2023 Supreme(Online)(P&H) 7742
HIGH COURT OF PUNJAB AND HARYANA
RAKESH KUMAR – Appellant
Versus
SURESH KUMAR – Respondent
CR 375 2023
IN THE HIGH COURT OF PUNJAB AND HARYANA AT
CHANDIGARH
(1)
CR-375-2023 (O&M)
Reserved on: 03.05.2023
Date of pronouncement: 09.05.2023
Rakesh Kumar
...Petitioner
Versus
Suresh Kumar
...Respondent
(2)
CR-340-2023 (O&M)
Rakesh Kumar
...Petitioner
Versus
Suresh Kumar
...Respondent
CORAM: HON'BLE MR.JUSTICE H.S. MADAAN
H.S. MADAAN
, J.
By this judgment, I intend to dispose of above mentioned
revision petitions having almost identical facts.
2.
Briefly stated facts of the case are that petitioner Rakesh
Kumar and his brother Suresh Kumar respondent are co-owners of two
parcels of land, first measuring 65-K-3M, second having an area of
SUMIT KUMAR
2023.05.15 14:58
I attest to the accuracy and
authenticity of this order/judgment
37K-13M adjoining to each other situated at Village Sidhrawali, Tehsil
Manesar, District Gurugram; petitioner Rakesh Kumar had filed two
suits seeking partition of the said parcels of land; civil suit bearing
No.85 of 2017 with respect to 65K-3M and civil suit No.86 of 2017
regarding 37K-13M.
3.
On getting notice, defendant Suresh Kumar had appeared
and filed written statement cum counter claim contending that all the
joint property should be included in the same suit and the plaintiff had
intentionally filed two separate suits regarding the joint property, in
that way, suit is bad for partly partition. The defendant contended that
besides the suit property of the main suit, the land measuring 37K-13M
was also joint property of the parties to the suit where a petrol pump,
service station and weighment bridge (dharamkanta) are installed in the
land comprised in rectangle No.5, killa No.22/2/2/2, 21/3/2/2/2 and
rectangle No.14, killa No.2. The land comprised in rectangle No.5,
killa No.18/2/2/1, rectangle No.14, killa No.3 is lying vacant. An old
go-down is there in rectangle No.5 killa No.23 whereas a double
storied house is constructed in rectangle No.5, killa No.23 and some
portion of the said killa is lying vacant. The land comprised in
rectangle No.5, killa No.15/1, 16/2, 17/1, 24 and 25/1 is lying vacant,
though CLU with regard to the same has been obtained and a go-down
has already been constructed in the area having rectangle No.14 killa
No.4, 5/1, 6/2, 7 and 14. The construction of go-down was raised by
obtaining loan from the bank by mortgaging the suit land. The
SUMIT KUMAR
2023.05.15 14:58
I attest to the accuracy and
authenticity of this order/judgment
construction is not yet complete. The plaintiff had authorized the
defendant to operate the loan account and loan amount has been paid
by the defendant. He has invested maximum amount in obtaining CLU,
paying requisite fee etc. The plaintiff did not pay his half share in
outstanding dues, therefore, the defendant has filed a suit for recovery
against him. In para No.9 of the written statement, the defendant had
suggested the mode of partition of joint property. In the counter claim
filed by him, the defendant had sought partition of the entire joint land.
4.
The plaintiff filed replication to the counter claim
admitting that another chunk of land is also there which is a joint
property of the parties. He denied that the defendant has been running
petrol pump, service station and weighment bridge. The plaintiff stated
that the mode of partition suggested by the defendant is not acceptable
to him.
5.
From the pleadings of the parties, following issues were
framed on 06.08.2018:-
SUMIT KUMAR
2023.05.15 14:58
I attest to the accuracy and
authenticity of this order/judgment
6.
Similarly in the other suit with regard to partition of land
measuring 37K-13M filed by plaintiff Suresh Kumar against Rakesh
Kumar bearing No.85 of 2017, on getting notice, defendant Rakesh
Kumar had appeared and filed written statement cum counter claim
almost on the same lines as in the other suit bearing No.86 of 2017.
Issues in that suit were also framed. However, both the suits were
consolidated and after completion of