HIGH COURT OF PUNJAB AND HARYANA
M/S IMPACT PROJECTS PRIVATE LIMITED AND ANOTHER – Appellant
Versus
PUNJAB STATE POWER CORPORATION LIMITED AND OTHERS – Respondent
CWP 23009/2019
CWP No.23009 of 2019
-1-
IN THE HIGH COURT OF PUNJAB AND HARYANA
AT CHANDIGARH
CWP No.23009 of 2019(O&M)
Date of Decision:07.04.2021
M/S IMPACT PROJECTS PRIVATE LIMITED
AND ANOTHER
...Petitioners
Versus
PUNJAB STATE POWER CORPORATION LIMITED
AND OTHERS
...Respondents
CORAM: HON'BLE MR. JUSTICE ANIL KSHETARPAL
Present:
Mr. Gurminder Singh, Sr. Advocate with
Mr. J.S.Gill, Advocate,
for the petitioners.
Mr. Naveen S. Bharadwaj, Advocate
for the respondents.
ANIL KSHETARPAL, J.
1.
Through this writ petition, filed by two separate companies
having a common management, the following substantive reliefs have been
sought:-
“i.
Summon the entire record of the case. i. Issue of writ in
nature of Mandamus directing the respondent no. 1 to
release the electricity connections to the residents of the
colonies established/built by the petitioners as in relation
to two colonies namely Garden Enclave Extension-1 and
Garden Enclave Extension I the petitioners have already
completed the installation of LD system and as far as the
remaining colonies, wherein NOCS have been issued by
Corporation, are concerned the petitioners are ready to
deposit the bank guarantee in relation to incomplete LD
system as per the letter dated 06.06.2019 (Annexure
NARESH KUMAR
2021.05.05 10:35
I attest to the accuracy and
integrity of this document
Chandigarh
CWP No.23009 of 2019
-2-
P-22).
ii.
With further prayer for issuance of writ in the nature
certiorari for quashing the letter dated 15.01.2018
(Annexure P-16), and 22.08.2019 (Annexure
P-20)whereby the respondents in a completely illegal and
arbitrary manner has directed the petitioners to obtain
the NOC from respondent no. 1 afresh by treating six
different approved colonies as one and by considering
their combined load under Punjab State Electricity
Commission (Electricity Supply Code and Related
Matters Regulations 2014, whereas, these regulations
are not applicable to the colonies of the petitioners as
different colonies set up by the petitioner were approved
by way of separate schemes and orders between 2002 to
2006 and all the six colonies were separately registered
by the PUDA/Competent Authority under PAPR Act,
1995 and separate NOCS were already granted by the
respondent no. 1 earlier i.e. between 2007 to 2008.”
In the considered opinion of this Bench, the question which
arises for consideration is:-
“If the Electricity Distribution licensee gives No
Objection Certificate to set up a colony under Section 5
of the Punjab Apartment and Property Regulation Act,
1995 (hereinafter referred to as 'the Regulation Act,
1995'), then subsequently, whether it is bound to supply
the power/electricity under the Supply Code applicable
at the time of issuance of the NOC irrespective of the
time/period which has elapsed from the date of issuance
of the NOC to the completion of the colony?
FACTS
2.
The petitioners are developers and colonizers. They got the
NARESH KUMAR
2021.05.05 10:35
I attest to the accuracy and
integrity of this document
Chandigarh
CWP No.23009 of 2019
-3-
approval/licence to develop various contiguous pieces of vacant land. The
first project i.e. Garden Enclave with respect to land measuring 49.78 acres
was approved on 04.01.2002 by the Punjab Urban Development Authority
(hereinafter referred to as PUDA) for carving out 513 residential plots.
Thereafter, on 28.07.2003, the petitioners got the approval of the second
project i.e 'Garden Enclave Extension-I' with respect to the land measuring
18.83 acres. Subsequently, on the application of the petitioner, PUDA
granted approval to develop 4.84 acres of land vide a communication dated
10.09.2004. Thereafter, on 30.06.2006, the fourth project i.e. 'Impact Park'
comprising an area of 8.84 acres was approved by the PUDA. Thereafter,
on 11.08.2006, the fifth project under the name of 'Impact Estates'