HIGH COURT OF PUNJAB AND HARYANA
S.C VERMA – Appellant
Versus
STATE OF HARYANA & ORS – Respondent
RSA 4357/2010
IN THE HIGH COURT OF PUNJAB & HARYANA AT CHANDIGARH
R.S.A. No. 4357 of 2010
Date of decision: September 04, 2012
S.C. Verma
.. Appellant
Vs.
Haryana State and others
.. Respondents
R.S.A. No. 4358 of 2010
S.C. Verma
.. Appellant
vs.
Haryana State and others
.. Respondents.
Coram:
Hon'ble Mr. Justice A.N. Jindal
Present:
Mr. Chander Shekhar, Advocate for the appellant.
A.N. Jindal, J
This judgment shall dispose of two connected regular second
appeal Nos. 4357 and 4358 of 2010, involving the similar question of law.
However, for convenience, facts are being taken up from R.S.A. No. 4357
of 2010.
The suit filed by the plaintiff-appellant for declaring the order
dated 29.5.2006 passed by the defendant No.2 and the order dated
16.11.2007 passed by the defendant No.4 as illegal, null and void, was
decreed by the trial court on 16.5.2009. However, the appeal filed against
the said judgment and decree by the respondents-defendants was accepted
by the appellate court on 27.2.2010 and the suit filed by the plaintiff was
dismissed, which is now under challenge before me in this regular second
appeal.
The plaintiff was posted as Junior Engineer from 7.7.1991 to
1.8.1996 in Pundri Water Services, Service Division, Kaithal where he was
served a show cause notice containing the following allegations :-
1.
The appellant while being Junior Engineer, In-charge of
Rohera minor from reach 0 to 30000 framed four
R.S.A. No. 4357 of 2010 &
R.S.A. No. 4358 of 2010
-2-
number estimates for silt clearance of the minor by
splitting the whole reach into smaller sub reaches.
Estimated cost of all the four estimates is less than
Rs.20,000/- which falls in the financial competency of
Executive Engineer to sanction. By keeping the cost of
each estimate as less than Rs.50,000/-, the necessity of
inviting tender through press as per para 2.67 PWD
Code has been given a go bye. Though he is very junior
official and subject to pressure of higher officers but in
the present case he has done so willingly as he never
pointed out the irregularities while framing the
estimates. Thus, Sh. S.C. Verma, Junior Engineer
infringed upon para 2.67 PWD Code by framing and
submitting the estimates by splitting the whole reach of
the said works into sub reaches to circumvent the rules
pertaining to financial power to sanction and press
tender.”
The plaintiff filed reply to the show cause notice and after
providing him opportunity of being heard personally, the order dated
1.3.2006 was passed whereby his two increments without cumulative effect
were stopped. He preferred appeal but the same was also dismissed. Thus,
the plaintiff has challenged the aforesaid orders by way of filing the suit.
The suit was contested by the defendants. The defendants
reiterated that the plaintiff was not working properly and was not
discharging his duties faithfully. He, in order to circumvent the rule of the
PWD Code and to avoid the necessary tenders and sanctioning of the work
and to bring the estimates within the financial competency of the Executive
Engineer splitted the work estimate into four estimates, therefore, charge
sheet was served upon him and after compliance of the whole procedure, the
punishing authority awarded the punishment of stoppage of two annual
increments without cumulative effect. The punishment being minor penalty,
no elaborate procedure was required to be followed.
R.S.A. No. 4357 of 2010 &
R.S.A. No. 4358 of 2010
-3-
As regards R.S.A. No. 4358 of 2010, it also involves the
similar issue as to whether regular enquiry was required to be held before
passing the minor penalty. In this case, the work on whole reach from RD
102000 to 126000 was got completed in a closure of one week duration by
employing labour at four to five points at one time. The work was
completed within such a short duration which was not possible. Actually
the fictitiou
Login now and unlock free premium legal research
Login to SupremeToday AI and access free legal analysis, AI highlights, and smart tools.
Login
now!
India’s Legal research and Law Firm App, Download now!
Copyright © 2023 Vikas Info Solution Pvt Ltd. All Rights Reserved.