Aggrieved by the decree and judgment of both
the trial court and the first appellate court, the
defeated defendant came up with this appeal.
2.
The suit is one for permanent prohibitory
injunction pertaining to B schedule way.
Subsequently the suit was amended by incorporating
the prayer for mandatory injunction directing the
defendant to remove the gate installed subsequent to
the institution of the suit at the entrance of the B
schedule way.
3.
The suit was contested by the defendant
stating that the plaintiff was permitted to go
through the defendant's property. It is admitted by
the defendant that there is a mud road which
according to the defendant will not reach up to the
property of plaintiff. The mud road was maintained
as means of access to the property lying on the
back of temple, belonged to the temple. From
RSA.No. 563 of 2006 3
there, there is only a pedestrian way leading to
the property and house of the plaintiff. Hence,
disputed the claim of plaintiff. It is also inter
alea contended that the claim by way of easement by
necessity and easement by prescription are mutually
destructive cannot be granted.
4.
The trial court and the first appellate
court up held the contention raised by the
plaintiff and decreed the suit rejecting the
contention raised by the defendant.
5.
The following substantial questions came up
for consideration:
(i) Whether the courts below justified in
holding that the plaintiff has perfected a
prescriptive right of easement over the plaint B
schedule road, when it is found to be not extent up
to the dominant heritage or any way leading to it ?
(ii)
Is not the right of the plaintiff as
admitted in the written statement only a license as
a grantee to use plaint B schedule road for
RSA.No. 563 of 2006 4
pedestrian access as provided in between the points
R and P of Exhibit C4 plan ?
6.
Regarding the claim of easement by
necessity and easement by prescription, it is
settled that both are mutually destructive as the
ingredient which constitute prescriptive right
would sprout from the user of a stretch of land for
the purpose of convenient user of the dominant
heritage and necessity would arise only on
severance of tenement in the absence of means of
access to the property. The plaintiff cannot raise
and advance easement by prescription and easement
by necessity at the very same time as the former
one stands on user of way as of right through the
servient tenement and the latter one, on absolute
necessity due to non existence of way.
7.
On coming into the merits and the question
raised, the commissioners, who visited the
property, the initial commissioner and the survey
commissioner had located the B schedule way in a
RSA.No. 563 of 2006 5
different location and with different alignment. As
per Ext.C2 rough sketch prepared by the initial
commissioner the B schedule way lying in 'L' shape
starting from western road, i.e Adakam Kallar Road
proceed towards east then takes a deviation towards
north and then ends in abruptly in the middle of
temple property, the property of the defendant. The
survey commissioner has also located the very same
way but in a different shape some what, in the
shape of 'S' starting from the very same road but
not from west but from south. The survey
commissioner has located the way with double doted
line only up to the temple property which ends
abruptly on the back side of the temple property.
It will not reach up to the property of plaintiff.
So the alignment of B schedule property and its
identity shown differently in Ext.C2 rough sketch
and C4 survey plan. Coming into the plaint schedule
description it is seemed to be so unfortunate that
the B schedule description is incorporated without
RSA.No. 563 of 2006 6
showing the starting point of the way, its
alignment and location, the portion in which it
passes throug